Pile driver operators
Pile driver operators run pile driving rigs according to the construction plan and site signals, driving piles into the foundation to support buildings, bridges, or wharves. The core is pre-shift inspection, pile position and hammer position control, observing abnormalities, and stopping work on instruction; paper exercises must not be treated as authorization to operate real equipment.
Quick decision
Direct judgment: only if you are willing to stay alert outdoors for long periods, operate the rig strictly according to the specified signals and construction plan, and stop the action when abnormalities appear, is it worth continuing to explore.
Observable signals: able to describe pre-shift inspection, pile position verification, personnel exclusion, and stop-and-escalate steps according to a checklist; liking machinery does not substitute for safety discipline.
Safe try-out: using only a fictional construction brief, produce paper inspection and stop records; do not touch real pile rigs, hammers, or suspended loads.
Review: can a peer restate the reason for stopping, the observed values, who was notified, and the actions awaiting approval from the record alone; do not operate equipment without on-site training and authorization.
Path: the United States 47-2072 typical high school diploma or equivalent and medium-term on-the-job training do not grant rig operating rights; for Chinese building and municipal engineering pile rig work, verify the 2026 catalogue, the assessment added on 2027-06-01, and the current local qualification, training, and project authorization.
Career profile
Pile driver operators complete inspection, alignment, lifting, pile driving, and abnormal stopping according to the construction plan, crew signals, and equipment requirements; real equipment may only be operated by authorized personnel under on-site rules.
O*NET 47-2072 lists five core tasks: control lifting and the pile hammer, place piles in the leads, drive piles to the specified depth, inspect equipment before the shift, and clean, lubricate, and replenish. The older projection inside the O*NET web page must be distinguished from the standalone BLS 2025—2035 row.
- Pre-shift inspection|Verify the equipment, ground, obstacles, and exclusion zone|Do not start if the conditions are not met.
- Pile material lifting|Move the pile material into the leads on the designated signaler's command|Confirm that personnel have left the danger zone.
- Alignment and driving|Control the pile hammer and driving progress according to the construction plan|Continuously observe the pile position and equipment condition.
- Abnormal stop|On conflicting signals, settlement, abnormal equipment noise, or personnel entering|Stop the action and escalate.
- Equipment maintenance|Clean, lubricate, and replenish under the specified isolation and shutdown conditions|Hand fault repair to authorized personnel.
- Shift records|Record the pile number, inspection results, abnormalities, and open items|Accepted by the project responsible person.
Workplace|Outdoor foundation engineering sites, which may be on land or on water platforms. Equipment and materials|Pile rigs, leads, pile hammers, wire ropes, power and hydraulic systems, pile materials. Collaboration partners|Site supervisor, designated signaler, lifting and survey teams, maintenance personnel. Decision boundary|Operate only according to the plan and authorization; stop immediately on conflicting signals or abnormal ground or equipment conditions. Work environment|In the O*NET survey, 98% reported daily exposure to all-weather outdoor conditions, 98% wore common protective equipment daily, and 79% were exposed to uncomfortable noise daily. Crew signals|A designated person directs with clear verbal commands or hand signals, and the action stops when they conflict. Time rhythm|Affected by construction, weather, and equipment maintenance scheduling, and the shift handover must be clear. Physical load|Maintain on-site observation for long periods and wear protective equipment as required. Quality records|Record the pile number, depth, abnormalities, and handling handover.
Start conditions: the equipment, ground, pile position, and personnel exclusion must all be verified, and work does not start if any item is missing.
The standalone BLS 47-2072 row gives a 2025 wage median of 73,300 dollars; employment is about 2,300 in 2025 and about 2,200 in 2035.
Confirm the equipment inspection → verify the ground and underground utilities → verify the pile position and plan → clear the exclusion zone → brief on the designated signals → stop first on unverified conditions
The construction industry and related broad production and manufacturing positions are chosen as Chinese background according to pile driving and on-site equipment operation duties. The 2025 national urban unit construction industry pre-tax annual averages for all positions: non-private 92,036 and private 66,275 yuan per year; above-scale enterprise cross-industry production, manufacturing, and related personnel 80,739 yuan per year serves as broad position background. None is the pile driver operator median, and they do not include the complete individual construction crew market.
Driving conditions: accept only the designated signals and continuously observe the equipment, pile material, and danger zone.
The BLS detailed projections table gives 47-2072 an employment change of -5.7% and about 200 average annual openings; the current O*NET page also uses 2025—2035, and the exact change rate follows the standalone BLS row.
Receive a valid signal → lift and align the pile material → control pile driving → observe the pile position and equipment → stop and escalate on abnormalities → record the pile number and hand over the shift
The 2026 special operations catalogue lists building and municipal engineering pile rig operators, covering pile rig installation, commissioning, operation, and dismantling; the catalogue takes effect from 2026-06-01, and the assessment for this operation item starts on 2027-06-01. Current training, certificates, and project authorization must still be verified with the local authority and employer, and the transition period does not permit operating a rig without a certificate.
Outputs: control pile driving according to the design and keep inspection, abnormality, and shift records; acceptance is the responsibility of authorized personnel.
Operators control the pile rig and the driving process; riggers and the designated signaler are responsible for their own lifting collaboration; survey and engineering technical personnel verify the pile position, plan, and acceptance, and specialized maintenance personnel handle fault repair; operating experience does not automatically grant those authorities. Complete workflow: before the shift, first confirm the construction plan, pile position, pile type, ground bearing capacity, underground utilities, weather, signal personnel, and stop conditions; the rig only goes into action once the control chain is closed.
It is not about pursuing the fastest hammering speed.
Complete foundation pile driving under control according to the approved plan.
Equipment instructions, the construction plan, and statutory qualifications constrain it together.
Pile materials, the pile rig, the ground, the pile position, and the on-site briefing.
Definition: United States O*NET 47-2072 pile driver operators carry out foundation engineering pile rig work, including pile material lifting, alignment, driving, and equipment inspection.
Performed according to on-site authorization and the special plan.
Inspection, signal confirmation, lifting and alignment, pile driving, abnormal stopping.
The project responsible person is responsible for engineering acceptance.
Pile position, driving records, and reviewable abnormal shift handovers.
Signals, survey, maintenance, and engineering acceptance each have their own duties.
Operators are responsible for operating and recording within their authorized scope.
Paper exercises or adjacent experience do not grant operating rights.
The on-site plan, qualification, rig model, and employer authorization must be verified together.
Chinese qualifications and construction requirements are verified according to the project location.
The United States 47-2072 occupation material is used to explain the tasks and wages.
The United States 47-2072 typical entry-level education is a high school diploma or equivalent, with no related work experience required and medium-term on-the-job training; the statistical description does not grant rig operating rights. Chinese qualifications and the assessment added in 2027 are verified separately according to the project location.
Investment targets: operators control heavy pile rigs and drive concrete, steel, or timber piles into the foundation at the construction position to form foundation support for buildings, bridges, wharves, or retaining structures. The first goal of the work is to complete driving under control, not to pursue faster hammering. This page covers the pile material lifting and alignment, pile hammer control, and driving tasks of United States 47-2072 pile driver operators. Excavation, pushing, and loading machinery, maintenance, lifting and rigging, and on-site survey duties are verified separately; Chinese building and municipal engineering pile rig work qualifications and project authorization require separate verification.
The United States typical education is a high school diploma or equivalent plus medium-term on-the-job training; local permits and employer requirements require separate verification.
Complete workflow: before the shift, first confirm the construction plan, pile position, pile type, ground bearing capacity, underground utilities, weather, signal personnel, and stop conditions; the rig only goes into action once the control chain is closed. Inspectable outputs: control the driving process and observe and record depth, verticality, ground, and equipment abnormalities.
Verify the specific pile rig, the operable range, and the employer authorization; familiarity with one type of equipment does not automatically grant the right to operate other models.
Environment and pace: work with the survey team and signaler to complete pile material hoisting, insertion, positioning, and hammer alignment. BLS 47-2072 projects United States employment of about 2,300 in 2025 and about 2,200 in 2035, a change of -5.7%, with about 200 average annual openings.
Verify the approved plan, pile position, underground utilities, and ground conditions; you must not independently approve the start of work based on paper materials.
Collaborate with the designated signaler, ground crew, surveyors, equipment maintenance, and the project safety officer; hand abnormalities to authorized personnel, and operators cannot substitute for foundation design, maintenance acceptance, or work resumption approval. Tools and materials include pile rigs, leads, pile hammers, wire ropes, hydraulic systems, concrete or steel and timber pile materials, as well as controlled construction drawings, equipment instructions, inspection checklists, and shift records. Use them according to the specific model and on-site plan.
Confirm the valid commands, exclusion zone, and pause and escalation chain; hand conflicts or unverified conditions to the responsible person for review.
The 2026 special operations catalogue lists building and municipal engineering pile rig operators, covering pile rig installation, commissioning, operation, and dismantling; the catalogue takes effect from 2026-06-01, and the assessment for this operation item starts on 2027-06-01. Current training, certificates, and project authorization must still be verified with the local authority and employer, and the transition period does not permit operating a rig without a certificate. Quality standard: the five core tasks listed by O*NET center on controlling hoisting, moving the pile into the leads, aligning the pile hammer, driving the pile to the required depth, and pre-shift inspection with basic lubrication and replenishment. High-precision control, depth perception, and multi-limb coordination map directly to these actions.
The 2026 catalogue is already in effect, and assessment for the building pile rig operation item starts on 2027-06-01; current qualifications are verified with the local authority.
Investment targets: operators control heavy pile rigs and drive concrete, steel, or timber piles into the foundation at the construction position to form foundation support for buildings, bridges, wharves, or retaining structures. The first goal of the work is to complete driving under control, not to pursue faster hammering. This page covers the pile material lifting and alignment, pile hammer control, and driving tasks of United States 47-2072 pile driver operators. Excavation, pushing, and loading machinery, maintenance, lifting and rigging, and on-site survey duties are verified separately; Chinese building and municipal engineering pile rig work qualifications and project authorization require separate verification.
Verify shifts, weather stoppage arrangements, noise protection, shutdown isolation, and handover duties; do not substitute for specialized maintenance.
Career direction comparison
- O*NET pile driver operators 47-2072
- BLS construction equipment operator outlook
- O*NET other construction equipment operators 47-2073
- O*NET construction laborers 47-2061
- O*NET mobile heavy equipment mechanics 49-3042
First verify which equipment this position operates, who gives the signals, who inspects and repairs, and who accepts the pile foundation, then compare training and qualifications.
Official occupational tasks such as O*NET 47-2072, 47-2073, 47-2061, and 49-3042 are used to distinguish; position authorization and Chinese qualifications are verified by project.
Pile driver operators are responsible for foundation pile lifting, alignment, and driving; other construction equipment operation, ground crew work, lifting, and maintenance involve different equipment and responsibilities. Adjacent experience cannot directly replace qualification.
The object is foundation pile materials and the pile hammer; 47-2072 is the standalone occupation.
Suits people with strong safety discipline who can sustain on-site observation.
Operate the pile rig to lift, align, and drive piles and record abnormalities.
Pile driver operators
The equipment, materials, and final deliverables differ, and operators cannot automatically switch to operating another equipment model.
Suits broad earthmoving and equipment operation.
Operate excavation, pushing, loading, and grading construction equipment.
Other construction equipment operators
Collaboration is not equal to being authorized to operate the pile rig.
Suits people who want to learn the process from on-site foundation work.
Site preparation, material handling, and auxiliary construction.
Construction laborers
Maintenance qualification and pile rig operating duties differ.
Suits mechanical diagnosis and repair.
Diagnose and repair heavy equipment mechanical and hydraulic faults.
Mobile heavy equipment mechanics
Survey results are confirmed by the authorized responsible person and do not substitute for pile rig operation.
Suits survey and record keeping.
Verify the pile position, observations, and records.
Pile foundation survey collaboration
Signal and lifting qualifications are verified by equipment and jurisdiction and do not automatically grant pile rig operating rights.
Suits on-site commands and lifting coordination.
Direct or carry out lifting-related work according to the plan.
Lifting and signal collaboration
To move to other equipment, maintenance, or construction coordination, first verify the new equipment, qualification, training, and responsibility, and do not assume pile rig experience transfers automatically.
AI impact
- O*NET pile driver operators 47-2072
- ILO generative AI task exposure study
- BLS construction equipment operator outlook
- BLS 47-2072 standalone employment projection
- NIST generative AI risk profile
- O*NET pile driver operators 47-2072
- NIST generative AI risk profile
- O*NET pile driver operators 47-2072
- ILO generative AI task exposure study
- NIST generative AI risk profile
- BLS 47-2072 standalone employment projection
- O*NET pile driver operators 47-2072
- O*NET pile driver operators 47-2072
- O*NET pile driver operators 47-2072
- NIST generative AI risk profile
- BLS 47-2072 standalone employment projection
- O*NET pile driver operators 47-2072
- NIST generative AI risk profile
- NIST generative AI risk profile
Beginners
First learn equipment and site safety, then practice recording tools with fictional materials.
Trainees
The mentor confirms that tool output matches the original inspection evidence.
Site teams
Establish commands, stop procedures, data authorization, and shift handover review processes.
Management and maintenance personnel
Limit tool access permissions so erroneous output is traceable and corrected promptly.
Generative AI can help organize inspection records, shift summaries, and public material drafts; sensors can assist with abnormality prompts, but neither can verify on-site ground conditions, pile materials, personnel exclusion, or equipment condition. Operation and stopping are the responsibility of authorized crews under on-site rules. The ILO exposure study does not provide a 47-2072 replacement rate.
O*NET pile driver operators
47-2072 real tasks
ILO generative AI exposure study
Cross-occupation task study
BLS construction equipment operator outlook
47-2072 wages and training
BLS standalone occupational projection
47-2072 employment
NIST generative AI risk profile
O*NET work environment
47-2072 outdoor and noise
NIST generative AI risk profile
Human oversight and reliability
Text record assistance, sensor monitoring, and physical pile rig control are different technologies; do not treat draft generation as equipment automation.
Can organize recorded items, omissions, and shift handover drafts
Operators verify the original observations, equipment condition, and recipients.
Sensors can indicate position or equipment trends and are not generative text automation
The crew confirms the pile position, ground, and stop conditions according to the plan.
Algorithms cannot issue valid on-site commands or operate the pile rig on their own
The designated signaler and authorized operator retain control.
O*NET supports the real 47-2072 tasks; the ILO study discusses occupational task exposure, NIST provides a generative AI risk governance framework; the BLS employment projection does not separate out the AI effect.
Does not measure AI adoption or replacement
O*NET 47-2072
United States pile driving tasks
Lists operation, inspection, and cleaning and lubrication
Does not provide a standalone 47-2072 replacement rate
ILO generative AI occupational exposure study
Cross-occupation task exposure
Distinguishes task exposure from position replacement
Does not certify pile rig control or site safety
NIST generative AI risk profile
Organization-level tool risk governance
Raises reliability, information, and human oversight risks
Does not separate out the causal AI contribution
BLS 47-2072 standalone projection
United States occupational employment
About 2,300 in 2025, about 2,200 in 2035, change of -5.7%
Not an on-site tool evaluation or adoption rate
Editorial summary of task assistance
Inspection and shift handover text work
Low-risk records may be trialed with assistance
It means text tasks may be assisted, not site adoption or occupational disappearance.
Site adoption requires verifying the equipment interface, data quality, designated responsible persons, missed and false alarms, failure fallback procedures, and project approval; a text demonstration cannot prove that a system has been adopted or can control the pile rig.
The BLS 47-2072 projection is formed by multiple factors and does not separate out the net AI effect on this occupation.
This time no reliable 47-2072 replacement rate was verified; text assistance differs from on-site operation, and the BLS projection does not attribute to AI either.
ILO task exposure study (not pile rig adoption or net employment)
This page does not provide a basis for automatic operation. Real equipment must be controlled according to the on-site plan and authorization.
O*NET tasks
Use only public or fictional materials to practice low-risk drafts such as inspection checklists and shift summaries.
O*NET inspection and maintenance tasks, editorial trial advice
No. The 47-2072 projection changes by -5.7%, and BLS does not attribute the change to AI.
Not equal. Ground, personnel, and equipment conditions must be verified on site.
O*NET and editorial boundaries
First verify the organizational authorization, confidentiality scope, and data governance; do not upload unauthorized drawings or personnel information.
NIST risk profile
First learn equipment, safety, signals, and stop procedures, then learn recording tools and output review.
O*NET pile rig tasks and work context
First limit to public or authorized materials and record where tool output came from, then have on-site personnel verify the original records, equipment, and safety conditions.
Enter only public or organizationally authorized materials.
Separate text assistants from sensor prompts and equipment control.
Review the original records, pile position, personnel, and equipment condition.
Keep tool drafts, manual edits, and shift records.
When dangerous or uncertain, stop according to on-site procedures and hand over to authorized personnel.
May miss equipment faults or ground abnormalities
Compare item by item against the original observations and do not sign on model text.
Drawings, coordinates, and personnel information may leak
Use only approved systems and data.
May bypass the on-site command chain
Authorized personnel verify and decide whether to stop.
May mislead maintenance or operation
Verify the manufacturer material and the applicable version.
The successor may be unable to verify the reason for stopping
Record the time, pile number, observations, and recipient.
Equipment and ground conditions are verified on site.
Pre-shift inspection records
Record organization
Can flag missing form items
Verify the original time, pile number, and recipient.
Shift summary
Text organization
Can generate drafts of unfinished items
Authorized personnel decide on stopping and maintenance.
Abnormal trend prompts
Sensor monitoring
Sensor systems may indicate changes in vibration, temperature, and the like; the specific equipment and validation records must be verified, this page does not evaluate products, and this function is not classified here as generative AI.
Verify the applicable version and on-site plan.
Construction material retrieval
Information access
Can search equipment instructions or public standards
Must be checked by experienced personnel and does not replace practical training.
Training material drafts
Trainee learning
Can generate fictional risk scenarios
Must not replace visual observation and designated signals.
On-site image assistance
Visual prompts
Image systems may flag obstacles or exclusion zone intrusions; the specific equipment and validation must be verified, they cannot replace on-site visual observation and designated signals, and this page does not evaluate products.
Return to service after repair is decided by authorized personnel.
Equipment maintenance records
Maintenance collaboration
Can organize fault history
First master equipment, signals, and safety rules, then use tools to assist low-risk records; any abnormality prompt must be verified by authorized on-site personnel.
Chinese mainland salary reference
92,036 yuan per year
The 2025 national urban non-private unit pre-tax average annual wage for all positions in the construction industry, not the pile driver operator median.
66,275 yuan per year
The 2025 national urban private unit pre-tax average annual wage for all positions in the construction industry, not a specific site contract or an individual crew quote.
80,739 yuan per year
The 2025 national above-scale enterprise cross-industry production, manufacturing, and related personnel pre-tax average annual wage, serving only as broad position background related to on-site equipment operation.
The Chinese industry and broad position arithmetic averages are not equal to the United States 47-2072 occupational wage median.
Verify by project and jurisdiction
The 2026 special operations catalogue lists building and municipal engineering pile rig operators, covering pile rig installation, commissioning, operation, and dismantling; the catalogue takes effect from 2026-06-01, and the assessment for this operation item starts on 2027-06-01. Current training, certificates, and project authorization must still be verified with the local authority and employer, and the transition period does not permit operating a rig without a certificate.
No comparable statistic obtained
This time no national wage distribution for pile driver operators in China was verified.
The National Bureau of Statistics of China May 2026 released the 2025 urban unit data.
Construction industry and production-related broad position background
Job seeking requires verifying the project, region, working hours, qualifications, and written contract.
There is no verifiable quantified value for the AI effect on Chinese pile driver operator pay, and pay cannot be inferred from digital inspection data.
The United States 47-2072 occupational scope and Chinese building pile rig operation qualifications are not automatically mutually recognized.
Verify the applicable special operations qualification
Chinese building pile rig operators
The 2026 special operations catalogue lists building and municipal engineering pile rig operators, covering pile rig installation, commissioning, operation, and dismantling; the catalogue takes effect from 2026-06-01, and the assessment for this operation item starts on 2027-06-01. Current training, certificates, and project authorization must still be verified with the local authority and employer, and the transition period does not permit operating a rig without a certificate.
High school diploma or equivalent
United States pile driver operators
BLS lists the typical entry-level education and medium-term on-the-job training; specific positions may differ.
Verify the ground crew duties
Site support positions
Ground crew work does not automatically grant pile rig operating rights.
Verify new equipment training and qualifications
Other equipment operator positions
Experience with one type of equipment is not authorization for another.
Building pile foundations
Verify according to the project location, equipment, and qualifications.
Bridges and municipal engineering
Verify the on-site work plan, working hours, and safety requirements.
Water-based foundation engineering
Verify the water construction environment and special protection requirements.
BLS 47-2072 standalone wages and projection|https://www.bls.gov/ooh/construction-and-extraction/construction-equipment-operators.htm
'Pile driver operator' is an occupational description; Chinese building and municipal engineering pile rig work should verify the building construction special operations requirements.
Insufficient evidence: no national occupation-specific wage median in mainland China directly comparable to United States 47-2072 was verified.
The construction industry wages and broad production and manufacturing position average are chosen according to pile driving and on-site equipment operation duties; none of these scopes is an occupation-specific median, and they do not cover the complete individual construction crew market.
National Bureau of Statistics 2025 average annual wage of urban unit employees|https://www.stats.gov.cn/sj/zxfb/202605/t20260515_1963707.html
The 2025 national urban unit construction industry pre-tax annual averages for all positions: non-private 92,036 and private 66,275 yuan per year; above-scale enterprise cross-industry production, manufacturing, and related personnel 80,739 yuan per year serves as broad position background. None is the pile driver operator median, and they do not include the complete individual construction crew market. United States BLS expects 47-2072 employment to change by -5.7% over 2025—2035, which does not represent Chinese pile foundation engineering demand. The United States 47-2072 occupation 2025 wage median is 73,300 dollars, not a Chinese position quote.
National official statistics
No comparable occupation-specific value for 47-2072
Specific project positions
Current written quotes and working hours must be verified
United States standalone occupational statistics
Cannot be converted into a Chinese wage
United States 47-2072 does not grant Chinese rig operating qualification. The 2026 special operations catalogue lists building and municipal engineering pile rig operators, covering pile rig installation, commissioning, operation, and dismantling; the catalogue takes effect from 2026-06-01, and the assessment for this operation item starts on 2027-06-01. Current training, certificates, and project authorization must still be verified with the local authority and employer, and the transition period does not permit operating a rig without a certificate.
National Bureau of Statistics 2025 average annual wage of urban unit employees|https://www.stats.gov.cn/sj/zxfb/202605/t20260515_1963707.html
United States BLS expects 47-2072 employment to change by -5.7% over 2025—2035, which does not represent Chinese pile foundation engineering demand.
The United States 47-2072 occupation 2025 wage median is 73,300 dollars, not a Chinese position quote.
United States salary reference
The standalone 47-2072 wages in the BLS construction equipment operator outlook|https://www.bls.gov/ooh/construction-and-extraction/construction-equipment-operators.htm; BLS 47-2072 standalone employment projection|https://www.bls.gov/emp/tables/occupational-projections-and-characteristics.htm; wage statistics methodology|https://www.bls.gov/oes/oes_ques.htm; O*NET 47-2072 national wage percentiles|https://www.onetonline.org/link/localwages/47-2072.00?zip=00000
48,790 dollars per year
United States 47-2072 pile driver operator 2025 national annual wage 10th percentile; not a new entrant starting salary or a specific project contract. O*NET national wage table citing BLS|https://www.onetonline.org/link/localwages/47-2072.00?zip=00000
58,510 dollars per year
United States 47-2072 pile driver operator 2025 national annual wage 25th percentile; not a new entrant starting salary or a specific project contract. O*NET national wage table citing BLS|https://www.onetonline.org/link/localwages/47-2072.00?zip=00000
73,300 dollars per year
United States 47-2072 pile driver operator 2025 national annual wage 50th percentile; not a new entrant starting salary or a specific project contract. O*NET national wage table citing BLS|https://www.onetonline.org/link/localwages/47-2072.00?zip=00000
106,430 dollars per year
United States 47-2072 pile driver operator 2025 national annual wage 75th percentile; not a new entrant starting salary or a specific project contract. O*NET national wage table citing BLS|https://www.onetonline.org/link/localwages/47-2072.00?zip=00000
124,600 dollars per year
United States 47-2072 pile driver operator 2025 national annual wage 90th percentile; not a new entrant starting salary or a specific project contract. O*NET national wage table citing BLS|https://www.onetonline.org/link/localwages/47-2072.00?zip=00000
About 2,300 people
The 2025 employment base period for BLS 47-2072, with the table in units of thousands.;BLS|https://www.bls.gov/emp/tables/occupational-projections-and-characteristics.htm
BLS expects 47-2072 employment to change by -5.7% over 2025—2035, a net decrease of about 100 people.;BLS|https://www.bls.gov/emp/tables/occupational-projections-and-characteristics.htm
About 200 per year
BLS expects about 200 average annual openings for 47-2072, including growth and replacement demand.;BLS|https://www.bls.gov/emp/tables/occupational-projections-and-characteristics.htm
United States 47-2072 is the standalone pile driver operator occupation. The wage median is May 2025 United States data and cannot be converted into a Chinese site quote or individual take-home pay.
The O*NET national wage table citing BLS2025 standalone 47-2072 data: the annual wage 10 / 25 / 50 / 75 / 90 percentiles are 48,790 / 58,510 / 73,300 / 106,430 / 124,600 dollars, not distributed directly by years of service. BLS expects 47-2072 employment of about 2,300 in 2025 and about 2,200 in 2035, a change of -5.7%; about 200 average annual openings including replacements. The United States 47-2072 pile driver operator 2025 wage median is 73,300 dollars per year.
Wages vary with the project location, construction season, working hours, and employer; the national median is not an individual quote.
Region and project
The pile rig type, construction environment, and whether other equipment work is also done change the position requirements, which must be verified against the written position.
Equipment and position duties
The BLS typical entry-level education is a high school diploma or equivalent plus medium-term on-the-job training; experience and qualifications do not correspond directly to the national percentiles.
Training and experience
BLS expects 47-2072 employment of about 2,300 in 2025 and about 2,200 in 2035, a change of -5.7%; about 200 average annual openings including replacements.
Building foundations
No same-scope industry wages obtained
The national occupational median is not a quote for this project.
Bridge foundation engineering
No same-scope industry wages obtained
Affected by region and working hours; no special wages are fabricated.
Port and wharf engineering
No same-scope industry wages obtained
The positions and safety requirements for water construction must be verified by project.
Other pile foundation projects
No same-scope industry wages obtained
Insufficient evidence: this time no same-scope occupational wage median for 47-2072 by pile foundation project or industry was verified; the overall construction equipment industry wages cannot be used to fill the gap.
No. 73,300 dollars is the 2025 47-2072 occupational national wage median, not a new entrant starting salary.
It cannot be used to compute individual after-tax monthly salary or Chinese site wages; see the working hours, region, and written contract.
The five-tier national annual wage percentiles come from the O*NET-cited BLS2025 standalone wage table, with the median cross-checked against the BLS outlook and detailed projection; overall employment and average annual openings come from the 2025—2035 detailed projection 47-2072 row.
Verify working hours, overtime, equipment and project, local qualifications, and the written pay structure.
The United States 47-2072 pile driver operator 2025 wage median is 73,300 dollars per year.
The national 2025 10th percentile is 48,790 dollars per year, not a new entrant starting salary; region, working hours, equipment, and project must be verified against the contract.
73,300 dollars per year is the median of the 2025 United States 47-2072 national wage distribution; all five tiers are occupational annual wage percentiles, not seniority grades, hourly quotes, individual after-tax income, or Chinese monthly salaries.
The national 2025 90th percentile is 124,600 dollars per year; it does not mean any senior operator can earn this, and the overall construction equipment percentiles cannot be transferred.
Career fit guide
- Holland occupational interest test
- Big Five personality test
- MBTI personality test
- Enneagram test
- Intelligence and reasoning test
- Emotional intelligence test
- Hoist and winch operators
- Construction laborers
- Other construction equipment operators
- Paving and tamping equipment operators
- Riggers
- Mobile heavy equipment mechanics
- O*NET pile driver operators
- BLS construction equipment operator outlook
- BLS detailed occupational projections
- O*NET other construction equipment operators
- O*NET construction laborers
- O*NET mobile heavy equipment mechanics
- China's 2026 special operations catalogue
- O*NET pile driver operators
O*NET realistic R100 and conventional C44, which can support discussion of machinery, outdoor, and procedural task preferences; not a rig operating qualification.
O*NET 47-2072 tasks and editorial exploration advice
- Enjoys machinery and outdoor work
- Willing to repeat inspections
Interest cannot replace an operating assessment.
Observe whether caution and reliability show up in stopping and shift handover behavior.
O*NET 47-2072 tasks and editorial exploration advice
- Willing to accept safety feedback
- Able to comply with the command chain
Personality scores are not safety ability.
Occupational group interests from O*NET do not prove safety skills, qualifications, or on-site authorization.
Can discuss communication and work preferences without judging operating ability or hiring by four-letter type. Use paper scenarios to verify hazard identification, recording, and escalation judgment.
Observe sustained interest in machinery, outdoor work, and repeated inspections.
O*NET 47-2072 tasks and editorial exploration advice
Realistic R100 and conventional C44 (O*NET 47-2072), usable for discussing preferences and not directly equal to the official RC code.
- Can identify unverified conditions
- Will escalate to authorized personnel
R dominant · machinery and site discipline
A paper self-rating is not equal to hands-on practice.
Can reflect on pressure to speed up, stopping disputes, and stress responses; the type does not prove safety performance. Compare whether on-site teamwork, weather and noise, and project pace are sustainable.
O*NET 47-2072 tasks and editorial exploration advice
- Accepts the outdoor environment
- Values crew safety
Preferences do not predict hiring.
Do not set an unverified IQ cutoff; observe the inspection sequence, abnormality recognition, and understanding of supervisory feedback. Accept supervised training and correction according to the model and rules.
O*NET 47-2072 tasks and editorial exploration advice
- Willing to inspect repeatedly
- Can record errors
One exercise cannot represent proficiency.
Observe whether one can clearly state the reason for stopping under pressure to speed up, accept commands, and escalate to the responsible person; EQ does not grant operating qualification. Verify the target position's equipment, qualification, working hours, and project requirements item by item.
O*NET 47-2072 tasks and editorial exploration advice
- Position conditions have been verified
- The authorization chain is clear
Assessments do not replace qualification.
Occupational group interest scores do not prove operating ability, health fitness, statutory qualification, or project authorization; the actual position is verified by equipment, jurisdiction, and employer.
The current O*NET interest score is dominated by realistic R100, with conventional C44 second; this supports discussing machinery and procedure-following preferences, and the two highest scores cannot be directly declared the official RC code. Inspection, designated signals, exclusion zones, and abnormal stopping performance verify work readiness far better.
Other construction equipment operator direction
Prefers multi-equipment earthmoving work
Different equipment and qualifications
Construction laborer direction
Willing to learn the process from ground crew work
Assistance does not grant rig operating rights
Mobile heavy equipment mechanic direction
Enjoys diagnosing and repairing machinery
Repair skills require separate training
Hoist and winch operator direction
Enjoys hoisting control
Equipment qualifications require separate verification
Paving and tamping equipment operator direction
Enjoys road construction machinery
The process and materials differ
Rigger direction
Enjoys lifting and signal collaboration
Rigger duties differ
This round the O*NET realistic R100 leads conventional C44 clearly; the ranking is not written directly as the official RC code.
Inspection, the command chain, exclusion zones, and abnormal stopping discipline are also required.
No. Real pile rig operation must comply with the applicable qualification, training, and project authorization.
O*NET lists lifting and alignment, pile driving, pre-shift inspection, and cleaning, lubrication, and replenishment.
No. Interest scores cannot replace qualification and supervised hands-on practice.
Operation focuses on pile material and pile hammer control; maintenance focuses on mechanical and hydraulic fault diagnosis.
BLS lists the United States typical high school diploma or equivalent plus medium-term on-the-job training; Chinese qualifications require separate verification.
No. 73,300 dollars is the 2025 47-2072 occupational median.
Interest shows long-term preference, and ability shows training, inspection, signals, and real authorization records.
Use only fictional A1/A2 materials for paper stop decisions and ask an experienced person to review.
Willing to continuously observe pile materials, personnel, and equipment condition outdoors.
If you keep acting when signals are unclear, or find it hard to accept a stop and review, take safety training first and assess on-site fit.
Use fictional materials to complete paper inspection and stop escalation; do not touch real equipment.
Tasks and the realistic-dominant interest score
47-2072 wages and training
47-2072 employment and openings
Adjacent equipment tasks
Equipment inspection and work environment
Work pressure, risks and boundaries
- See how AI changes specific tasks
- O*NET pile driver operator tasks
- BLS construction equipment operator outlook
- China's 2026 special operations catalogue
- NIST generative AI risk profile
- O*NET work environment
The risk card is for career exploration and is not an on-site operating procedure. Actual work follows the equipment instructions, special plan, applicable qualifications, project authorization, and emergency procedures.
Ground settlement, pile material swinging, pile hammer or hydraulic faults, personnel entering the restricted zone, noise, and weather can all affect pile rig work. When signals are unclear or conditions are unverified, stop and hand over to authorized personnel for review.
O*NET 47-2072 supports equipment operation, inspection, and the outdoor work context; the control measures are an editorial synthesis and cannot be treated as incident rates or unified national engineering thresholds.
Operators, ground crews, and the site supervisor
Risk of equipment tilting and injury to nearby personnel.
Stop the action, isolate, and have authorized personnel review the site and the plan.
New cracks, settlement, or abnormal supports may affect pile rig stability.
Signalers, operators, and other workers
Personnel struck or injured by suspended loads.
Execute only through the designated signal chain; do not start when commands conflict or the area has not been confirmed clear.
Pile material swinging, an uncleared exclusion zone, or non-designated commands.
Operators, maintenance personnel, and the site team
Loss of control, falls, or equipment damage.
Pre-shift inspection, abnormal stopping and isolation, and handing maintenance to authorized personnel.
Abnormal wire ropes, pile hammers, leads, or hydraulic systems.
Attention and signal reception are affected.
Adjust the work to the project conditions, wear protection, and maintain communication.
Outdoor noise, wind and rain, or changed visibility.
Surveyors, operators, and the project leader
Facility damage or foundation quality problems.
Verify the position against the approved drawings and on-site briefing; stop and review when unknown.
Underground utilities, surrounding structures, or pile position deviations not verified.
Operators, the site supervisor, and acceptance personnel
The successor cannot judge whether work can continue.
Record the original observations, time, recipient, and open conditions, and hand over to the authorized responsible person.
Incomplete records of pile number, depth, abnormalities, or the reason for stopping.
47-2072 operation and inspection
Work environment and training
Building pile rig operation qualification scope
Digital record tool risk governance
Outdoor, noise, and protection
Entry, credentials and career development
How do the entry positions and initial tasks of pile driver operators compare?
| Entry positions | What you mainly do at the start | What employers usually look at | How to prove it without experience | Differences from other directions |
|---|---|---|---|---|
| Ground construction assistance | Watch the exclusion zone, material condition, and crew briefing and record abnormalities as assigned. | Whether one can obey the designated signal chain and proactively report hazards. | Paper inspection cards and handover records. | Does not operate the pile rig. |
| Trainee pile rig operator positions | Learn equipment inspection, signal confirmation, and operating boundaries under qualified personnel supervision. | Verify the training, assessment, equipment model, and supervision method. | Record the training content and mentor feedback. | Training must not be equated with independent authorization. |
| Pile driver operators | Complete equipment inspection, alignment, pile driving, and stop handover according to the plan and on-site signals. | Verify the statutory qualification, equipment model capability, and project authorization. | Show real lawful experience and reviewable records. | Separate from lifting, survey, and maintenance duties. |
| Equipment maintenance assistance | Assist with inspection, cleaning, and replenishment under the shutdown and isolation requirements. | Whether one can identify faults that must not be self-repaired. | Maintenance records and abnormality escalation forms. | Repair authority follows equipment and employer rules. |
| Foundation engineering survey assistance | Assist with confirming and recording the pile position and do not direct pile hammer operation. | Verify the survey method and briefing boundaries. | Fictional pile position verification records. | Survey duties do not grant rig operating qualification. |
What do employers usually look at in hiring?
Content pending
Typical education and training
BLS 47-2072 lists a high school diploma or equivalent plus medium-term on-the-job training; specific employers may require project experience.
Verify the equipment, region, working hours, and training requirements of public postings item by item.
Content pending
Chinese qualification verification
The 2026 special operations catalogue lists building and municipal engineering pile rig operators, covering pile rig installation, commissioning, operation, and dismantling; the catalogue takes effect from 2026-06-01, and the assessment for this operation item starts on 2027-06-01. Current training, certificates, and project authorization must still be verified with the local authority and employer, and the transition period does not permit operating a rig without a certificate.
Verify the category, validity period, and equipment model with the local authority and employer.
Content pending
Official task list
O*NET lists lifting and alignment, pile driving, pre-shift inspection, and cleaning and lubrication.
Compare the position duties with the real training experience item by item.
Content pending
Safety collaboration
Signals, exclusion zones, stopping, and shift records affect site safety.
Paper risk identification can be shown; actual operation can only follow qualification and authorization.
Paper exercise: fictional pile rig pre-shift briefing and stop decision
Content pending
Materials and setup|all fictional data
Fictional scenario: before pile position work at P-07, the learner is only responsible for reading the briefing and filling in a paper stop record and does not operate the equipment. All numbers are problem premises, not construction parameters.
A1: the pre-shift form records that the equipment has been inspected; but the ground observation column notes new cracks and the bearing capacity review column is blank.
A2: the designated signaler has not yet confirmed that the exclusion zone is clear; another non-designated person gives the command that hoisting may begin.
Content pending
Tasks and deliverables
Write a pre-start condition form: mark each of the four items (equipment, ground, personnel exclusion, and single signal chain) as verified or unverified and list the original material numbers.
Then write a stop escalation form: do not start for now; explain the ground cracks and the blank bearing capacity review, the unconfirmed exclusion zone, and the conflicting commands, and hand it to the site supervisor and the designated signaler for verification.
Content pending
Reference answer (do it independently first)
A1 only proves that the equipment inspection was recorded, not that the ground is safe; the ground item should be marked unverified. A2 shows that the isolation and signal chain do not hold, so those two items are also marked unverified.
The conclusion is not to start; one must not set an allowed crack value on one's own and must not accept a command from a non-designated person. Only after authorized personnel complete the review and briefing does the site team decide again.
Content pending
Boundaries and scoring
Four-point scoring: mark the evidence item by item, identify the three unverified conditions, correctly write not to start and the escalation recipient, and do not fabricate engineering thresholds or operating steps; one point for each.;The whole exercise is completed on paper, without connecting to real equipment, sites, or personnel; a perfect paper score does not constitute training, assessment, or authorization.
What reviewable work materials can be prepared at entry?
Content pending
Pre-start condition check card
List the equipment, ground, isolation, signal chain, and A1/A2 evidence.
Let a peer review every verified or unverified judgment.
Content pending
Stop escalation form
Write the P-07 item, the observed new cracks, the unconfirmed area clearance, the conflicting commands, and the recipient.
Do not fill in fictional thresholds and do not approve resumption on behalf of the site supervisor.
Content pending
Shift record
List the material versions, items pending review, responsible persons, and subsequent decision points.
Content pending
Review card
Write the basis for this judgment, what is still unknown, and the reason for the revision.
What might the interview and probation period examine, and which conclusions cannot be inferred?
| Stage | Possible focus | Observation evidence | Use boundaries |
|---|---|---|---|
| Interview follow-up on inspection | How to handle a conflict between the inspection form record and on-site observation | Point out the cracks and the blank bearing capacity review in A1 | A paper answer is not equal to actual equipment qualification |
| Interview follow-up on commands | Who may give a valid hoisting signal | Refuse commands from non-designated persons and verify that the area is clear | The specific signal system follows the on-site plan |
| Training period records | Whether abnormalities and handovers can be recorded continuously | Record the facts, time, and recipient | Training is not equal to independent operating authorization |
| Sudden on-site stoppage | What to do if settlement is found or personnel enter the danger zone | Stop first and escalate according to the emergency procedure | Do not handle equipment faults on one's own based on the exercise |
Seven-day experience: fictional pile rig site hazard identification
Content pending
Day One
Read A1/A2 and draw the four-item condition table for equipment, ground, isolation, and signals.
Content pending
Day Two
Mark the items already recorded in A1 and the still-blank bearing capacity review.
Content pending
Day Three
Mark the unconfirmed area clearance and the non-designated command in A2.
Content pending
Day Four
Independently write the stop escalation form without proposing any self-operated steps.
Content pending
Day Five
Have a peer verify every judgment against the original materials.
Content pending
Day Six
Compare with the reference answer and the four-point scoring rubric and correct the errors.
Content pending
Day Seven
File the first draft, revised draft, and reflection; decide whether to explore a formal training and qualification path.
How to decide at the end of seven days whether to continue
- See whether you are willing to keep performing repeated inspections and signal discipline, rather than only liking machines.
- See whether you can acknowledge unverified conditions and refuse to start when others push you to hurry.
- Record the daily effort and attention feelings, and do not treat interest scores as ability.
- If you cannot accept outdoors, noise, weather, and crew pace, compare adjacent directions first.
- If you want to continue, look up the local building pile rig operation training, assessment, and project requirements.
- Real equipment model training should be organized by a qualified institution and employer, and paper exercises are not a substitute.
- Keep your work and its basis, but do not write it up as actual construction or licensed experience.
Education, training, and qualifications: which are the real thresholds for this occupation?
| Qualification / identity | Who it mainly suits | Realistic role in job seeking | Whether it is a general hiring threshold | Application / registration conditions | Level of investment | Important limits |
|---|---|---|---|---|---|---|
| Chinese building pile rig operation qualification | People who intend to operate pile rigs on Chinese building and municipal engineering projects | Verify the 2026 catalogue and the assessment added on 2027-06-01 | Verify with the current local authority and project requirements | Verify the equipment, project, certificate category, and validity period | Training and assessment investment varies by region | Qualification, project authorization, and specific equipment model capability are verified separately |
| United States high school diploma or equivalent | United States 47-2072 beginners | BLS lists the typical entry-level education | A typical education, not the only national statutory threshold | See the employer posting | Investment during the school stage | Does not grant pile rig operating rights |
| United States on-the-job training | Newly hired pile rig positions | BLS lists medium-term on-the-job training | Part of the typical training path | Depends on employer supervision and equipment arrangements | Continuous on-the-job training | Training is not equal to independent work |
| Equipment-specific training | People moving to a different equipment model | Add equipment inspection, operation, and emergency knowledge | According to equipment and project requirements | Check the training institution, employer, and authority | Depends on the equipment model | Experience with one model does not transfer automatically |
| On-site signal and collaboration training | Ground support and operating teams | Clarify the signal chain and danger zone boundaries | According to on-site rules | Check the project briefing | Continuous retraining | Signal training is not equal to pile rig operating qualification |
| Paper risk identification work | People preparing to explore the occupation | Proves that one can explain the stop decision | Not an entry qualification | Uses fictional materials | A one-week exercise | Does not prove actual operating ability or statutory qualification |
Notes on qualifications and authorization boundaries
The United States BLS typical education and training do not grant a rig operating permit. The 2026 special operations catalogue lists building and municipal engineering pile rig operators, covering pile rig installation, commissioning, operation, and dismantling; the catalogue takes effect from 2026-06-01, and the assessment for this operation item starts on 2027-06-01. Current training, certificates, and project authorization must still be verified with the local authority and employer, and the transition period does not permit operating a rig without a certificate.
In Chinese building and municipal engineering settings, pile rig operators fall under building construction special operations; the specific equipment and operating scope, and certificate status, are confirmed by the authority and the project.
Training, assessment, certificate, employer hiring, project authorization, and equipment model capability are different states; one does not replace another.
The paper exercises on this page prohibit real rig operation, repair, lifting, or entering danger zones, and actual work follows the on-site plan and emergency procedures.
Notes on the hiring sample
This page did not use a single job advertisement to infer a national threshold; job seeking should verify the current position's equipment, project, qualification, working hours, and region.
United States BLS and O*NET describe a United States occupation, and China's 2026 catalogue describes Chinese building construction qualifications; the two cannot be mutually recognized.
- BLS occupational outlook (education and experience)
- O*NET pile driver operator occupation profile
- National Bureau of Statistics 2025 urban unit wages
- 2026 special operations catalogue (building pile rig operators)
The four stages in this module are used to organize ability development and are not a years table, a rank table, or a promotion promise. Staffing, authorization, and promotion rules vary greatly between organizations; the stage names describe an observable task scope, not a unified rank.
Recognize exclusion zones, designated signals, and stop conditions; identify the unverified items in A1/A2 on paper.
Safety observation
Learn inspection and operation according to the equipment model, jurisdiction, and project requirements and record mentor feedback.
Supervised training
Work under the on-site plan once qualification, equipment model capability, and employer authorization are complete.
Authorized operation
Maintain capability through abnormal case reviews and equipment updates; a different model requires re-verifying qualification and authorization.
Continuous retraining
A job title alone must not be used to assert that no special license is needed. The United States typical high school plus medium-term on-the-job training is not a statutory permit; Chinese building and municipal engineering pile rig work verifies qualifications, equipment model training, and project authorization according to the 2026 catalogue, the assessment arrangement added in 2027, and current local requirements. Paper exercises do not grant operating qualification.
Chinese building pile rig operator qualification, employer hiring, project authorization, and equipment model training must be verified separately; the United States BLS typical education does not constitute a Chinese certificate. BLS notes that some United States states and cities require pile driver operators to obtain a crane license, which requires separate verification by locality.
United States BLS and O*NET describe only the United States occupation; the Chinese special operations catalogue applies to the specified building construction settings, and the qualifications of the two countries are not automatically mutually recognized.
From paper observation to supervised training to authorized operation; without qualification and authorization, only permitted learning and ground crew work are done.
The BLS outlook supports the United States typical education and on-the-job training and cannot explain Chinese statutory qualification.
O*NET supports the five 47-2072 tasks and the work context and does not explain specific on-site engineering thresholds.
The National Bureau of Statistics construction industry and production-related broad position pre-tax annual averages serve only as wage background and cannot be used to determine pile rig operator income or qualification.
The 2026 catalogue lists building and municipal engineering pile rig operators; assessment for this item starts on 2027-06-01, and current qualifications are verified with the local authority.
Paper learning does not grant rig operating qualification.
First verify the local qualification and training entry point.
Submit the fictional A1/A2 condition table.
Only observe and record the designated signals and exclusion zone; do not touch the controls.
Site observers
Cannot operate independently.
Continue training on the project equipment.
The mentor signs off the training and error correction records.
Learn equipment model inspection and operating boundaries under qualified training and supervision.
Supervised trainees
Verify the locally valid qualification, specific equipment model training, and project authorization; stopping and personnel safety follow the on-site responsibility chain.
Retrain regularly and verify qualification validity.
Real lawful work and shift records can be verified.
Inspect, align, drive piles, and stop according to the plan, signals, and equipment requirements.
Authorized operators
Experience does not substitute for engineering acceptance or maintenance qualification.
Changing equipment model requires separate verification of training and authorization.
Can explain stop cases and improvements.
Teach and review collaboratively within the original model's authorization scope.
Experienced operators
Do not issue unauthorized operating commands.
Take part in position briefings and training.
Draw the exclusion zone and command chain on paper.
Learn about danger zones, pile materials, and on-site signal roles.
Ground observers
Collaboration is not equal to rig operation.
Verify the on-site signal or lifting qualification.
Shift records are traceable.
Observe area clearance and report abnormalities as assigned.
Ground crew members
Stop immediately when signals conflict.
Take part in project retraining.
Records of signal consistency and abnormal pauses.
Pass valid commands to the operator within the authorized scope.
Designated signalers
Do not approve hazardous work on behalf of engineering technical personnel.
Verify equipment and position changes.
Problem closure records.
Organize briefings and command chain reviews.
Collaboration leads
Do not repair beside running equipment.
Take equipment safety training.
Point out omissions in the fictional materials.
Learn pile rig component names and the pre-shift form.
Inspection observers
Hand fault repair to authorized personnel.
Study the specific equipment model manual.
Supervised maintenance records.
Assist with cleaning, lubrication, and replenishment under the shutdown and isolation requirements.
Maintenance assistants
Rig operating qualification alone does not permit maintenance.
Verify maintenance qualification and manufacturer requirements.
Repair, retest, and handover evidence.
Diagnose mechanical or hydraulic faults under professional authorization.
Equipment maintenance personnel
Return to service is decided by the authorized project responsible person.
Track equipment model updates.
The retest and approval chain is traceable.
Manage defect closure and the return-to-service process.
Maintenance leads
Career outlook and related transitions
- See the AI impact and task change analysis on this page
- See the scope of United States wage and employment data
- BLS 47-2072 detailed projection
- BLS construction equipment operator outlook
- O*NET pile driver operators
- China's 2026 special operations catalogue
- Other construction equipment operators
- Construction laborers
- Mobile heavy equipment mechanics
- Hoist and winch operators
- Paving and tamping equipment operators
- Crane and tower crane operators
- Riggers
- Pipelayers
The standalone BLS 47-2072 projection shows a 2025—2035 employment change of -5.7% and about 200 average annual openings; openings include replacements, and the decline rate cannot be used to presume demand for every project.
2025 base period—2035 projection
About 2,300 is the 2025 base period and about 2,200 is the 2035 projection; the thousands table is rounded and is not the current number of hires.
Not the current number of job openings, nor the number of Chinese positions.
United States 47-2072 employment endpoints
The 47-2072 pile driver operator standalone row
About 2,300 people (2025) → about 2,200 people (2035)
The overall construction equipment operator outlook and the standalone 47-2072 projection have different scopes; this page uses only the standalone row's -5.7%.
Does not mean every region or project contracts.
Projected change
The 47-2072 pile driver operator standalone row
Includes growth and replacement demand from retirement, role changes, and the like.
Different from the ten-year net change and cannot be treated as individual hiring probability.
Average annual openings
The 47-2072 pile driver operator standalone row
About 200 per year
Standalone occupational employment and openings
47-2072 wages and training
Tasks and the RC interest
Building pile rig operation qualification scope
Excavation, loading, and grading equipment and qualifications
Equipment inspection, on-site signals, and machinery control
Editorial comparison: medium
Ground support processes and physical load
On-site safety observation and material collaboration
Editorial comparison: low
Diagnostic and repair qualifications
Equipment condition observation and fault records
Editorial comparison: high
Specific hoisting equipment and qualifications
Hoisting control and signal collaboration
Editorial comparison: medium
Road surface materials and construction processes
Construction equipment inspection and work records
Editorial comparison: medium
Crane qualification and equipment model training
Lifting danger zones and signal discipline
Editorial comparison: high
Rigging inspection, slinging, and signal roles
Lifting collaboration and pile material safety
Editorial comparison: medium
Pipe slope, joints, and trench safety
Construction site survey and underground utility awareness
Editorial comparison: medium
Questions and sources
What do pile driver operators do every day?
O*NET 47-2072 lists operating the hoist and pile hammer, aligning and driving piles, pre-shift inspection, and cleaning, lubrication, and replenishment. Actual work must also follow the construction plan and designated signals and record abnormal shift handovers.
How do pile driver operators differ from other construction equipment operators?
The former centers on foundation pile materials, the pile hammer, and pile driving; the latter often operates excavation, pushing, loading, and grading equipment. Equipment skills and qualifications do not transfer automatically.
How do I judge whether I am suited?
See whether you can keep inspecting, stay alert in outdoor noise and weather, obey the command chain, and stop when conditions are unverified. RC interests are only an exploration clue.
Will AI reduce pile driver operator positions?
This time no reliable 47-2072 replacement rate was verified. Tools can organize records or flag abnormalities but cannot verify on-site ground, personnel, and equipment; the BLS projection also does not attribute the employment change to AI.
What is the wage of pile driver operators in mainland China?
No Chinese national occupational wage median comparable to United States 47-2072 was verified. The 2025 national urban unit construction industry pre-tax annual averages for all positions: non-private 92,036 and private 66,275 yuan per year; above-scale enterprise cross-industry production, manufacturing, and related personnel 80,739 yuan per year serves as broad position background. None is the pile driver operator median, and they do not include the complete individual construction crew market.
Does the United States median wage represent new entrant income?
No. The United States 47-2072 2025 median annual wage is 73,300 dollars; the 10 / 25 / 75 / 90 percentiles are 48,790 / 58,510 / 106,430 / 124,600 dollars. All are national occupational percentiles, not a new entrant starting salary or a site contract.
What education and training are needed to enter?
BLS lists a high school diploma or equivalent, no related work experience required, and medium-term on-the-job training for United States 47-2072. Specific employers and Chinese requirements require separate verification.
What qualification does Chinese building pile rig operation need?
The 2026 special operations catalogue lists building and municipal engineering pile rig operators, covering pile rig installation, commissioning, operation, and dismantling; the catalogue takes effect from 2026-06-01, and the assessment for this operation item starts on 2027-06-01. Current training, certificates, and project authorization must still be verified with the local authority and employer, and the transition period does not permit operating a rig without a certificate. Paper exercises do not grant operating qualification.
Where is it most likely to go wrong?
Ground settlement, personnel entering the restricted zone, conflicting signals, and abnormal pile hammers or wire ropes all require stopping and review by authorized personnel; do not set safety thresholds on your own from experience.
What are the prospects in the United States and where can I transfer to?
BLS 47-2072 projects employment of about 2,300 in 2025 to about 2,200 in 2035, a change of -5.7%, with about 200 average annual openings including replacements. Adjacent equipment operation, construction support, or maintenance require separate verification of skills and qualifications.
FermatMind career content team (official source review and editorial compilation, not an on-site operating procedure)
Insufficient evidence: a China-specific national occupational wage median was not verified. According to pile driving duties, the National Bureau of Statistics construction industry and production-related broad position pre-tax annual averages are referenced; the United States standalone quintiles follow the O*NET-cited BLS2025, and overall employment follows BLS2025 through 2035. Tasks and the realistic-dominant interest score follow O*NET; the Chinese qualification catalogue takes effect in 2026 while assessment for this item starts on 2027-06-01.
Official evidence review this round: 2026-10-12; historical access dates in the register are kept as originally recorded, and the current statistical and qualification scopes are verified separately for this round's reading.
The Chinese text on this page explains the United States occupational scope; Chinese qualifications are verified by project and authority. All paper exercise materials are fictional and cannot be used for real pile rig operation.
- 47-2072.00 Pile Driver Operators
Supports tasks, work context, and RC interests; its page's 2024—2034 projection is not the latest BLS projection used on this page.
Supports tasks, work context, and RC interests; its page's 2024—2034 projection is not the latest BLS projection used on this page.
O*NET OnLine
United States
2026 update
official occupation profile
Occupation-specific
Supports tasks, work context, and RC interests; its page's 2024—2034 projection is not the latest BLS projection used on this page.
2026-10-03
- Construction Equipment Operators
This page takes only the standalone pile driver operator wage row; the training and licensing narrative covers the combined occupation scope.
This page takes only the standalone pile driver operator wage row; the training and licensing narrative covers the combined occupation scope.
U.S. Bureau of Labor Statistics
United States
May 2025 wages
official occupation outlook and projection
combined_official
This page takes only the standalone pile driver operator wage row; the training and licensing narrative covers the combined occupation scope.
2026-10-03
- Occupational projections and worker characteristics, Table 1.2
Takes only the standalone 47-2072 row; employment is in thousands and rounded.
Takes only the standalone 47-2072 row; employment is in thousands and rounded.
U.S. Bureau of Labor Statistics
United States
2025—2035
Official employment projection
market_signal
Takes only the standalone 47-2072 row; employment is in thousands and rounded.
2026-10-03
- Occupational Employment and Wage Statistics
Keep the original statistical entry identity and do not substitute the overall construction equipment percentiles for this occupation
This round added a verified standalone national wage table, and the previous not-verified conclusion has been updated
U.S. Bureau of Labor Statistics
United States
May 2025
Official wage statistics entry point
market_signal
This entry does not directly provide the quintiles cited on this page; the standalone 47-2072 national 2025 percentiles are in pile-wages
2026-10-03
- 2025 average annual wage of urban unit employees
2025 construction industry non-private 92036 and private 66275 yuan per year pre-tax annual averages
Above-scale enterprise cross-industry production, manufacturing, and related personnel 80739 yuan per year pre-tax annual average
National Bureau of Statistics
Mainland China
Annual 2025
Official industry and broad position wage statistics
market_signal
The industry and broad position figures are not the pile driver operator median and do not cover the complete individual construction crew market
2026-10-03
- 2026 special operations catalogue
21.1 covers building and municipal engineering pile rig installation, commissioning, operation, and dismantling
Appendix Four (Three) provides that assessment for this operation item starts on 2027-06-01
Ministry of Emergency Management and others
Mainland China
The catalogue takes effect on 2026-06-01; assessment for building pile rig operators starts on 2027-06-01
Official special operations catalogue
market_signal
Current certificates, training, and project requirements are verified with the local authority; the transition period does not mean operating without a certificate is allowed
2026-10-03
- DB11/T 1833-2021 Building Construction Safety Operating Regulations
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions.
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions. (See the original source for the supplementary scope.)
Beijing Municipal Market Supervision Administration
CN
2021
official local construction safety standard
market_signal
Beijing local standard; do not generalize numeric thresholds nationwide.
2026-10-03
- DB11/T 1833-2021 Building Construction Safety Operating Regulations
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions.
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions. (See the original source for the supplementary scope.)
Beijing Municipal Market Supervision Administration
CN
2021
official local construction safety standard
market_signal
Beijing local standard; do not generalize numeric thresholds nationwide.
2026-08-30
- DB11/T 1833-2021 Building Construction Safety Operating Regulations
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions.
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions. (See the original source for the supplementary scope.)
Beijing Municipal Market Supervision Administration
CN
2021
official local construction safety standard
market_signal
Beijing local standard; do not generalize numeric thresholds nationwide.
2026-08-30
- DB11/T 1833-2021 Building Construction Safety Operating Regulations
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions.
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions. (See the original source for the supplementary scope.)
Beijing Municipal Market Supervision Administration
CN
2021
official local construction safety standard
market_signal
Beijing local standard; do not generalize numeric thresholds nationwide.
2026-08-30
- DB11/T 1833-2021 Building Construction Safety Operating Regulations
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions.
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions. (See the original source for the supplementary scope.)
Beijing Municipal Market Supervision Administration
CN
2021
official local construction safety standard
market_signal
Beijing local standard; do not generalize numeric thresholds nationwide.
2026-08-30
- DB11/T 1833-2021 Building Construction Safety Operating Regulations
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions.
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions. (See the original source for the supplementary scope.)
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions. (See the original source for the supplementary scope.)
Beijing Municipal Market Supervision Administration
CN
2021
official local construction safety standard
market_signal
Beijing local standard; do not generalize numeric thresholds nationwide.
2026-08-30
- DB11/T 1833-2021 Building Construction Safety Operating Regulations
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions.
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions. (See the original source for the supplementary scope.)
Beijing Municipal Market Supervision Administration
CN
2021
official local construction safety standard
market_signal
Beijing local standard; do not generalize numeric thresholds nationwide.
2026-08-30
- DB11/T 1833-2021 Building Construction Safety Operating Regulations
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions.
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions. (See the original source for the supplementary scope.)
Beijing Municipal Market Supervision Administration
CN
2021
official local construction safety standard
market_signal
Beijing local standard; do not generalize numeric thresholds nationwide.
2026-08-30
- DB11/T 1833-2021 Building Construction Safety Operating Regulations
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions.
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions. (See the original source for the supplementary scope.)
Beijing Municipal Market Supervision Administration
CN
2021
official local construction safety standard
market_signal
Beijing local standard; do not generalize numeric thresholds nationwide.
2026-08-30
- DB11/T 1833-2021 Building Construction Safety Operating Regulations
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions.
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions. (See the original source for the supplementary scope.)
Beijing Municipal Market Supervision Administration
CN
2021
official local construction safety standard
market_signal
Beijing local standard; do not generalize numeric thresholds nationwide.
2026-08-30
- DB11/T 1833-2021 Building Construction Safety Operating Regulations
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions.
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions. (See the original source for the supplementary scope.)
Beijing Municipal Market Supervision Administration
CN
2021
official local construction safety standard
market_signal
Beijing local standard; do not generalize numeric thresholds nationwide.
2026-08-30
- DB11/T 1833-2021 Building Construction Safety Operating Regulations
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions.
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions. (See the original source for the supplementary scope.)
Beijing Municipal Market Supervision Administration
CN
2021
official local construction safety standard
market_signal
Beijing local standard; do not generalize numeric thresholds nationwide.
2026-08-30
- DB11/T 1833-2021 Building Construction Safety Operating Regulations
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions.
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions. (See the original source for the supplementary scope.)
Beijing Municipal Market Supervision Administration
CN
2021
official local construction safety standard
market_signal
Beijing local standard; do not generalize numeric thresholds nationwide.
2026-08-30
- DB11/T 1833-2021 Building Construction Safety Operating Regulations
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions.
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions. (See the original source for the supplementary scope.)
Beijing Municipal Market Supervision Administration
CN
2021
official local construction safety standard
market_signal
Beijing local standard; do not generalize numeric thresholds nationwide.
2026-08-30
- DB11/T 1833-2021 Building Construction Safety Operating Regulations
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions.
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions. (See the original source for the supplementary scope.)
Beijing Municipal Market Supervision Administration
CN
2021
official local construction safety standard
market_signal
Beijing local standard; do not generalize numeric thresholds nationwide.
2026-08-30
- DB11/T 1833-2021 Building Construction Safety Operating Regulations
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions.
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions. (See the original source for the supplementary scope.)
Beijing Municipal Market Supervision Administration
CN
2021
official local construction safety standard
market_signal
Beijing local standard; do not generalize numeric thresholds nationwide.
2026-08-30
- DB11/T 1833-2021 Building Construction Safety Operating Regulations
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions.
Beijing Municipal Market Supervision Administration
CN
2021
official local construction safety standard
market_signal
Beijing local standard; do not generalize numeric thresholds nationwide.
2026-08-30
- DB11/T 1833-2021 Building Construction Safety Operating Regulations
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions.
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions. (See the original source for the supplementary scope.)
Beijing Municipal Market Supervision Administration
CN
2021
official local construction safety standard
market_signal
Beijing local standard; do not generalize numeric thresholds nationwide.
2026-08-30
- DB11/T 1833-2021 Building Construction Safety Operating Regulations
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions.
Local official detailed controls for earthwork and pile machinery, ground, utilities, inspection and stop conditions. (See the original source for the supplementary scope.)
Beijing Municipal Market Supervision Administration
CN
2021
official local construction safety standard
market_signal
Beijing local standard; do not generalize numeric thresholds nationwide.
2026-08-30
- FermatMind editorial synthesis and fictional exercises for this occupation
Transfer distance, exploration paths, and tool trial advice are editorial judgments
The P-07 paper scenario is fictional material and does not prove rig operating qualification
FermatMind
Chinese and United States boundaries kept separate
2026-10-03
Editorial synthesis
context
Not official statistics, an on-site operating procedure, a qualification, or an actual equipment evaluation
2026-10-03
- O*NET National Wages 47-2072.00
Annual wage 10 / 25 / 50 / 75 / 90 percentiles 48790 / 58510 / 73300 / 106430 / 124600 dollars
The median hourly wage is 35.24 dollars and the median annual wage is 73300 dollars
O*NET citing the U.S. Bureau of Labor Statistics
United States
2025 annual wage data
Official occupational wages
Occupation-specific
The national percentiles are not seniority, starting salary, or a contract, and the industry and project breakdown was still not verified
2026-10-03
- Generative AI and Jobs: A Refined Global Index of Occupational Exposure
The task-level exposure method serves as analytical background, not as statistics on the actual effect for 47-2072
International Labour Organization
Global
2025-05-20
Institutional task exposure study
context
Task exposure is not equal to adoption, layoffs, a replacement rate, or a disappearance year
2026-10-03
- NIST AI 600-1 Generative AI Profile
Focus on erroneous output, sensitive data, and capability validation boundaries
Tool suggestions are still reviewed by domain personnel and the authorization process
National Institute of Standards and Technology
General technical background
2024
Official technical risk guidance
context
Not a pile rig equipment control standard, a product evaluation, or a position replacement projection
2026-10-03
- Notice on Issuing the Special Operations Catalogue, Emergency [2026] No. 45
The catalogue takes effect from 2026-06-01; see the catalogue annex for specific operations and transition arrangements
Ministry of Emergency Management, Ministry of Housing and Urban-Rural Development, National Mine Safety Administration
China
Drafted on 2026-05-22, effective from 2026-06-01
Official catalogue implementation notice
context
The catalogue's unified effective date does not replace the assessment date of the items added in the appendix
2026-10-03
- O*NET Operating Engineers and Other Construction Equipment Operators 47-2073.00
Operate construction machinery such as excavation, pushing, loading, and grading equipment
Exploration direction and transfer distance are editorial synthesis, and real qualifications require separate verification
U.S. Department of Labor, O*NET
United States
Read and verified tasks on 2026-10-03
Official occupational tasks
context
Adjacent duties are not this occupation's wages, qualification mutual recognition, or an official transfer score
2026-10-03
- O*NET Construction Laborers 47-2061.00
Clear the area, dig trenches, move materials, and signal equipment operators
Exploration direction and transfer distance are editorial synthesis, and real qualifications require separate verification
U.S. Department of Labor, O*NET
United States
Read and verified tasks on 2026-10-03
Official occupational tasks
context
Adjacent duties are not this occupation's wages, qualification mutual recognition, or an official transfer score
2026-10-03
- O*NET Mobile Heavy Equipment Mechanics, Except Engines 49-3042.00
Diagnose, repair, and retest mobile heavy equipment
Exploration direction and transfer distance are editorial synthesis, and real qualifications require separate verification
U.S. Department of Labor, O*NET
United States
Read and verified tasks on 2026-10-03
Official occupational tasks
context
Adjacent duties are not this occupation's wages, qualification mutual recognition, or an official transfer score
2026-10-03
- O*NET Hoist and Winch Operators 53-7041.00
Operate winches and hoisting equipment on signals
Exploration direction and transfer distance are editorial synthesis, and real qualifications require separate verification
U.S. Department of Labor, O*NET
United States
Read and verified tasks on 2026-10-03
Official occupational tasks
context
Adjacent duties are not this occupation's wages, qualification mutual recognition, or an official transfer score
2026-10-03
- O*NET Paving, Surfacing, and Tamping Equipment Operators 47-2071.00
Pave road surfaces or tamp construction materials
Exploration direction and transfer distance are editorial synthesis, and real qualifications require separate verification
U.S. Department of Labor, O*NET
United States
Read and verified tasks on 2026-10-03
Official occupational tasks
context
Adjacent duties are not this occupation's wages, qualification mutual recognition, or an official transfer score
2026-10-03
- O*NET Riggers 49-9096.00
Select, install, and test rigging and collaborate in moving loads
Exploration direction and transfer distance are editorial synthesis, and real qualifications require separate verification
U.S. Department of Labor, O*NET
United States
Read and verified tasks on 2026-10-03
Official occupational tasks
context
Adjacent duties are not this occupation's wages, qualification mutual recognition, or an official transfer score
2026-10-03
- O*NET Crane and Tower Operators 53-7021.00
Operate hoisting equipment to lift and move materials
Exploration direction and transfer distance are editorial synthesis, and real qualifications require separate verification
U.S. Department of Labor, O*NET
United States
Read and verified tasks on 2026-10-03
Official occupational tasks
context
Adjacent duties are not this occupation's wages, qualification mutual recognition, or an official transfer score
2026-10-03
- O*NET Pipelayers 47-2151.00
Position and seal pipes in trenches
Exploration direction and transfer distance are editorial synthesis, and real qualifications require separate verification
U.S. Department of Labor, O*NET
United States
Read and verified tasks on 2026-10-03
Official occupational tasks
context
Adjacent duties are not this occupation's wages, qualification mutual recognition, or an official transfer score
2026-10-03