IT Project Manager

SOC 15-1299

Information Technology Project Managers · scope, authorization, and delivery boundariesSource scope · statistical definition · human reviewUS values use the broader parent-group definition · mainland China gaps retained per evidence
58%AI Impact ScoreFermatMind / 费马测试

IT project managers coordinate technology delivery. They clarify scope, track dependencies, risks and changes, and organize acceptance with engineering, business and vendor teams. Technical and business decisions may have different owners.

Model impact index for three equally weighted representative core tasks; not a measured share of working time or a job-loss probability. floor((50+75+50)/3+0.5)=58; fermatmind-ai-impact-v1; 2026-10-18.

Median annual wage 116,580 USD (May 2025, BLS data presented by O*NET, broader parent-group definition)U.S. parent occupation median pay (2025)O*NET / U.S. Bureau of Labor Statistics
+5.1%Parent occupation: U.S. projected employment change (2025–2035)U.S. Bureau of Labor Statistics
Source: U.S. Bureau of Labor Statistics|US|2025–2035|projected employment percent change; Editorial conversion: BLS Table 1.2: U.S. parent occupation Computer Occupations, All Other 15-1299 had about 471,200 jobs in 2025 and is projected to have about 495,300 in 2035 (+5.1%), with about 27,000 openings per year. Counts are rounded independently; projected openings include replacements and do not measure current hiring.
About 471,200 jobsParent occupation: U.S. jobs (2025)U.S. Bureau of Labor Statistics
Source: U.S. Bureau of Labor Statistics|US|2025|employment base; Editorial conversion: BLS Table 1.2: U.S. parent occupation Computer Occupations, All Other 15-1299 had about 471,200 jobs in 2025 and is projected to have about 495,300 in 2035 (+5.1%), with about 27,000 openings per year. Counts are rounded independently; projected openings include replacements and do not measure current hiring.
About 27,000 per yearParent occupation: U.S. annual openings (2025–2035)U.S. Bureau of Labor Statistics
Source: U.S. Bureau of Labor Statistics|US|2025–2035|projected job openings; Editorial conversion: BLS Table 1.2: U.S. parent occupation Computer Occupations, All Other 15-1299 had about 471,200 jobs in 2025 and is projected to have about 495,300 in 2035 (+5.1%), with about 27,000 openings per year. Counts are rounded independently; projected openings include replacements and do not measure current hiring.
No data availableMainland China precise occupation wage (not obtained)

Quick judgment

What kind of person fits information technology project management?

Assume judgment | Real fit comes from whether you can accomplish three things at once in the same job: make project delivery solid (define scope and milestones, sequence stages and resources, monitor progress and quality, handle issues and changes, and produce reviewable project plans, status, and acceptance records); keep coordination and standards under control (confirm requirements and priorities, change review and approval, cost and schedule baselines, risk and issue escalation, executed per agency and contract requirements); and carry definable job responsibilities (be accountable for your own plans and conclusions, and request or hand off scope commitments, budget adjustments, or acceptance conclusions beyond your authority per process). It is suggested to test with one verifiable experience (complete a fully fictional IT project plan and status retrospective) rather than relying only on the conclusions of an interest questionnaire.

Caution signal | This page corresponds to O*NET-SOC 15-1299.09 "Information Technology Project Managers". The official scope is: plan, initiate, and manage information technology (IT) projects; lead and direct technical staff; serve as a liaison between business and technology; plan project stages and assess the business impact of each stage; monitor progress to ensure deadlines, standards, and cost targets are met. The occupation is flagged Bright Outlook. The core difficulty is not drawing Gantt charts but the trade-offs among scope, schedule, cost, and quality, and coordinating conflicts across business and technical teams. Risks come from scope creep and misjudged requirements, schedule and cost commitments lacking a basis, delivery failing to meet quality standards, and treating tool output as authorization or acceptance conclusions. BLS Table 1.2: U.S. parent occupation Computer Occupations, All Other 15-1299 had about 471,200 jobs in 2025 and is projected to have about 495,300 in 2035 (+5.1%), with about 27,000 openings per year. Counts are rounded independently; projected openings include replacements and do not measure current hiring. If you find it hard to bear multi-party coordination, deadline pressure, and accountability for results, you should weigh these as real costs needing serious consideration.

Who is more likely to fit IT Project Manager?

Fit signal | The work activities of O*NET 15-1299.09 are mainly coordinating the work of others, communicating with supervisors and peers, obtaining information, organizing and prioritizing, using computers, and developing teams. If you are willing to continuously coordinate around scope, schedule, cost, quality, and stakeholders, can accurately record assumptions, decisions, and variances, and can push forward steadily under deadline and conflict pressure, these daily requirements are closer to your way of working; interest and personality tools are only for designing experiments and cannot judge hiring eligibility or performance.

When should you be cautious about choosing IT Project Manager?

This is a work-sample check, not a personality diagnosis or hiring conclusion.

How can a small experiment test your fit for IT Project Manager?

To judge whether you fit information technology project management, first run a verifiable exercise with public or simulated material: set up a fully fictional IT project scenario (for example, a project plan for launching a batch of fictional systems), write out the process from confirming goals and scope, identifying stakeholders and requirements, sequencing stages and milestones, allocating resources and scheduling, monitoring progress and quality, to change review and retrospective, and mark the checkpoints and possible problems at each step (requirement or scope creep, schedule and cost commitments lacking basis, unclear quality or acceptance criteria, inconsistent cross-team definitions, changes implemented without review). After completing it, check: whether scope, changes, baselines, and acceptance criteria are treated as non-omittable items; whether budget adjustments or acceptance conclusions beyond your personal authority are written as requests or handoffs; whether the process is left as reviewable records. All material must be fictional; do not use real client or contract information.

Career profile

IT project managers coordinate technology delivery. They clarify scope, track dependencies, risks and changes, and organize acceptance with engineering, business and vendor teams. Technical and business decisions may have different owners.

Occupational quick answers

What could a first IT project management work sample show?

Use a fictional system migration. List scope, dependencies, risks, owners and acceptance criteria. Highlight a decision the project team cannot make on its own.

Objects:

  1. 01IT projects, scope and baselines, resources and teams

Inputs:

  1. 01Goals and authorization, requirements and priorities, baselines and contract terms
DeliverablesProject plans, status and risk records, acceptance and retrospective

How does an IT project manager differ from a product manager?

IT project managers coordinate delivery, risks and acceptance. Product managers commonly focus on user value and what to prioritize. Some organizations combine the roles.

DimensionPrimary trackComparison track
LoopAuthorization, sequencing, monitoring, and retrospective
Step oneConfirm goals and scope
Step twoIdentify stakeholders and requirements
Step threeSequence stages and milestones
Step fourAllocate resources and schedule
Step fiveMonitor progress and quality
Step sixChange review and retrospective

Core responsibilities

  1. 01

    Input objects | The objects are IT projects, requirements and scope, schedule and cost baselines, resources and teams, and quality and risk; execute planning, coordination, and monitoring within authorization and contract boundaries.

  2. 02

    Checkable outputs | Reviewable project plans and milestones, resources and scheduling, status and risk records, change review records, and acceptance and retrospective conclusions; results must be traceable to requirements, baselines, and approval records.

  3. 03

    Complete workflow | Confirm goals and scope → identify stakeholders and requirements → sequence stages and milestones → allocate resources and schedule → monitor progress and quality → change review and retrospective.

What is the qualification boundary?

Qualification, authorization, and final responsibility are still verified by the specific jurisdiction, agency, or employer; courses or certificates do not automatically grant licenses or signing authority.

  1. Boundary

    Requires independent verification

  2. Jurisdiction

    Confirm per applicable rules

  3. Agency

    Confirm per the authorization chain

  4. Training

    Confirm per position requirements

  5. Responsibility

    Confirmed by the responsible person

  6. Evidence

    Retain reviewable records

Work reality

Key judgments
O*NET work context shows: email 95% daily, telephone conversations 80% daily, work with others in a group or team 75% extremely important, continual contact with others 57%, face-to-face discussions 60% daily, time pressure 52% daily. The basis for judgment is evidence of requirements and scope, baselines of schedule and cost, and the authorization and contract requirements for change, quality, and acceptance.

O*NET structured fields

Research inputs
Research inputs
O*NET2026 precise tasks, context, and ECI; Job Zone4, education survey 38% bachelor's, 24% associate's/other two-year, 19% post-baccalaureate certificate; not a uniform legal threshold. 2025 parent-group national annual wages at the 10/25/50/75/90 percentiles 55,940/79,370/116,580/157,500/188,470 USD, median hourly wage 56.05 USD; not precise 15-1299.09 wages. O*NET officially presents the Computer Occupations, All Other (SOC15-1299) parent group: 2025 employment 471,200 rising to a projected 495,300 in 2035, growth 5%, average annual openings 27,000 from 2025—2035 (including growth and replacement); not a precise IT project manager projection.

The work objects of information technology project managers and the AI boundary AI can assist with organizing records and summarizing information, but cannot replace authorization judgments and final responsibility.

Career direction comparison

Adjacent occupation comparison

Compare core outputs, responsibility boundaries, and work patterns, not interchange by name.

Adjacent occupation comparison
Career directionCore work and outputKey differencesBest-fit choice
General and Operations ManagersGeneral and operations managers direction | The core output is organization-wide operational efficiency, cost, and staffing. This occupation targets the scope, schedule, cost, and quality of a single IT project; the objects managed and the assessment measures differ, and sharing coordination skills does not mean the responsibility is the same.The core output is organization-wide operational efficiency, cost, and staffing.Compare if you are willing to take on organization-level operations and governance.
Administrative Services ManagersAdministrative services managers direction | The core output is office and administrative service processes, budget, and staffing. This occupation focuses on delivery of technical projects and coordination of technical teams; deliverables and responsibility boundaries differ and cannot be interchanged by job title alone.The core output is office and administrative service processes, budget, and staffing.Compare if you are willing to do administrative processes and team management.
Computer and Information Systems ManagersComputer and information systems managers direction | The core output is coordination and governance of organization-level IT resources, systems, and project portfolios. This occupation focuses more on planning, monitoring, and change control of a single project; the authorization level and scope differ and must be checked separately.The core output is coordination and governance of organization-level IT resources, systems, and project portfolios.Compare if you are willing to expand from single-project management to project portfolio governance.
Architectural and Engineering ManagersArchitectural and engineering managers direction | The core output is coordination of design, construction, and acceptance of engineering projects. This occupation focuses mainly on IT projects and software delivery; the technical domain, compliance requirements, and acceptance standards differ and cannot be applied to each other.The core output is coordination of design, construction, and acceptance of engineering projects.Choose after comparing the domain differences between IT projects and engineering projects.

How to choose

Adjacent occupations require filling in tools, qualifications, and responsibility evidence separately.

Next, verify the direction with observable deliverables.

AI impact on this career

The work objects of information technology project managers and the AI boundary: which steps may be assisted and which judgments must be borne by people.

No measured adoption rate, productivity, or net job effect of generative AI for this precise occupation was obtained; the summarization, comparison, and drafting of scope, plans, schedule, cost, and cross-team coordination are editorial trial candidates and require checking the original evidence, permissions, and actual effects, without giving substitution probabilities or timelines. AI Impact Score 58% is an editorial estimate. Model impact index for three equally weighted representative core tasks; not a measured share of working time or a job-loss probability. floor((50+75+50)/3+0.5)=58; fermatmind-ai-impact-v1; 2026-10-18.The three tasks, ratings and sources are listed in the FermatMind method source record on this page.

AI assessment method and sources

FermatMind AI Impact Score estimation method v1

FermatMind / 费马测试 · 2026-10-18

  • Model impact index for three equally weighted representative core tasks; not a measured share of working time or a job-loss probability. floor((50+75+50)/3+0.5)=58; fermatmind-ai-impact-v1; 2026-10-18.
  • Anchors: 0 negligible; 25 preparation or record assistance; 50 substantial assistance; 75 most information output can be formed by AI with review; 100 almost all of the selected task can be done by AI and independently verified.
  • Identify stakeholders requirements and scope — 50/100; weight=1/3
  • Plan project milestones and resources — 75/100; weight=1/3
  • Monitor quality and coordinate change reviews — 50/100; weight=1/3

Editorial ratings use the existing occupational responsibilities and AI task analysis on this page. They are not adoption rates, measured effects, job-disappearance or personal-unemployment probabilities, or official scores from Stanford or another external institution. No measured time weights or future robot deployment are assumed.

Task ability

First distinguish assistable tasks from final responsibility.

Adoption conditions

A technical demonstration does not equal organizational adoption.

Job outcomes

Displacement timelines cannot be inferred from task exposure.

Task impact matrix

Comparison of AI impact across career tasks
Work areaTaskCurrent changeHuman control point
Scope and planningOrganize recordsEditorial trial candidate: organizing, comparing, or drafting material, no measured adoption and effects for this occupation were obtained.Check the original records and failure modes.
Coordination and communicationExecute core tasksEditorial trial candidate: organizing, comparing, or drafting material, no measured adoption and effects for this occupation were obtained.Human control points: you must go back to the original data and approval records and review key judgments, and bear responsibility for goals and scope, schedule and budget commitments, and change and acceptance conclusions.
Progress and qualityKey judgmentsEditorial trial candidate: organizing, comparing, or drafting material, no measured adoption and effects for this occupation were obtained.Check the agency's actual decision, approval, and execution responsibilities, and refer exceptions to the responsible person; do not apply a military chain of command.
Retrospective and improvementProduce a retrospective recordEditorial trial candidate: organizing, comparing, or drafting material, no measured adoption and effects for this occupation were obtained.The responsible person confirms the conclusion.

Why does employment evidence reach different conclusions?

O*NET supports the precise project tasks and context, and wages/trends support parent-group statistics, but does not support AI effects; editorial candidates and NIST AI RMF governance do not measure adoption rate, productivity, or net job outcomes for this occupation.

Information Technology Project Managers 15-1299.09

View source ↗
Subject
Precise project tasks, or 15-1299 parent-group statistics; each per the linked original object
Finding
Cannot prove AI adoption, efficiency gains, or authorization; candidates are editorial task analyses.
Limitation
Parent-group statistics are not the precise occupation; tasks do not measure AI effects.

Information Technology Project Managers Summary

View source ↗
Subject
Precise project tasks, or 15-1299 parent-group statistics; each per the linked original object
Finding
Cannot prove AI adoption, efficiency gains, or authorization; candidates are editorial task analyses.
Limitation
Parent-group statistics are not the precise occupation; tasks do not measure AI effects.

National employment trends for 15-1299.09

View source ↗
Subject
Precise project tasks, or 15-1299 parent-group statistics; each per the linked original object
Finding
Cannot prove AI adoption, efficiency gains, or authorization; candidates are editorial task analyses.
Limitation
Parent-group statistics are not the precise occupation; tasks do not measure AI effects.

Why does impact differ by work direction?

Editorial comparison: recording and drafting may be trialed for assistance, no measured relative speedup or adoption order was obtained; decisions and authorization should be checked against the actual position, agency, and jurisdiction.

Scope and plan coordination

AI primarily changesInformation organizing

Human responsibility remainsResponsibility and authorization

Progress and quality tracking

AI primarily changesSearch and retrospective

Human responsibility remainsOriginal record check

Accountability must remain intact when AI enters professional workflows

Editorial governance suggestion: clarify inputs, task scope, review, and exception handoff; for specific conduct involving legal obligations, check the law separately; governance frameworks and occupational task material do not create uniform prohibitions.

  1. Check inputs

    Confirm the source, permissions, and version.

  2. Limit the task

    Assist only within the known scope.

  3. Human review

    The responsible person reviews the output.

  4. Record and escalate

    Stop and report immediately on exceptions.

Professional risks of using AI

Wrong input

Will amplify wrong conclusions.

Control: Check the original material.

Authority overreach

Will change the responsibility boundary.

Control: Handle per the authorization chain.

Automation misreading

May miss exceptions.

Control: Retain human judgment.

How should different audiences respond?

Entrants

Practice with reviewable work samples.

Incumbents

Retain process and failure records.

Managers

Set authority and stop conditions first.

Common questions about AI and career development

Will AI replace information technology project manager jobs?

No adoption, effects, substitution probability, or timeline for this precise occupation was obtained; task descriptions, exposure, and governance suggestions do not equal job causality, and outputs must be verified against actual authority.

Source: NIST AI RMF and editorial task analysisOriginal source ↗

Can task exposure infer a displacement timeline?

No adoption, effects, substitution probability, or timeline for this precise occupation was obtained; task descriptions, exposure, and governance suggestions do not equal job causality, and outputs must be verified against actual authority.

Source: NIST AI RMF and editorial task analysisOriginal source ↗

Can tool output replace change and acceptance judgments?

No adoption, effects, substitution probability, or timeline for this precise occupation was obtained; task descriptions, exposure, and governance suggestions do not equal job causality, and outputs must be verified against actual authority.

Source: NIST AI RMF and editorial task analysisOriginal source ↗

First check the inputs, versions, and responsibilities for scope, plans, schedule, cost, and cross-team coordination, then evaluate tools in an authorized environment; there is no evidence of universal efficiency gains or irreplaceability.

Chinese mainland salary reference

Occupation name comparison | Information technology project managers (US O*NET-SOC 15-1299.09 Information Technology Project Managers). China's public statistics have no single-occupation wage corresponding to this precise occupation; industry averages cannot masquerade as the median, and the Chinese page language does not constitute a Chinese equivalent occupation or wage mapping.

Occupational scope | The China-side conclusions on this page are limited to the mainland China market and the current statistical definitions; public statistics are published by industry category and do not distinguish occupations, so this page does not present occupation-level values.

Official statistical definition

Insufficient evidence: mainland China public occupational statistics have not established a national occupational wage distribution for information technology project managers precisely corresponding to US O*NET-SOC 15-1299.09; the National Bureau of Statistics publishes average wages by industry category and does not distinguish occupations, and this page does not substitute industry averages, job postings, or US data.

Insufficient evidence: no safe mapping established

No safe value available

Insufficient evidence: no safe mapping established

No safe value available

Insufficient evidence: no safe mapping established

No safe value available

Scenario-based reference

Precise wages for this occupation in China were not obtained. Only when the employer is in information transmission, software, and IT services, NBS2025 non-private/private average annual wages are 248,752/128,166 yuan; scientific research and technical services 182,064/83,560 yuan. These are national industry-wide, all-occupation pre-tax annual averages, not the median/starting pay/take-home or demand for this occupation.

This scenario is only used to explain the definition, not an individual quote.
Position scopeReference valueExplanation
Insufficient evidence: no safe mapping established (high school/secondary vocational)Verify against agency announcementsDo not use proxy figures.
Insufficient evidence: no safe mapping established (junior college)Verify against agency announcementsDo not use proxy figures.
Insufficient evidence: no safe mapping established (bachelor's)Verify against agency announcementsDo not use proxy figures.
Insufficient evidence: no safe mapping established (other)Verify per the specific jurisdictionDo not use proxy figures.

Influencing factors

Information transmission, software, and information technology services (industry category)

No safe value available

Scientific research and technical services (China NBS category)

No safe value available

Public administration, social security, and social organizations (industry category)

No safe value available

AI and wage judgment boundary

AI and wage judgment boundary | Generative AI may assist with organizing records and generating drafts, but does not change the fact that this occupation's pay is determined by the employing agency, industry, and job duties; this page does not score AI exposure for this occupation or infer wages from it.

U.S. salary reference

US wage reference | BLS data presented by O*NET (May 2025). The following values are officially presented under the broader parent group "Computer Occupations, All Other" and are not wages for the precise O*NET 15-1299.09 occupation.

2025 parent-group national annual wages at the 10/25/50/75/90 percentiles 55,940/79,370/116,580/157,500/188,470 USD, median hourly wage 56.05 USD; not precise 15-1299.09 wages. O*NET officially presents the Computer Occupations, All Other (SOC15-1299) parent group: 2025 employment 471,200 rising to a projected 495,300 in 2035, growth 5%, average annual openings 27,000 from 2025—2035 (including growth and replacement); not a precise IT project manager projection.

BLS OEWS2025 parent-group employer-reported pre-tax wages; includes production bonuses and similar, excludes overtime premiums, shift differentials, nonproduction bonuses, and benefits, and is not take-home pay or total cost. Definition: https://www.bls.gov/opub/hom/oews/concepts.htm

BLS OEWS2025 parent-group employer-reported pre-tax wages; includes production bonuses and similar, excludes overtime premiums, shift differentials, nonproduction bonuses, and benefits, and is not take-home pay or total cost. Definition: https://www.bls.gov/opub/hom/oews/concepts.htm
PercentileAnnual referenceMonthly equivalentExplanation
Low percentile55,940 USD/year (broader parent-group definition)Annual threshold; not converted into an individual take-home monthly wageParent-group percentile, not this precise occupation or years of service.
Median116,580 USD/year (broader parent-group definition)Annual threshold; not converted into an individual take-home monthly wageParent-group percentile, not this precise occupation or years of service.
High percentile188,470 USD/year (broader parent-group definition)Annual threshold; not converted into an individual take-home monthly wageParent-group percentile, not this precise occupation or years of service.

Wage · 10th percentile:55,940 USD/year (parent group);Computer Occupations, All Other, not the precise IT project manager; source: https://www.onetonline.org/link/localwages/15-1299.09

Wage · 25th percentile:79,370 USD/year (parent group);Computer Occupations, All Other, not the precise IT project manager; source: https://www.onetonline.org/link/localwages/15-1299.09

Wage · median:116,580 USD/year (parent group);Computer Occupations, All Other, not the precise IT project manager; source: https://www.onetonline.org/link/localwages/15-1299.09

Wage · 75th percentile:157,500 USD/year (parent group);Computer Occupations, All Other, not the precise IT project manager; source: https://www.onetonline.org/link/localwages/15-1299.09

Wage · 90th percentile:188,470 USD/year (parent group);Computer Occupations, All Other, not the precise IT project manager; source: https://www.onetonline.org/link/localwages/15-1299.09

The parent group covers multiple different computer occupations, not only technical management positions, and is neither the precise IT project manager nor an individual quote.

Is this an individual quote?

Not an individual quote, starting pay, or take-home pay.

Does this cover the precise occupation?

15-1299 parent group, not the precise 15-1299.09.

What is the period?

Wages 2025, projection 2025—2035.

Can it be compared across markets?

China's industry-wide all-occupation averages and the US parent-group percentiles cannot be stitched together.

Industry definitions | The O*NET industry page shows the main industries for this parent group in the US are Professional, Scientific, and Technical Services and Government; industry distribution, hiring demand, and annual openings are different indicators and cannot be conflated into a single growth rate.

Industry definitions | The O*NET industry page shows the main industries for this parent group in the US are Professional, Scientific, and Technical Services and Government; industry distribution, hiring demand, and annual openings are different indicators and cannot be conflated into a single growth rate.
IndustryIndustry valueHow to interpret
Precise IT project manager industry wagesNo safe value availableNo within-industry wages for 15-1299.09 were obtained this round; parent-group industry distribution cannot substitute for precise wages or hiring demand.
Precise IT project manager industry wagesNo safe value availableNo within-industry wages for 15-1299.09 were obtained this round; parent-group industry distribution cannot substitute for precise wages or hiring demand.
Precise IT project manager industry wagesNo safe value availableNo within-industry wages for 15-1299.09 were obtained this round; parent-group industry distribution cannot substitute for precise wages or hiring demand.
Precise IT project manager industry wagesNo safe value availableNo within-industry wages for 15-1299.09 were obtained this round; parent-group industry distribution cannot substitute for precise wages or hiring demand.

Influencing factors | Employer type (corporate, government, professional services), industry, region, project scale, and employment form affect actual income level and stability; the percentiles on this page are statistical positions and do not correspond to specific years of experience.

Qualification

Check the target position's education, experience, or project certificate requirements; no uniform certificate wage premium was obtained.

Experience

Check project scale and actual resource responsibility; do not map percentiles to years.

Region

Use local statistics and quotes for the same occupation/period; national parent-group percentiles cannot give a regional premium.

Employment outlook and job openings

Employment · size

471,200 to 495,300 people (2025—2035) (parent group)

Computer Occupations, All Other, not the precise IT project manager; source: https://www.onetonline.org/link/localtrends/15-1299.09

Employment · growth

5% (2025—2035) (parent group)

Computer Occupations, All Other, not the precise IT project manager; source: https://www.onetonline.org/link/localtrends/15-1299.09

Employment · openings

27,000/year (2025—2035) (parent group)

Computer Occupations, All Other, not the precise IT project manager; source: https://www.onetonline.org/link/localtrends/15-1299.09

Fit signals

To work as an information technology project manager, which interests, abilities, and ways of working matter more? This page discusses fit only with work samples and responsibility boundaries, and does not use personality labels to replace judgments of eligibility and performance.

Direct answer | The fit signal is whether you can complete goal and scope definition, sequencing and coordination, and progress and quality checks following procedure, handle data and records accurately, and escalate when uncertain — not a personality label. Interest and personality tools can only help design experiments and cannot judge hiring eligibility, authorization, or performance.

Positive signals: Positive signals | Able to complete scope and stage sequencing, milestone and status tracking to standard; able to check requirements, baselines, and variances and identify problems; able to leave decisions and processes as reviewable records and hand off accurately within authorization and contract boundaries.

Caution conditions: Caution conditions | Risk signals include sacrificing quality or skipping reviews to hit schedule, not escalating scope creep, using tool output to replace change and acceptance judgments, or being unwilling to report conflicts up the authorization chain; if you find it hard to bear multi-party coordination, deadline pressure, and accountability for results, you should weigh these as real costs needing serious consideration.

Trial action: Trial action | Run an exercise with a fully fictional IT project scenario: define goals and scope, sequence stages and milestones, give status and risk records, and write a change review and retrospective; test with observable deliverables rather than an interest questionnaire alone.

Do not let one test decide your career

RIASEC

official_descriptive

Check with work samples rather than replacing judgment with labels.

The current O*NET interest ECI (enterprise, conventional, investigative) is an occupational activity preference, not an individual competence or hiring conclusion.

  • Observable tasks
  • Process records

Do not use it this way: Cannot be used to infer hiring, qualification, or performance.

Learn about RIASEC

Big Five personality

editorial

Check with work samples rather than replacing judgment with labels.

No validation study of the Big Five predicting performance in this precise occupation was obtained; no absolute conclusion that personality cannot predict at all is drawn.

  • Observable tasks
  • Process records

Do not use it this way: Cannot be used to infer hiring, qualification, or performance.

Learn about Big Five personality

MBTI

editorial

Check with work samples rather than replacing judgment with labels.

No validity of MBTI type for occupational performance was obtained; task ability is not a substitute for type validation.

  • Observable tasks
  • Process records

Do not use it this way: Cannot be used to infer hiring, qualification, or performance.

Learn about MBTI

Enneagram

editorial

Check with work samples rather than replacing judgment with labels.

No validity of Enneagram for occupational performance was obtained; observe actual task preferences.

  • Observable tasks
  • Process records

Do not use it this way: Cannot be used to infer hiring, qualification, or performance.

Learn about Enneagram

Cognitive ability

editorial

Check with work samples rather than replacing judgment with labels.

No uniform IQ threshold or validity of this page's scales for occupational performance was obtained; check actual data and method tasks.

  • Observable tasks
  • Process records

Do not use it this way: Cannot be used to infer hiring, qualification, or performance.

Learn about cognitive ability

Emotional ability

editorial

Check with work samples rather than replacing judgment with labels.

No validity of emotional ability scales for performance was obtained; observe communication, explaining the basis, and feedback behavior.

  • Observable tasks
  • Process records

Do not use it this way: Cannot be used to infer hiring, qualification, or performance.

Learn about emotional ability

Which work directions may fit you better?

Scope and requirements management

Fits better when: Likes to clarify goals, scope, and acceptance criteria.

Watch for: Requirement changes must go through review and approval.

Schedule and cost control

Fits better when: Willing to track milestones, variances, and resource use.

Watch for: Commitments and baseline adjustments require authorization.

Stakeholder coordination and communication

Fits better when: Good at aligning definitions and priorities across multiple teams.

Watch for: Conflict escalation requires a clear decision maker.

Risk and change management

Fits better when: Willing to identify risks and manage change impact.

Watch for: Tool output cannot be treated as approval.

Technical delivery coordination

Fits better when: Likes to bridge business requirements and technical implementation.

Watch for: Needs to fill in evidence of technical options and dependency management.

Quality and acceptance management

Fits better when: Willing to check quality standards and acceptance evidence.

Watch for: Acceptance conclusions are determined by the contract and authorization chain.

Career fit questions

Which tasks do you like?

Check whether you are willing to continuously handle scope, plans, schedule, cost, and cross-team coordination and the related evidence.

Can you bear the work pace?

Check the specific unit's deadlines, shift rotation, conflicts, and exception pace; do not make a uniform assumption across the occupation.

Are you willing to record the process?

Are you willing to record sources, assumptions, versions, and open questions.

Can you escalate when uncertain?

When evidence is insufficient, can you state the limits and hand them to the responsible person with authority.

Do you understand the authorization boundary?

Distinguish task ability, approval authority, execution authority, and statutory requirements.

Can you review a failure?

Can you explain the source, impact, and improvement points of variances.

Are there observable deliverables?

Observe actual deliverables and verification communication; do not substitute a questionnaire for qualification.

What is the next trial?

First check the target position's tasks, education, and authority; work and trial content are retained within the original protected scope.

Risks and boundaries

Work risks and boundaries of information technology project managers

Risks must be handled by trigger, consequences, control, and escalation boundary.

Project risks and controls are editorial analysis, and occupational tasks support the object; personal information law supports the China processing boundary, and NIST supports AI governance. Wages, employment trends, and database entries do not serve as project control specifications.

01

Scope and baseline risk | Trigger: requirement or scope creep, schedule and cost commitments lacking a basis, baseline changes without approval. Consequences: may cause overruns and disputes among parties. Control: clarify scope and baselines, changes require review and approval, variances escalated by threshold. Boundary: scope and budget adjustments are approved by authorized personnel per agency rules.

Typical scenario:Requirement or scope creep, schedule and cost commitments lacking a basis, baseline changes without approval.

Roles most affected:Information Technology Project Managers

Possible consequence:May cause overruns and disputes among parties.

How to reduce risk:Editorial check suggestion: clarify scope and baselines, changes require review and approval, variances escalated by threshold. Actual approval and handling responsibilities are checked against the agency/contract and applicable jurisdiction.

Evidence:FermatMind project risk editorial analysis

02

Delivery quality risk | Trigger: skipping reviews or testing to hit milestones, unclear acceptance criteria. Consequences: may cause rework, quality incidents, or failed acceptance. Control: execute reviews and verification per quality standards, retain acceptance evidence and versions. Boundary: acceptance conclusions are determined by the contract and authorization chain.

Typical scenario:Skipping reviews or testing to hit milestones, unclear acceptance criteria.

Roles most affected:Information Technology Project Managers

Possible consequence:May cause rework, quality incidents, or failed acceptance.

How to reduce risk:Editorial check suggestion: execute reviews and verification per quality standards, retain acceptance evidence and versions. Actual approval and handling responsibilities are checked against the agency/contract and applicable jurisdiction.

Evidence:FermatMind project risk editorial analysis

03

Stakeholder and communication risk: when requirements, priorities, or resource conflicts are unresolved, rework or standstill may result; check the actual decision responsibilities and record the issues, and do not assume that all projects are ultimately decided by management.

Typical scenario:Inconsistent definitions between the requirements side and the technical team, priority conflicts not escalated.

Roles most affected:Information Technology Project Managers

Possible consequence:May cause rework, damaged trust, or stalled decisions.

How to reduce risk:Editorial check suggestion: clarify the decision maker and escalation path, retain meeting and decision records. Actual approval and handling responsibilities are checked against the agency/contract and applicable jurisdiction.

Evidence:FermatMind project risk editorial analysis

04

Information handling risk: when the purpose or sharing scope of client data or personal information is unclear, check the processing basis, purpose, and necessity; specific obligations are checked by conduct and jurisdiction, and general project delivery does not directly apply automated decision-making clauses for personal information.

Typical scenario:Client or business material, or personal information, processed or sent outside the authorized scope.

Roles most affected:Information Technology Project Managers

Possible consequence:May cause compliance risk and harm to rights.

How to reduce risk:Editorial check suggestion: process per minimum necessity and the authorized scope, keep processing and sharing records. Actual approval and handling responsibilities are checked against the agency/contract and applicable jurisdiction.

Evidence:China Personal Information Protection Law

05

Common escalation rules | Once scope, baselines, or authorization conditions are insufficient, stop the related steps first and hand off the facts, impact, and open questions as reviewable records to the responsible person with authority; do not go past contracts, professional opinions, or organizational authorization, and do not use model output to replace agency authorization and final responsibility.

Typical scenario:Project milestones and cross-team dependencies cause information to be out of sync.

Roles most affected:Information Technology Project Managers

Possible consequence:May cause distorted status and delayed decisions.

How to reduce risk:Editorial check suggestion: unify the status definition and update cadence, retain versions and the basis. Actual approval and handling responsibilities are checked against the agency/contract and applicable jurisdiction.

Evidence:FermatMind project risk editorial analysis

06

Authorization and record risk

Typical scenario:Continuing to push forward when scope, baselines, or authorization conditions are insufficient.

Roles most affected:Information Technology Project Managers

Possible consequence:May go past contracts, professional opinions, or organizational authorization.

How to reduce risk:Editorial check suggestion: stop the related steps first and hand off the facts, impact, and open questions to the responsible person with authority. Actual approval and handling responsibilities are checked against the agency/contract and applicable jurisdiction.

Evidence:FermatMind project risk editorial analysis

Entry path

How to become an information technology project manager: entry preparation, training, and responsibility path. Entry preparation should start with understanding the official duties, design and planning, management coordination, and data; specific training and employment requirements are determined by employers or competent authorities, and courses and certificates do not automatically grant licenses or signing authority.

O*NET2026 education survey 38% bachelor's, 24% associate's/other two-year, 19% post-baccalaureate certificate; Job Zone4 is a group preparation description and is not a bachelor's threshold for all IT project managers. Check the specific project tasks, experience, supervision, and approval responsibilities.

Entry and trial

01

Understand the goal scope

Typical scope:Editorial responsibility scope: understanding the goal scope must follow the specific job tasks and authorization; stage names do not represent a uniform job level or automatic approval authority.

Readiness evidence:Reviewable evidence | Demonstrate ability with a fully fictional IT project scenario: scope and milestone plan, resources and scheduling, status and risk records, change review and retrospective; do not use real client, contract, or personal data, and note the basis and assumptions.

Credential boundary:Check the target position's education, experience, training, and actual duties; check certificates, hiring, approval, and execution authority separately.

Next moves:Next action | Complete one fictional project plan and retrospective record, ask an experienced person to challenge your scope judgments, baseline control, and escalation path, and use that to judge whether to keep investing in this direction; prove ability with observable deliverables rather than course names.

02

Check requirements and acceptance

Typical scope:Editorial responsibility scope: checking requirements and acceptance must follow the specific job tasks and authorization; stage names do not represent a uniform job level or automatic approval authority.

Readiness evidence:Retain reviewable deliverables.

Credential boundary:Check the target position's education, experience, training, and actual duties; check certificates, hiring, approval, and execution authority separately.

Next moves:Transition path | Before transitioning, first list transferable abilities (scope and requirements management, schedule and cost control, stakeholder coordination, risk and change management, record keeping), then clarify the new position's tools, qualifications, and responsibility evidence that must be filled in; moving toward general and operations, administrative services, computer and information systems management, architectural and engineering management, or logistics engineering requires filling in each field's domain and governance evidence.

03

Sequence plans under supervision

Typical scope:Editorial responsibility scope: sequencing plans under supervision must follow the specific job tasks and authorization; stage names do not represent a uniform job level or automatic approval authority.

Readiness evidence:Retain reviewable deliverables.

Credential boundary:Check the target position's education, experience, training, and actual duties; check certificates, hiring, approval, and execution authority separately.

Next moves:Fill in tools, qualifications, and responsibility evidence.

04

Confirm resources and approvers

Typical scope:Editorial responsibility scope: confirming resources and approvers must follow the specific job tasks and authorization; stage names do not represent a uniform job level or automatic approval authority.

Readiness evidence:Retain reviewable deliverables.

Credential boundary:Check the target position's education, experience, training, and actual duties; check certificates, hiring, approval, and execution authority separately.

Next moves:Fill in tools, qualifications, and responsibility evidence.

Independent delivery

01

Maintain baselines

Typical scope:Editorial responsibility scope: maintaining baselines must follow the specific job tasks and authorization; stage names do not represent a uniform job level or automatic approval authority.

Readiness evidence:Retain reviewable deliverables.

Credential boundary:Check the target position's education, experience, training, and actual duties; check certificates, hiring, approval, and execution authority separately.

Next moves:Fill in tools, qualifications, and responsibility evidence.

02

Track milestones

Typical scope:Editorial responsibility scope: tracking milestones must follow the specific job tasks and authorization; stage names do not represent a uniform job level or automatic approval authority.

Readiness evidence:Retain reviewable deliverables.

Credential boundary:Check the target position's education, experience, training, and actual duties; check certificates, hiring, approval, and execution authority separately.

Next moves:Fill in tools, qualifications, and responsibility evidence.

03

Assess change impact

Typical scope:Editorial responsibility scope: assessing change impact must follow the specific job tasks and authorization; stage names do not represent a uniform job level or automatic approval authority.

Readiness evidence:Retain reviewable deliverables.

Credential boundary:Check the target position's education, experience, training, and actual duties; check certificates, hiring, approval, and execution authority separately.

Next moves:Fill in tools, qualifications, and responsibility evidence.

04

Organize acceptance handoff

Typical scope:Editorial responsibility scope: organizing acceptance handoff must follow the specific job tasks and authorization; stage names do not represent a uniform job level or automatic approval authority.

Readiness evidence:Retain reviewable deliverables.

Credential boundary:Check the target position's education, experience, training, and actual duties; check certificates, hiring, approval, and execution authority separately.

Next moves:Fill in tools, qualifications, and responsibility evidence.

Expanded responsibility

01

Coordinate multi-team dependencies

Typical scope:Editorial responsibility scope: coordinating multi-team dependencies must follow the specific job tasks and authorization; stage names do not represent a uniform job level or automatic approval authority.

Readiness evidence:Retain reviewable deliverables.

Credential boundary:Check the target position's education, experience, training, and actual duties; check certificates, hiring, approval, and execution authority separately.

Next moves:Fill in tools, qualifications, and responsibility evidence.

02

Manage resource conflicts

Typical scope:Editorial responsibility scope: managing resource conflicts must follow the specific job tasks and authorization; stage names do not represent a uniform job level or automatic approval authority.

Readiness evidence:Retain reviewable deliverables.

Credential boundary:Check the target position's education, experience, training, and actual duties; check certificates, hiring, approval, and execution authority separately.

Next moves:Fill in tools, qualifications, and responsibility evidence.

03

Communicate risk trade-offs

Typical scope:Editorial responsibility scope: communicating risk trade-offs must follow the specific job tasks and authorization; stage names do not represent a uniform job level or automatic approval authority.

Readiness evidence:Retain reviewable deliverables.

Credential boundary:Check the target position's education, experience, training, and actual duties; check certificates, hiring, approval, and execution authority separately.

Next moves:Fill in tools, qualifications, and responsibility evidence.

04

Review governance and results

Typical scope:Editorial responsibility scope: reviewing governance and results must follow the specific job tasks and authorization; stage names do not represent a uniform job level or automatic approval authority.

Readiness evidence:Retain reviewable deliverables.

Credential boundary:Check the target position's education, experience, training, and actual duties; check certificates, hiring, approval, and execution authority separately.

Next moves:Fill in tools, qualifications, and responsibility evidence.

Capability ladder: what demonstrates readiness?

  1. 01

    Input check

    Confirm the source, permissions, and version.

  2. 02

    Process control

    Follow stop and escalation conditions.

  3. 03

    Result retrospective

    Produce reviewable records.

  4. 04

    Responsibility expansion

    Expand within the authorized scope.

Market signals

Market signals and related directions for information technology project managers: this page states only observations within the coverage of the sources.

O*NET officially presents the Computer Occupations, All Other (SOC15-1299) parent group: 2025 employment 471,200 rising to a projected 495,300 in 2035, growth 5%, average annual openings 27,000 from 2025—2035 (including growth and replacement); not a precise IT project manager projection. China's precise demand was not obtained; editorial transition comparisons do not guarantee qualification mutual recognition or hiring.

Three sources, three different measures

US national

2025—2035

US national · Computer Occupations, All Other parent group

471,200 to 495,300 people

Parent-group employment size

Not a precise IT project manager projection; openings include growth and replacement, not actual hiring or net additions.

Does not establish:Cannot serve as an individual employment guarantee.

US national

2025—2035

US national · Computer Occupations, All Other parent group

5%

Parent-group growth

Not a precise IT project manager projection; openings include growth and replacement, not actual hiring or net additions.

Does not establish:Cannot serve as an individual employment guarantee.

US national

2025—2035

US national · Computer Occupations, All Other parent group

27,000/year

Parent-group average annual openings

Not a precise IT project manager projection; openings include growth and replacement, not actual hiring or net additions.

Does not establish:Cannot serve as an individual employment guarantee.

Where can your current capabilities transfer?

These are capability relationships, not automatic promotions or credential waivers.

General and Operations Managers

Editorial comparison; target duties and domain evidence still need to be filled in

Transfers:Transferable abilities | The shared foundations of adjacent directions include: scope and requirements management, schedule and cost control, stakeholder coordination and communication, risk and change management, and record and status tracking; but each path must fill in the tools, qualifications, and responsibility evidence corresponding to its new outputs and responsibilities.

Build next:Ability gaps | Moving toward adjacent directions such as general and operations managers, administrative services managers, computer and information systems managers, architectural and engineering managers, or logistics engineers requires filling in the new position's domain knowledge, governance scope, compliance requirements, or engineering methods; adjacency is only for direction comparison and does not represent automatic transfer or qualification mutual recognition.

View career profile

Administrative Services Managers

Editorial comparison; target duties and domain evidence still need to be filled in

Transfers:Process and team management, budgeting and coordination

Build next:Administrative service and procurement process evidence

View career profile

Computer and Information Systems Managers

Editorial comparison; target duties and domain evidence still need to be filled in

Transfers:IT systems and team collaboration

Build next:Organization-level resources, project portfolio, and governance

View career profile

Architectural and Engineering Managers

Editorial comparison; target duties and domain evidence still need to be filled in

Transfers:Project planning and multi-party coordination

Build next:Engineering design, construction, and acceptance compliance

View career profile

Logistics Engineers

Editorial comparison; target duties and domain evidence still need to be filled in

Transfers:Process and system coordination

Build next:Logistics system modeling and engineering methods

View career profile

Project management specialist

Editorial comparison; target duties and domain evidence still need to be filled in

Transfers:Scope, schedule, budget, and multi-party coordination (editorial comparison)

Build next:Check the target industry's project delivery, procurement, resource, and acceptance rules; IT project experience cannot automatically cover all projects.

View career profile

Common questions and boundaries

What are the daily work and hours like?

The work of O*NET 15-1299.09 is mainly coordination, communication, planning, and recording: email 95% daily, telephone conversations 80% daily, work with others in a group or team 75% extremely important, face-to-face discussions 60% daily, time pressure 52% daily, work week over 40 hours 60%; sitting 50% continually or almost continually, competition 57% highly. The pace is driven by project milestones and cross-team dependencies, and you need to bear both deadline pressure and multi-party conflict at the same time.

How is this occupation distinguished from adjacent occupations?

This occupation targets the scope, schedule, cost, and quality of a single IT project, and delivers project plans, status, and acceptance records. General and operations managers target overall organizational operations, administrative services managers target office and administrative services, computer and information systems managers focus on organization-level IT resources and project portfolio governance, architectural and engineering managers focus on engineering project design and construction coordination, and logistics engineers focus on logistics system and process design. Judgment should be based on core outputs, authorization scope, and responsibility boundaries, not job title interchange alone.

What signals suggest I might fit?

The fit signal is whether you can complete goal and scope definition, sequencing and coordination, and progress and quality checks following procedure, handle data and records accurately, and escalate when uncertain — not a personality label. Interest and personality tools can only help design experiments and cannot judge hiring eligibility or performance.

Source: O*NET OnLine|United States|2025 BLS OEWS wage data displayed by O*NET OnLine|official occupation summary · Source: FermatMind editorial review|Global|current task analysis; reviewed 2026-08-31|editorial synthesis
How will AI affect this occupation?

Generative AI can assist with organizing meeting and requirement records, generating plan and status drafts, checklist review, schedule variance comparison, and risk and issue summarization; but goal and scope confirmation, change and acceptance approval, budget and schedule commitments, and accountability for results remain with people. Task exposure does not equal job substitution, nor does it mean it is already widely adopted; this page gives no substitution probability or timeline.

Source: FermatMind editorial review|Global|current task analysis; reviewed 2026-08-31|editorial synthesis · Source: O*NET OnLine|United States|current page; accessed 2026-09-02|official technology profile
Which judgments must be borne by people?

Tool output cannot replace authorization scope, change, and acceptance judgments. Humans must go back to the original requirements, baselines, and approval records and review key judgments, and bear responsibility for goals and scope, schedule and budget commitments, and change and acceptance conclusions.

Source: FermatMind editorial review|Global|current task analysis; reviewed 2026-08-31|editorial synthesis · Source: FermatMind editorial review|Employers and employing jurisdictions|current employer context; reviewed 2026-08-31|editorial synthesis
What is the mainland China wage evidence?

Insufficient evidence: China's statistical tables have no single-occupation wage for information technology project managers precisely corresponding to O*NET 15-1299.09, and industry averages cannot masquerade as the median; this page shows the gap rather than substituting industry averages, job postings, or US data.

What is the US wage evidence?

Per the BLS May 2025 data presented by O*NET: median wage 116,580 USD (median hourly wage 56.05 USD), with the 10/25/75/90 percentiles at 55,940 / 79,370 / 157,500 / 188,470 USD. The values are officially presented under the broader parent group Computer Occupations, All Other and are not precise values for this occupation; OEWS excludes benefits and bonuses, and percentiles do not equal starting pay or individual take-home income.

What is the entry and training path?

O*NET preparation information shows this occupation is Job Zone Four: most require a four-year bachelor's degree (38%), while 24% require an associate's or other two-year degree and 19% require a post-baccalaureate certificate, together with a considerable amount of work-related skill and experience. Entering this occupation should combine foundation learning, on-the-job training, and verifiable project work; education, certificates, licenses, hiring, agency authorization, and signing authority must be checked separately.

What are the main risks and control boundaries?

The main risks fall into four categories: scope and baseline, delivery quality, stakeholders and communication, and information and compliance. The control focus is to write clearly the scope and baselines, change review and approval, quality standards and acceptance basis, and the minimum necessary and authorized scope of information handling, and to stop and report immediately when scope, baselines, or authorization conditions are insufficient.

Source: FermatMind editorial review|Employers and employing jurisdictions|current employer context; reviewed 2026-08-31|editorial synthesis · Source: FermatMind editorial review|Employers and employing jurisdictions|current employer context; reviewed 2026-08-31|editorial synthesis
How should market signals be understood?

BLS Table 1.2: U.S. parent occupation Computer Occupations, All Other 15-1299 had about 471,200 jobs in 2025 and is projected to have about 495,300 in 2035 (+5.1%), with about 27,000 openings per year. Counts are rounded independently; projected openings include replacements and do not measure current hiring. Openings include growth and replacement demand, do not equal net new jobs, and cannot be directly converted into hiring scale or individual hiring probability.

Is this occupation worth further testing?

This page gives no employment or hiring conclusion, but provides a verifiable testing path: test scope definition, stage sequencing, status and risk records, and change and retrospective with a fully fictional IT project scenario; use observable deliverables to decide whether to continue, not an interest questionnaire or promotion alone.

Source: FermatMind editorial review|Employers and employing jurisdictions|current employer context; reviewed 2026-08-31|editorial synthesis · Source: O*NET OnLine|United States|current page; accessed 2026-09-02|official occupation details
What is the page usage boundary?

Evidence for China, the US, the global level, and specific jurisdictions is stated separately; wage, employment, qualification, safety, and AI conclusions must not be stitched across scopes. The information technology project manager page provides occupational decision and safety trial information and does not replace local legal, medical, financial, safety, practice, or other professional advice. Any "insufficient evidence" only means that no safe data was established after a bounded search, and proxies or model memory must not be used to fabricate figures. This page covers only the precise occupation O*NET/SOC 15-1299.09 "Information Technology Project Managers".

Sources

FermatMind research workflow

Verified 2026-10-11; wages 2025, projection 2025—2035

https://www.onetonline.org/link/details/15-1299.09; https://www.onetonline.org/link/localwages/15-1299.09; https://www.onetonline.org/link/localtrends/15-1299.09; NBS industry background

  • Information Technology Project Managers AI task boundaryFermatMind editorial review|Global|current task analysis; reviewed 2026-08-31|editorial synthesis
    • Technical assistance and human control boundaries are formed only from proven tasks.
    • Not adoption rate, performance, or substitution probability.

    Limitations:Not adoption rate, performance, or substitution probability.

  • Information Technology Project Managers employment model boundaryFermatMind editorial review|Employers and employing jurisdictions|current employer context; reviewed 2026-08-31|editorial synthesis
    • Only used to explain that the employment system, job opportunities, and authorization cannot be inferred directly from an occupation directory.
    • Not hiring scale or a hiring guarantee.

    Limitations:Not hiring scale or a hiring guarantee.

  • Information Technology Project Managers market and path boundaryFermatMind editorial review|Employers and employing jurisdictions|current employer context; reviewed 2026-08-31|editorial synthesis
    • Only used to distinguish occupational preparation, employer employment, and market signals.
    • Does not replace employer procedures, local law, or case-by-case judgment.

    Limitations:Does not replace employer procedures, local law, or case-by-case judgment.

  • 2025 average annual wages of urban unit employeesNational Bureau of Statistics|China|2025 annual wages; published 2026-05-15; retrieved 2026-08-31|official wage statistics
    View original source:2025 average annual wages of urban unit employees
    • China industry wage statistics and the pre-tax definition.
    • Industry averages cannot replace precise wages for this occupation.

    Limitations:Industry averages cannot replace precise wages for this occupation.

  • O*NET DatabaseO*NET Resource Center|United States|O*NET current occupation profile; retrieved 2026-08-31|official occupation database
    View original source:O*NET Database
    • Occupation code, database version, and education preparation entry.
    • Does not equal employer hiring or statutory licensing.

    Limitations:Does not equal employer hiring or statutory licensing.

  • Information Technology Project Managers 15-1299.09O*NET OnLine|United States|O*NET current occupation profile; retrieved 2026-08-31|official occupation profile
    View original source:Information Technology Project Managers 15-1299.09
    • Occupational identity, duties, objects, tools, and risks.
    • US occupational scope; does not set China qualifications.

    Limitations:US occupational scope; does not set China qualifications.

  • Information Technology Project Managers SummaryO*NET OnLine|United States|O*NET current occupation profile; retrieved 2026-08-31|official occupation summary
    View original source:Information Technology Project Managers Summary
    • Occupation summary, tasks, knowledge, and work activities.
    • The summary must be interpreted together with the detailed occupational scope.

    Limitations:The summary must be interpreted together with the detailed occupational scope.

  • O*NET-SOC TaxonomyO*NET Resource Center|United States|O*NET current occupation profile; retrieved 2026-08-31|official occupation taxonomy
    View original source:O*NET-SOC Taxonomy
    • Occupational classification and adjacent occupation boundaries.
    • Classification adjacency does not mean authority is interchangeable.

    Limitations:Classification adjacency does not mean authority is interchangeable.

  • National employment trends for 15-1299.09O*NET OnLine / BLS|United States|2025–2035|official employment projection
    View original source:National employment trends for 15-1299.09
    • US precise occupation employment projection page and coverage boundary.
    • Without figures, it only supports unavailability or a narrow-scope boundary.

    Limitations:Without figures, it only supports unavailability or a narrow-scope boundary.

  • National wages for 15-1299.09O*NET OnLine / BLS|United States|BLS 2025 wage data via O*NET; retrieved 2026-08-31|official wage statistics
    View original source:National wages for 15-1299.09
    • US precise occupation wage page and coverage boundary.
    • Without figures, it only supports an unavailability boundary.

    Limitations:Without figures, it only supports an unavailability boundary.

  • 15-1299.09 - Information Technology Project ManagersO*NET OnLine|United States|current page; accessed 2026-09-02|official custom occupation profile
    View original source:15-1299.09 - Information Technology Project Managers
    • Used to check the occupational scope, tasks, skills, and work context of O*NET 15-1299.09.
    • Applies only to that O*NET occupation and the US market; does not establish a China mapping, China wages, or legal authorization.

    Limitations:Applies only to that O*NET occupation and the US market; does not establish a China mapping, China wages, or legal authorization.

  • 15-1299.09 - Information Technology Project ManagersO*NET OnLine|United States|current page; accessed 2026-09-02|official occupation details
    View original source:15-1299.09 - Information Technology Project Managers
    • Used to check occupational identity, duties, objects, tools, and risk inputs.
    • Applies only to that O*NET occupation and the US market; does not establish a China mapping, China wages, or legal authorization.

    Limitations:Applies only to that O*NET occupation and the US market; does not establish a China mapping, China wages, or legal authorization.

  • Hot Technologies: 15-1299.09 - Information Technology Project ManagersO*NET OnLine|United States|current page; accessed 2026-09-02|official technology profile
    View original source:Hot Technologies: 15-1299.09 - Information Technology Project Managers
    • Used to check the entry for popular technologies and task changes related to this occupation.
    • Technology mentions do not equal ability, adoption, or degree of automation.

    Limitations:Applies only to that O*NET occupation and the US market; does not establish a China mapping, China wages, or legal authorization.

  • Industries: 15-1299.09 - Information Technology Project ManagersO*NET OnLine|United States|current page; accessed 2026-09-02|official industry distribution
    View original source:Industries: 15-1299.09 - Information Technology Project Managers
    • Used to check the industry distribution and work scenarios of this occupation (officially presented under a broader parent group).
    • Industry distribution does not establish a China mapping.

    Limitations:Applies only to that O*NET occupation and the US market; does not establish a China mapping, China wages, or legal authorization.

  • National Certifications: 15-1299.09 - Information Technology Project ManagersO*NET OnLine|United States|current page; accessed 2026-09-02|official certification discovery
    View original source:National Certifications: 15-1299.09 - Information Technology Project Managers
    • Used to check the national certificate search entry related to this occupation.
    • Certificates or training do not equal licensing, signing, or employment authority.

    Limitations:Applies only to that O*NET occupation and the US market; does not establish a China mapping, China wages, or legal authorization.

  • National Wages: 15-1299.09 - Information Technology Project ManagersO*NET / U.S. Bureau of Labor Statistics|United States|2025 BLS OEWS wage data displayed by O*NET OnLine|O*NET display of BLS OEWS wage data
    View original source:National Wages: 15-1299.09 - Information Technology Project Managers
    • Used to check the US wage definition on this page: O*NET 15-1299.09 does not publish wages separately, and the official presentation uses a broader parent group (May 2025: median 116,580 USD, 10/25/75/90 percentiles 55,940 / 79,370 / 157,500 / 188,470 USD).
    • Retain the period, employed population, geography, and unit of measure shown; failure to access BLS directly does not affect the O*NET page already opened.

    Limitations:BLS OEWS wage data presented by O*NET OnLine; the period, employed population, geography, and unit of measure are retained, and this page uses the broader parent-group definition.

  • 15-1299.09 - Information Technology Project ManagersO*NET OnLine|United States|2025 BLS OEWS wage data displayed by O*NET OnLine|official occupation summary
    View original source:15-1299.09 - Information Technology Project Managers
    • Used to check the entry for occupational identity, entry, and employment outlook (official employment and wages are presented under a broader parent group).
    • Applies only to that O*NET occupation and the US market; does not establish a China mapping, China wages, or legal authorization.

    Limitations:Applies only to that O*NET occupation and the US market; does not establish a China mapping, China wages, or legal authorization.

  • Three representative core tasks of this occupationFermatMind / 费马测试|2026-10-18|Editorial model estimation method
    View original source:Three representative core tasks of this occupation
    • Model impact index for three equally weighted representative core tasks; not a measured share of working time or a job-loss probability. floor((50+75+50)/3+0.5)=58; fermatmind-ai-impact-v1; 2026-10-18.
    • Anchors: 0 negligible; 25 preparation or record assistance; 50 substantial assistance; 75 most information output can be formed by AI with review; 100 almost all of the selected task can be done by AI and independently verified.
    • Identify stakeholders requirements and scope — 50/100; weight=1/3; information-technology-project-managers.profile.responsibilities-block.4[0]
    • Plan project milestones and resources — 75/100; weight=1/3; information-technology-project-managers.profile.responsibilities-block.4[0]
    • Monitor quality and coordinate change reviews — 50/100; weight=1/3; information-technology-project-managers.profile.responsibilities-block.4[0]

    Limitations:Editorial ratings use the existing occupational responsibilities and AI task analysis on this page. They are not adoption rates, measured effects, job-disappearance or personal-unemployment probabilities, or official scores from Stanford or another external institution. No measured time weights or future robot deployment are assumed.

  • BLS Table 1.2U.S. Bureau of Labor Statistics|United States|2025–2035
    View original source:BLS Table 1.2
    • BLS Table 1.2: U.S. parent occupation Computer Occupations, All Other 15-1299 had about 471,200 jobs in 2025 and is projected to have about 495,300 in 2035 (+5.1%), with about 27,000 openings per year. Counts are rounded independently; projected openings include replacements and do not measure current hiring.

O*NET 15-1299.09 describes IT project management duties. U.S. pay and projections use the broader 15-1299 group. Mainland China hiring notices are specific examples.

IT Project Manager: Scope, Delivery and Acceptance | FermatMind