Preparing content…

Wind Energy Development Managers

SOC 11-9199 · O*NET 11-9199.10

O*NET-SOC11-9199.10Wind opportunity development and evaluationResearch, permit documents, and budget coordination
50%AI Impact ScoreFermatMind / 费马测试

Wind development managers coordinate project plans, resource assessment, land use, interconnection, budget and schedule. They prepare the dependencies and approvals for project decisions.

Model impact index for three equally weighted representative core tasks; not a measured share of working time or a job-loss probability. floor((50+75+25)/3+0.5)=50; fermatmind-ai-impact-v1; 2026-10-18.

Parent group $141,900/yearOther managers parent group 2025 medianU.S. Bureau of Labor Statistics
Source: U.S. Bureau of Labor Statistics|United States|2025|11-9199 parent group median wage; Editorial conversion: Cites directly the 2025 other managers parent group official annual median wage, not an independent wind development wage or after-tax income.
Parent group 4.9%Other managers parent group 2025—2035 changeU.S. Bureau of Labor Statistics
Source: U.S. Bureau of Labor Statistics|United States|2025—2035|Other managers parent group employment change; Editorial conversion: Cites directly the 2025—2035 other managers parent group employment change of 4.9%, not independent for this occupation or AI causality.
Parent group 1,338,800 peopleOther managers parent group 2025 employmentU.S. Bureau of Labor Statistics
Source: U.S. Bureau of Labor Statistics|United States|2025|Other managers parent group employment size; Editorial conversion: The official 2025 parent group 1338.8 thousand times 1000 is 1,338,800 people, not an independent wind development size.
Parent group 100,900 per yearOther managers parent group 2025—2035 annual average openingsU.S. Bureau of Labor Statistics
Source: U.S. Bureau of Labor Statistics|United States|2025—2035|Other managers parent group annual average openings; Editorial conversion: The official 2025—2035 parent group annual average 100.9 thousand openings times 1000 is 100,900, and openings are not net growth.
No data availableMainland China salary reference

Quick judgment

What should wind power development experience first?

Paper check | If the interconnection milestone is unconfirmed but the plan says construction can start, record the dependency, owner and affected date for the project lead. This occupation 11-9199.10 focuses on opportunity development and evaluation and may manage construction; operations managers .09 manage wind farm operation, wind energy engineers focus on design, and the title does not stand in for authority.

Paper exercises do not verify wind resources, real returns, project feasibility, or personal signing authority.

What kind of people are more likely to suit wind energy development managers?

Willing to check project resources, budgets, documents, and schedule conditions and to keep communicating with the team, consultants, and external parties; liking renewable energy cannot replace development document work.Willing to read preliminary documents and distinguish research, proposal, application, and formal decision; able to explain the basis of a budget estimate and coordinate unconfirmed conditions.

In what situations should you choose wind energy development managers carefully?

Project investment and power generation revenue are not personal wages; region, travel, pay structure, and specific duties are confirmed by the actual job.If you treat a draft as an approval, a planned date as a reply date, or look only at the total without checking each package's conditions, practice identifying document status first; a policy concept cannot replace a specific approval.

How can one small experiment show whether you suit wind energy development managers?

Use the fictional A/B/C work packages to recalculate 19 ten-thousand yuan and the original amount difference of 2, identify the environment draft and the missing grid connection reply date, and do not submit a real permit or make an investment decision.Recalculate that C should be 4 rather than 6, with a total of 19 ten-thousand yuan; keep B unconfirmed, the environment draft, and the grid connection date unknown, write the three items and budget conditions, then investigate one development job.

Career profile

Wind development managers coordinate project plans, resource assessment, land use, interconnection, budget and schedule. They prepare the dependencies and approvals for project decisions. When reviewing a job, ask who checks the work or records and which tasks require separate authorization.

Structured notes on the occupational profile

Diagram of opportunity development and plan and budget coordination

The following is an editorial task breakdown; the project's actual sequence, responsible parties, and authority must be confirmed for the specific project.

Opportunity evaluation and preliminary documents:

Opportunity evaluation, proposals, and unconfirmed conditions

  1. 01Check resource clues
  2. 02set the evaluation scope
  3. 03check environmental conditions
  4. 04organize the proposal
  5. 05keep unknowns
  6. 06check the application status

Planning, budget, and construction coordination:

Plan budget, service scope, and status brief

  1. 01Set the scope and tasks
  2. 02check the cost basis
  3. 03arrange schedule conditions
  4. 04check consultants and subcontractors
  5. 05track status
  6. 06report changes
Shared basisProject scope · research basis · version status · cost conditions · schedule dependencies · party authority

How are opportunity evaluation and project coordination divided?

This occupation leads or manages the development and evaluation of wind energy business opportunities, including environmental studies, permits, and proposals, and may manage project construction; operation and maintenance are not automatically treated as this occupation's main tasks. The former judges which studies and preliminary conditions an opportunity needs, and the latter organizes plans, costs, and collaboration. A feasible evaluation suggestion is not an approved investment, and document submission is not a granted permit.

DimensionMain directionsComparison directions
Core purposeIdentify opportunities and preliminary conditions.Organize plans, costs, and collaboration.
Input documentsResources, environment, and permit requirements.Scope of work, quotes, and schedule.
Checking processKeep the research assumptions and material status.Recalculate costs and check dependencies.
Main outputProposals and unconfirmed items.Status reports and the basis for changes.
Job responsibilitySuggestions must point back to the research basis.Approval and signing follow the real party.
Collaboration partnersEnvironmental studies and external parties.Consultants, subcontractors, engineering, and owners.
Judgment boundaryEvaluation does not prove feasibility or returns.A plan does not fill in an approval reply.

Core work

  1. 01

    Coordinate or direct development, energy assessment, engineering, or construction activities to ensure that wind project needs and objectives are met.

  2. 02

    Manage wind project costs to stay within budget limits.

  3. 03

    Lead or support negotiations involving tax agreements or abatements, power purchase agreements, land use, or interconnection agreements.

  4. 04

    Create wind energy project plans, including project scope, goals, tasks, resources, schedules, costs, contingencies, or other project information.

What should be checked first in a project status brief?

Check scope, cost, document version, and schedule dependencies and separate confirmed, estimated, and unknown items, and do not treat a plan or draft as a formal decision.

  1. 01

    How are project cost, budget, and schedule updated?

    Manage project costs and update budget estimates and schedules; a cost suggestion is not an approved investment, and unconfirmed quotes must keep their conditions.

  2. 02

    How are the development scope, objectives, and resources coordinated?

    Coordinate development, energy assessment, engineering, and construction activities and set scope, objectives, resources, schedule, cost, and preliminary arrangements; input research and plans must keep versions and assumptions.

  3. 03

    How are the consultant service scope and quality checked?

    Define the scope of design, site assessment, environmental studies, and measurement services and supervise consultants and subcontractors for quality, specification, and budget compliance.

  4. 04

    Can the budget of 19 ten-thousand yuan be written as approved?

    No. The 19 is only the problem's recalculation, the B7 ten-thousand is unconfirmed, and the budget ceiling of 20 does not mean approval; a real investment still needs confirmation by the actual party.

  5. 05

    Can the blank grid connection date be filled with D8?

    No. D8 is only an internal planning marker in this problem and no reply date is given, so it is kept as to be checked; dates in other documents cannot stand in for the grid connection reply.

  6. 06

    How are education, experience, and preparation conditions divided?

    The O*NET job Zone4 for this occupation is a general preparation background; the BLS bachelor and less than 5 years of related experience are typical 11-9199 parent group conditions, and the two Chinese development jobs each apply.

Wind project preliminary documents and construction coordination

This occupation connects opportunities, research, permit documents, and project plans and may manage construction; daily wind farm operation and turbine repair are separated separately.Report status to the team, management, subcontractors, clients, and owners and evaluate bids and prepare construction or equipment RFPs; communication cannot fill in an approval that does not yet exist.

Location and environment
The O*NET U.S. survey includes indoor work and contact and also site assessment coordination tasks; both Chinese development jobs mention long-term travel, and the location is checked job by job.
Tools and documents
Resource and environment studies, diagrammatic layouts, proposals, agreements, RFPs, budgets, and schedules; GIS/CAD/project management software is not the same as actual generative AI adoption.
Task organization
Lead or support negotiation of tax, power purchase, land use, and grid connection agreements; term suggestions and the real approval and signing of each party are checked separately.The editorial workflow first checks scope and research needs, then cost, schedule, and material status; the actual development and construction sequence follows project conditions and no uniform national sequence is set.
Hours and travel
The O*NET survey for this occupation includes more than 40 hours, which is not a uniform Chinese schedule; the long-term travel requirements in the two announcements apply respectively, and costs and arrangements are checked separately.
Collaboration and reporting lines
Prepare or assist with environmental, building, and other permit applications and review technical documents and proposals; submitting material does not mean the administrative permit is granted.Coordinate with engineering and environmental consultants, subcontractor teams, owners, and external parties; development suggestions, technical responsibility, permit decisions, and signing parties are confirmed separately.
Review and responsibility
Reports state the version, assumptions, changes, and unconfirmed items, and technical documents and applications require checking the actual party; conclusions cannot be signed on behalf of a consultant or approval authority.
Quality focus
Scope, cost, and status can be traced back to a basis, and missing items are reported promptly; this page does not measure real wind resources, power generation returns, or construction and electrical competence.

Basis for development managers and scope of use

O*NET11-9199.10BLS11-9199 other managers parent groupTwo mixed development job announcementsNEA power generation enterprise permit materialO*NET development tasks and authority boundaries
O*NET11-9199.10
11-9199.10 opportunity evaluation, planning, budgets, permit documents, and EC.
BLS11-9199 other managers parent group
11-9199 other managers parent group employment and typical preparation, not independent for this occupation.
Two mixed development job announcements
The Sichuan Energy Investment development specialist and the Kunneng development manager, both mixing wind and photovoltaic.
NEA power generation enterprise permit material
The boundary of Chinese power generation business license material and the enterprise applicant.
O*NET development tasks and authority boundaries
O*NET development coordination and application tasks; does not grant design, site work, or administrative approval authority.

Career direction comparison

How to choose between development, operations, and related management?

Within this occupation, separate opportunity evaluation from plan coordination, and also compare corporate sustainability strategy, geothermal, biofuels, and biomass power plant operation; the same energy industry does not mean the same duties.

Comparison of career directions, work outputs, and selection conditions
Career directionCore work and outputKey differenceWhich choice fits better
Opportunity evaluation and preliminary documentsCheck the research scope and proposal.A suggestion does not prove feasibility and returns.Willing to check the basis and keep unknowns.
Plan budget and construction coordinationCheck cost, schedule, and consultant services.Coordination does not stand in for technical approval authority.Willing to recalculate and keep communicating.
Chief Sustainability OfficersCoordinate parties on sustainability issues and set or supervise corporate sustainability strategy.Focuses on corporate strategy rather than a single wind development project.Willing to add corporate strategy and multi-party issue coordination.
Geothermal Production ManagersManage geothermal power facility operation and maintain monitoring equipment to support safety and efficiency.The energy object shifts to geothermal and the focus shifts to plant operation.Willing to add geothermal operation and equipment knowledge.
Biofuels Production ManagersManage biofuel production operations, handle performance data, and design corrective procedures.The object shifts to biofuel production, not wind preliminary development.Willing to add production processes and anomaly correction.
Biomass Power Plant ManagersManage biomass power plant operations and supervise operations and maintenance staff.The object shifts to a biomass power plant and the focus shifts to operations and maintenance.Willing to add fuel equipment and operations management.

How to choose

First experience project documents and cost status; if you lean toward operations or production, check the target equipment process and management responsibility, and development years do not automatically transfer you.

After checking the object and output, separate digital tool capability, actual adoption, and employment statistics.

AI's impact on the occupation

How should project software be distinguished from text AI?

An approved tool can organize a draft handoff from fictional inputs. Check original values, revisions and open items, then refer the draft to the person authorized to review it. Example: If the interconnection milestone is unconfirmed but the plan says construction can start, record the dependency, owner and affected date for the project lead.

AI assessment method and sources

FermatMind AI Impact Score estimation method v1

FermatMind / 费马测试 · 2026-10-18

  • Model impact index for three equally weighted representative core tasks; not a measured share of working time or a job-loss probability. floor((50+75+25)/3+0.5)=50; fermatmind-ai-impact-v1; 2026-10-18.
  • Anchors: 0 negligible; 25 preparation or record assistance; 50 substantial assistance; 75 most information output can be formed by AI with review; 100 almost all of the selected task can be done by AI and independently verified.
  • Development|Opportunity and resource evaluation|Coordinate energy assessment and preliminary studies and keep the basis and assumptions. — 50/100; weight=1/3
  • Planning|Scope, resources, schedule|Prepare objectives, tasks, resources, costs, and preliminary arrangements. — 75/100; weight=1/3
  • Collaboration|Consultants, subcontractors, and agreements|Check service quality and budget and land, power purchase, and grid connection conditions. — 25/100; weight=1/3

Editorial ratings use the existing occupational responsibilities and AI task analysis on this page. They are not adoption rates, measured effects, job-disappearance or personal-unemployment probabilities, or official scores from Stanford or another external institution. No measured time weights or future robot deployment are assumed.

Technical capability: whether cost status can be checked back

At the capability level, scope, cost, and status can be extracted from approved project documents to generate a brief draft; it must be checked back against the original for version, units, and unknowns, and this is an editorial suggestion rather than a measured time saving.

Actual adoption: the specific unit and functions

Insufficient evidence: no independent generative AI adoption rate, score, net time saving, or replacement rate for 11-9199.10 was obtained; other managers parent group projections cannot fill them in.

Employment outcome: parent group period and scope

At the employment level, the BLS11-9199 parent group grows 4.9% from 2025—2035 with 100,900 annual average openings, covering other managers and not independent for this occupation, and it is not broken into AI causality.

Task impact matrix

Comparison of occupational task exposure to artificial intelligence
Work directionTaskCurrent changesHuman control points
Opportunity researchOrganize resource and environment cluesEditorial draft suggestionResearch assumptions must not become verified feasibility.
Plan scopeList work packages and dependenciesEditorial organizing suggestionKeep an unconfirmed reply date unknown.
Budget checkingExtract unit price, quantity, and totalEditorial recalculation suggestion2 items × 2 ten-thousand yuan should be 4, and the original 6 differs by 2.
Permit documentsDistinguish draft, application, and decisionEditorial field organizingSubmission is not a granted permit.
Service procurementList consultant RFP comparisonDigital task backgroundSpecification, quote, quality, and authorization are checked separately.
Project softwareSeparate CAD/GIS/scheduling from AIO*NET tool backgroundFunctions and actual adoption are checked separately.
Employment judgmentRead other managers parent group dataOfficial parent group statistics4.9% is not AI causality for this occupation.

Why do employment evidence sources reach different conclusions?

The five bases are this occupation's tasks, the NIST method, the software background, the parent group projection, and output review; repeating the same source does not count as an independent experiment.

O*NET: Wind Energy Development Managers 11-9199.10

View source ↗
Study subject
Wind opportunity development tasks
Main conclusions
This occupation's tasks and general frameworks support analysis scope, and paper assistance is editorial exploration; there is no evidence of independent adoption effects or technology-driven employment change.
Usage limits
Does not measure this occupation's AI adoption or time savings.

Why are different work directions affected differently?

O*NET lists CAD, GIS, project management, ERP, and spreadsheet tools, indicating a software task background; scheduling software and generative AI are checked separately, and adoption rates are not inferred from a software name.

Opportunity evaluation

What AI mainly changesCan organize research conditions

Still the person's responsibilityReturn to the original resource and environment basis and keep the assumptions.

Budget coordination

What AI mainly changesCan form a cost draft

Still the person's responsibilityRecalculate package by package and mark unconfirmed quotes.

Permit status

What AI mainly changesCan list material and missing items

Still the person's responsibilityDoes not invent approvals or stand in for administrative decisions.

Once AI enters professional workflows, the chain of responsibility cannot break

Use only the A/B/C fictional work packages to recalculate 4 and 19 ten-thousand yuan and check the draft and blank dates; do not upload a real project or apply for a permit.

  1. Define the task

    Check only the A/B/C fictional budget status.

  2. Keep the input

    Keep the original quantities, unit prices, amounts, and document status.

  3. Check the output

    Independently calculate 4 and 19 ten-thousand yuan and keep the conditions.

  4. Manual confirmation

    Technical, permit, and investment matters are checked by the actual party.

  5. Record the version

    Keep the reasons for changes, unknowns, and the paper use.

Professional risks of using AI

Budget miscalculation

The original C6 without checking 2 items × 2

Control method:Should be 4 ten-thousand with a difference of 2, and the total 19 with B's conditions noted.

Status invented

The environment draft becomes approved

Control method:Return to the original document status and do not fill in an approval that was not given.

Date fabricated

The blank grid connection date is filled with the planned D8

Control method:Keep it unknown and do not claim the schedule is confirmed.

Prediction overstated

A suggestion is written as guaranteed feasibility and returns

Control method:Keep the research basis and the actual decision separate.

Data and authority distorted

A real project is disclosed or a draft poses as a signature

Control method:Check by unit data authorization and the real party.

How should different groups respond?

Career explorer

Check the fictional budget and status, keep unknowns, and do not submit a real application.

Development management staff

Check scope, research, cost, and dependencies and keep the actual replies and changes.

Engineering and environment collaborators

Confirm technical documents and actual versions and distinguish suggestions from formal decisions.

Unit leaders

Check data use and approval and signing authority and do not presume AI time savings or gains.

Common questions about AI and career development

Development staff keep the input and status, engineering and environment staff check the technical basis, and the authorized party approves and signs; the tool cannot invent a supervisor's reply or project conditions.

Mainland China salary reference

Chinese development job pay: neither announcement disclosed wages

Two mixed development jobs and the wage gap

Announcements without wages and statistical boundaries

No national distribution for this occupation in China was obtained

China's precise occupation national wage gap

Insufficient evidence: no national Chinese wage distribution for wind energy development managers was obtained, neither employer's development job disclosed wages, and project amounts or the U.S. parent group are not used to fill it in.

Sichuan Energy Investment development specialist wage gap

The Sichuan Energy Investment new energy project development specialist's wage is not disclosed; project amounts or other job quotes cannot fill it in.;2 employers and 2 development jobs, the Sichuan Energy Investment attachment is a 2025 recruitment and Kunneng published 2025-03-01; both mix wind and photovoltaic, and a historical announcement does not mean a current opening.

Kunneng development manager wage gap

Insufficient evidence: the two jobs' wages and bonuses, taxes, and hours were not disclosed, so no Chinese national wage percentile for this occupation can be formed.

Source: National Bureau of Statistics|China|Consulted 2026-10-01|Scope of the Chinese wage evidence; Editorial conversion: Neither mixed development job disclosed wages, and national industry averages, other jobs, or the U.S. parent group are not used to fill them in.

Can the two announcements estimate personal income?

A historical announcement is not proof of a current opening

Two mixed development jobs and the wage gap
Project and job scopeEducation, experience, and wage conditionsApplicable scope and gap
Sichuan Energy Investment development specialistBachelor in a related major and at least 3 years of development experience.Sichuan Energy Investment development specialist, 1 person, bachelor in a related major, at least 3 years of development experience, age 45 or below, and able to travel long term; not a separate wind manager wage.
Kunneng development managerCollege diploma or above, with sales or photovoltaic experience preferred.Kunneng development manager (photovoltaic, wind), college diploma or above, sales or photovoltaic development experience preferred, and able to travel long term; the job's wage is not disclosed.
Wage structureNeither announcement gave an independent wage.Check the actual project object, region and travel, base pay and bonuses, paid hours, and costs, and do not infer a guaranteed take-home amount from a job title.
National precise distributionPay differences cannot be estimated from education differences.Insufficient evidence: two mixed development jobs are not enough to estimate national, regional, or education pay differences, and neighboring job quotes are not applied.

Insufficient evidence: the two jobs' wages, bonuses, taxes, paid hours, and development manager self-employed net income were not checked; project scale or total contract value cannot be used to estimate personal income.

Check the three duty industry backgrounds by employer

Electricity supply industry: power generation enterprise development background

For wind opportunity development and preliminary coordination at a power generation enterprise, the electricity, heat, gas, and water production and supply industry can be referenced: 2025 non-private pre-tax annual average 160,897 yuan and private 66,451 yuan. The industry-wide employed person average is not a development manager median or starting salary; the wages of the Sichuan Energy Investment and Kunneng mixed development jobs are still not disclosed.

Scientific research and technical services: when employed for research and consulting

If employed by a technical service unit organizing site, environmental studies, and development consulting, the scientific research and technical services industry can be referenced: 2025 non-private pre-tax annual average 182,064 yuan and private 83,560 yuan. Check the actual industry of the employer; managing external consultants does not automatically place the job in this industry, and the average does not represent a wind manager's wage.

Construction: when managing construction at a construction enterprise

When managing wind project construction at a construction enterprise, the construction industry can be referenced: 2025 non-private pre-tax annual average 92,036 yuan and private 66,275 yuan. Construction coordination alone does not prove the employer belongs to construction; the three industries are checked by the unit's main business and duties, and investment, contract value, and power generation revenue are not personal pay.

Can AI explain development job wage changes?

Insufficient evidence: no figure was obtained for AI independently changing Chinese wind energy development manager wages, and digital software and generative AI cannot be mixed as a basis for pay cuts.

U.S. salary reference

U.S. other managers parent group: not an independent statistic for wind development

Insufficient evidence: no independent wage distribution for 11-9199.10 was obtained; O*NET states explicitly that the 2025 median of 141,900 USD/year and 68.22 USD/hour come from the 11-9199 other managers parent group.

11-9199 other managers parent group 2025 five national wage percentiles

11-9199 other managers parent group 2025 five national wage percentiles
2025 other managers parent group positionOfficial annual value (USD)Statistical scopeHow to understand
Parent group 2025 10th percentileParent group $74,300/year11-9199 other managers not listed separately parent group 2025 national employee annual wages; not independent for wind development, base pay, or after-taxThe 2025 other managers parent group 10th percentile annual wage is 74,300 USD, not a wind development newcomer's starting salary, base pay, or minimum guarantee.
Parent group 2025 medianParent group $141,900/year11-9199 other managers not listed separately parent group 2025 national employee annual wages; not independent for wind development, base pay, or after-tax2025 parent group national annual percentiles 74,300/102,880/141,900/186,300/238,270 USD; hourly 35.72/49.46/68.22/89.57/114.55. Covers all managers not listed separately and is not independent for wind development, a grade, or personal income.
Parent group 2025 90th percentileParent group $238,270/year11-9199 other managers not listed separately parent group 2025 national employee annual wages; not independent for wind development, base pay, or after-taxThe 2025 other managers parent group 90th percentile annual wage is 238,270 USD, not a wind development seniority grade, and it does not guarantee personal bonuses.

2025 other managers parent group|Salary · 10th percentile:Parent group $74,300/year;U.S. May 2025 11-9199 other managers not listed separately parent group national employee percentiles, not independent for wind development, a starting salary, or a grade.

2025 other managers parent group|Salary · 25th percentile:Parent group $102,880/year;U.S. May 2025 11-9199 other managers not listed separately parent group national employee percentiles, not independent for wind development, a starting salary, or a grade.

2025 other managers parent group|Salary · median:Parent group $141,900/year;U.S. May 2025 11-9199 other managers not listed separately parent group national employee percentiles, not independent for wind development, a starting salary, or a grade.

2025 other managers parent group|Salary · 75th percentile:Parent group $186,300/year;U.S. May 2025 11-9199 other managers not listed separately parent group national employee percentiles, not independent for wind development, a starting salary, or a grade.

2025 other managers parent group|Salary · 90th percentile:Parent group $238,270/year;U.S. May 2025 11-9199 other managers not listed separately parent group national employee percentiles, not independent for wind development, a starting salary, or a grade.

Source: U.S. Department of Labor, O*NET / BLS|United States|May 2025|11-9199 parent group 10th percentile annual wage; Editorial conversion: Cites directly the 2025 U.S. other managers not listed separately parent group national employee percentiles, not independent for wind development, a grade, or guaranteed income. · Source: U.S. Bureau of Labor Statistics|United States|2025|11-9199 parent group median wage; Editorial conversion: Cites directly the 2025 other managers parent group official annual median wage, not an independent wind development wage or after-tax income. · Source: U.S. Department of Labor, O*NET / BLS|United States|May 2025|11-9199 parent group 90th percentile annual wage; Editorial conversion: Cites directly the 2025 U.S. other managers not listed separately parent group national employee percentiles, not independent for wind development, a grade, or guaranteed income.

How are percentiles, manager grade, and personal contract divided?

Can the broad parent group infer this occupation's demand?

Insufficient evidence: no independent projection for this occupation was obtained; the 11-9199 parent group goes from 1,338,800 to 1,404,400 in 2025—2035, with a net 65,600 people, 4.9%, and 100,900 annual average openings.

Does an industry average equal a personal quote?

The 2023 parent group industry averages are other managers employed in specific industries, not this occupation's industry wage, a national median, or 2025, and project power generation revenue is not treated as wages.

Does a high percentile mean a senior manager?

The percentile is the 2025 other managers parent group employee distribution and is not equal to a wind development grade, years of service, or personal contract; the broad parent group covers all managers not listed separately.

How are project cost and personal wages divided?

The personal contract, bonuses, and costs are checked separately, project investment and power generation revenue are not directly equal to wages, and statistical annualization is not a guarantee of personal paid hours.

2023 parent group industry annual average wages

2023 parent group industry annual average wages
Industry2023 parent group industry averages (USD) / statusHow to understand
Government specified scope|other managersHistorical parent group mean $144,260/yearIn 2023 government (excluding certain schools, hospitals, and postal services), the other managers annual average wage is 144,260 USD, not wind for this occupation or 2025.
Corporate and enterprise management|other managersHistorical parent group mean $170,030/yearIn 2023 corporate and enterprise management, the other managers annual average wage is 170,030 USD, not a national median or independent for this occupation.
Management, scientific, and technical consulting|other managersHistorical parent group mean $173,100/yearIn 2023 management, scientific, and technical consulting services, the other managers annual average wage is 173,100 USD, not a separate wind development wage.
Self-employed (separate note)Statistics exclude the self-employedInsufficient evidence: self-employed net income for this occupation was not checked, and employee wages and the broad parent group's 50.4% self-employed share cannot fill it in.
Source: U.S. Bureau of Labor Statistics|United States|May 2023|Other managers industry annual average wage in the government specified scope; Editorial conversion: Cites directly the 2023 other managers annual average wage in the government specified scope, not independent for this occupation or 2025. · Source: U.S. Bureau of Labor Statistics|United States|May 2023|Other managers annual average wage in corporate and enterprise management; Editorial conversion: Cites directly the 2023 other managers annual average wage in corporate and enterprise management, not this occupation's national median. · Source: U.S. Bureau of Labor Statistics|United States|May 2023|Other managers annual average wage in management, scientific, and technical consulting; Editorial conversion: Cites directly the 2023 other managers annual average wage in management, scientific, and technical consulting, not independent for wind development.

Personal quotes and conditions are checked separately

Available paid work

Actual paid hours, bonuses, and costs are checked against the contract, and annualized statistics do not guarantee 2080 hours or an after-tax take-home amount.

Task scope and pay basis

11-9199 is other managers not listed separately, and O*NET states explicitly that the wage, employment, and industry on this page are that parent group; the broad parent group cannot be equated with wind managers.

Workplace and living arrangements

This occupation's tasks and the Chinese mixed development jobs' location and travel conditions are checked separately, and U.S. statistics do not define a uniform Chinese schedule or entry.

11-9199 parent group 2025—2035 projection

Other managers parent group|2025–2035 employment · base-period headcount

Parent group 1,338,800 people

11-9199 broad parent group 2025—2035, thousands multiplied by 1000, not independent for this occupation; openings are not net growth.

Source: U.S. Bureau of Labor Statistics|United States|2025|Other managers parent group employment size; Editorial conversion: The official 2025 parent group 1338.8 thousand times 1000 is 1,338,800 people, not an independent wind development size.

Other managers parent group|2025–2035 employment · growth projection

Parent group 4.9%

11-9199 broad parent group 2025—2035, thousands multiplied by 1000, not independent for this occupation; openings are not net growth.

Source: U.S. Bureau of Labor Statistics|United States|2025—2035|Other managers parent group employment change; Editorial conversion: Cites directly the 2025—2035 other managers parent group employment change of 4.9%, not independent for this occupation or AI causality.

Other managers parent group|2025–2035 employment · annual average openings

Parent group 100,900 per year

11-9199 broad parent group 2025—2035, thousands multiplied by 1000, not independent for this occupation; openings are not net growth.

Source: U.S. Bureau of Labor Statistics|United States|2025—2035|Other managers parent group annual average openings; Editorial conversion: The official 2025—2035 parent group annual average 100.9 thousand openings times 1000 is 100,900, and openings are not net growth.

Career fit guide

Which behaviors should development management fit observe?

Insufficient evidence: no evidence was obtained that personality or general test thresholds predict hiring for this occupation; the editorial observation covers document review, budget conditions, and clarifying unknowns.After the experience, record the miscalculation steps, document status, and willingness to clarify unknowns, and choose one project fundamentals training or real job investigation, without calling it a real development record.

Worth experiencing further: See whether you are willing to read project documents, recalculate budgets, and keep unknowns; these are editorial observations and cannot judge wind manager talent or set a hiring score.

Check the real conditions first: Insufficient evidence: the two mixed development jobs did not disclose personal wages, so Chinese income expectations cannot be estimated from project scale, interest, or the U.S. parent group. Renewable energy interest and personal income budget are kept separate, project scale and returns are not pay, and the undisclosed wages in the two announcements cannot be self-estimated.

Try a small experience first: Independently check C4 ten-thousand and the total 19, keep B unconfirmed, the environment draft, and the grid connection date unknown, record the reasons for changes, and do not handle a real project.

Do not let one test decide your career for you

Holland occupational interests (RIASEC)

Occupational activity interest clues

Can EC prove that I can develop wind power?

EC suggests a preference for management communication and procedural documents; first see whether you are willing to check budgets and document status, since interest does not guarantee project judgment or management performance.

  • Willing to check documents and unconfirmed conditions.
  • Willing to clarify status and keep coordinating.

Do not use it this way:Interest is not the same as project qualification or approval authority.

Understand my career interests

Big Five personality: document preparation

Editorial behavior observation

How can reliable project preparation be observed?

See whether scope, cost, documents, and date original values are kept and conditions preserved after recalculation, and do not set a uniform manager pass line from a personality score.

  • Check that C should be 4 ten-thousand rather than 6.
  • Write unconfirmed B as not formally approved.

Do not use it this way:Both development jobs mention long-term travel and the specific region, costs, and hours need checking; living constraints are not a character flaw, and the target may be adjusted truthfully.

Understand my Big Five traits

MBTI: analysis and coordination

Preference discussion, not hiring ranking

Are introverts unsuited to being development managers?

Independent analysis, listening to technical opinions, and external coordination are observed separately, and a four-letter type cannot replace research training or real communication feedback.

  • Can independently recalculate the work package.
  • Can ask clearly about the missing grid connection date.

Do not use it this way:Project management returns cannot be inferred from a type.

Understand my personality preferences

Enneagram: energy interest and motivation

Editorial motivation reflection

Does liking wind power mean liking development work?

Separate energy interest, business coordination, and document responsibility and observe whether you are willing to check budgets and status repeatedly, since a label cannot replace job experience.

  • State clearly which documents you are willing to keep checking.
  • Do not invent approvals to show progress.

Do not use it this way:Do not guess the psychology of supervisors and consultants.

Understand my motivation clues

Cognitive ability and budget recalculation

Specific problem observation

How should document quantity preparation be observed?

Check that C2 items × 2 ten-thousand = 4, and the original 6 differs by 2; the provisional total 19 still includes unconfirmed B. One problem performance is not a cognitive score or real competence.

  • Check the quantity, unit price, and ten-thousand yuan.
  • Distinguish the budget ceiling from approval.

Do not use it this way:Locate a wrong calculation to the step and do not infer overall ability.

Understand my cognitive performance

Emotion and project feedback

Editorial communication observation

What should you do when the schedule is pressed but the reply is unknown?

Separate the plan, material status, and formal reply and clarify missing items and responsible parties; respecting collaborators is not the same as inventing a reply.

  • Ask specifically about the document version and status.
  • Keep the unconfirmed date and cost.

Do not use it this way:Research and technical documents are handled per unit scope and usage authorization, and the exercise uses only fictional work packages; paper does not sign contracts, apply for permits, or direct the site.

Understand my communication clues

Which work direction are you more likely to suit?

Common questions about career fit

Do you still need to check documents after memorizing a plan?

Memorizing a planned date still requires checking the formal document, D8 is an internal marker, and the grid connection reply date is blank; memory cannot fill in an approval or promise.

How should vague project feedback be handled?

When feedback is vague, first locate the scope, cost, document status, or dependency and ask specifically what is missing before returning to the basis, and do not fill in replies to make the plan look complete.

How should you review a proposal or job that was not obtained?

If no job is obtained or a proposal is not selected, first check your own preparation, available feedback, and actual conditions; keep unknown causes unknown and do not guess project decisions from personality.

Does liking energy make you suited to development?

You also need to experience resource and environment documents, budgets, permit status, and repeated coordination, and energy interest does not cover the whole process.

Does coordination always require being very extraverted?

See whether you listen carefully to needs, check facts, and ask clearly about conditions; extraversion cannot replace document judgment and a sense of responsibility.

Can it be approved if the budget is below 20 ten-thousand?

No. The 19 is only the problem's recalculation, B's quote is unconfirmed, and approval and the actual project conditions are not given, so it cannot be claimed to be approved or constructible.

What if long-term travel does not suit you?

Check the real region, costs, and your own arrangements, and you may adjust the target; living conditions are not called a character flaw.

How can I get an experience without a project?

Use the fictional A/B/C paper budget and status problem, keep the unknowns, and do not apply for a permit, sign a contract, or do site work.

What if the test and exercise performance disagree?

Return to the units, formula, document status, and blank dates to locate the step; a test is only a clue, and actual missing items should not be ignored to fit a label.

How should the next step be chosen after the experience?

Choose one project budget or document fundamentals training, or check one real development job's conditions; a correct paper calculation does not guarantee hiring or an investment judgment.

Work pressure, risks, and occupational boundaries

How should development document, permit, and responsibility risks be checked?

First check resource research, cost, document status, and schedule dependencies, then check the permit party and business authority. A correct budget does not mean the project is constructible or approved.

O*NET supports the development tasks, the NEA power generation permit text supports the boundary of enterprise application material, and NIST is a general output risk method; none provides this occupation's accident rate or a uniform risk score.

01

Research and feasibility conclusions conflated

Typical scenario:Writing a clue or proposal as verified resources and feasibility.

Main positions:People organizing resource and environment assessment

Possible consequences:Investment and development judgments lose their actual basis.

Reduce risk:Keep the research source version and assumptions, and technical and environmental conditions are checked by the actual party; this page's problem does not verify wind resources or project returns.

Basis:O*NET: Wind Energy Development Managers 11-9199.10 · Kunneng: development manager (photovoltaic, wind)

02

Schedule conditions and site authority conflated

Typical scenario:An unknown grid connection reply is filled with D8, and coordination is treated as site work authorization.

Main positions:Planning and construction coordination staff

Possible consequences:A schedule promise has no basis or the duties exceed scope.

Reduce risk:Keep dependencies and unknown dates and check formal replies separately; plan coordination does not automatically grant electrical, work-at-height, or engineering design authority.

Basis:O*NET: Wind Energy Development Managers 11-9199.10 · NIST AI RMF1.0

03

Project scale and personal income mixed

Typical scenario:Treating investment and power generation revenue as personal wages and applying neighboring job quotes to this job.

Main positions:People comparing development job pay

Possible consequences:Income expectations deviate from the real contract.

Reduce risk:Check this job's base pay, bonuses, costs, and paid hours; the two announcements have no pay data, and parent group wages and project income cannot stand in for a Chinese personal take-home amount.

Basis:Sichuan Energy Investment: 2025 new energy project development specialist · Kunneng: development manager (photovoltaic, wind)

04

Enterprise permits and personal certificates conflated

Typical scenario:An enterprise power generation business permit is treated as a personal manager certificate, and a draft states an approval.

Main positions:Development and application document staff

Possible consequences:The responsible party and material status are distorted.

Reduce risk:Chinese power generation permit texts apply to enterprise applicants and related conditions and are not an individual development manager qualification; whether a specific project applies and other formalities are checked separately, and it is not claimed that all wind power is permit-free.

Basis:National Energy Administration: power business license notification and commitment letter (power generation) · O*NET: Wind Energy Development Managers 11-9199.10

05

Technical document use and signing beyond scope

Typical scenario:Approved reading is treated as disclosure or as signing a conclusion for the technical party.

Main positions:People organizing research, technical, and agreement documents

Possible consequences:Project document flow or technical responsibility exceeds authority.

Reduce risk:Check per unit data use and signing scope, and the NIST risk method does not grant disclosure authority; development coordination, engineering technology, and administrative decisions are each the responsibility of the actual party.

Basis:O*NET: Wind Energy Development Managers 11-9199.10 · NIST AI RMF1.0

06

Budget and status changes not traceable

Typical scenario:The original C6 is not recalculated, and unconfirmed B or the environment draft is written as passed.

Main positions:Project reporting and cost coordination staff

Possible consequences:Cost and schedule conclusions become hard to trace to the original basis.

Reduce risk:Keep C's original 6, the should-be 4 with a difference of 2, and the total 19 with B's conditions; the environment draft has no approval, the grid connection date is unknown, and changes and real replies are recorded separately.

Basis:O*NET: Wind Energy Development Managers 11-9199.10 · NIST AI RMF1.0

Entry, certification, and career development

How to prepare for wind project development

Start with project scope, research basis, cost units, and document status, and the paper only observes preparation; real wind resource assessment, technical, and permit responsibility need the corresponding training.

First check scope, budget, status, and duties

Recruitment sample and limits

Project documents, budgets, and development job preparation

Entry directionWhat you mainly do at firstEmployer requirements and observation basisHow to prove it without experienceDifference from other directions
Paper status experienceRecalculate the budget and identify drafts and unknowns.An original editorial problem on this page.C4 total 19 and the three items.Not real development or an entry exam.
Project fundamentals trainingLearn scope, research, and cost.O*NET tasks for this occupation.Your own course and feedback.Paper does not prove real resources or returns.
Coordination process trainingLearn the application service scope and status.The actual unit process.Supervised document checking.An application does not stand in for approval and signing.
Sichuan Energy Investment development specialistWind and photovoltaic development and market expansion.Bachelor in a related major and at least 3 years of experience.State your real preparation truthfully.A mixed specialist job, not a precise manager role.
Kunneng development managerResource scheme proposals and feasibility study organization.College diploma or above with experience preferred.Your own document and communication experience.The mixed development job's wage is not disclosed.

Basis for the Sichuan Energy Investment and Kunneng development jobs

Sichuan Energy Investment development specialist

2025 recruitment, 1 person, bachelor in a related major, at least 3 years of development experience, age 45 or below, wind and photovoltaic development, able to travel long term.

Kunneng development manager

2025-03-01 photovoltaic and wind mixed development, college diploma or above, sales or photovoltaic development experience preferred, resource schemes, proposals, feasibility studies, and long-term travel.

Editorial suggestion: your own participation

Keep the budget recalculation, status identification, and unknown handling process and note that it is fictional with no permit application or real development.

Editorial suggestion: actual arrangements

Check the region, travel costs, wage structure, project scope, and responsible party; do not apply the same page's operations certificates or claim it is still hiring.

Fictional budget and status brief work piece

Budget basis

C2 items × 2 ten-thousand = 4, and the original 6 differs by 2; A8 + B7 + C4 = 19 ten-thousand, B's quote is unconfirmed, and the total still has conditions.

Document status

The environment file is explicitly a draft with no approval; material preparation must not be written as an approved permit.

Three status handover items

The C amount differs by 2, the environment draft has no approval, and the grid connection reply date is blank; also keep B's quote unconfirmed and D8 as only an internal plan.

Process and use

Keep the original material, formula, changes, and unknowns and note that it is fictional with no application submitted, contract signed, or investment decision made, and do not pose as real development performance.

Source: FermatMind editorial|Editorial suggestion|2026-10-01|local editorial synthesis

Application and formal project training

ScenarioWhat to checkHow to observeCannot be inferred from it
Before applyingCheck the project object, conditions, and travel.Submit your own real preparation.Does not guarantee hiring.
Document experienceRecalculate costs and identify document status.Formula conditions and the three items.Not a uniform employer exam.
Formal trainingLearn research, application, and coordination responsibility.State truthfully what you have learned and what is unknown.The problem does not grant signing or work authority.
Feedback reviewClarify conditions and keep real replies.Change basis and unconfirmed items.A proposal is not investment, permit, or approval.
Source: U.S. Department of Labor, O*NET|United States|2025 task profile; 2025 parent group wages|official reference · Source: FermatMind editorial|Editorial suggestion|2026-10-01|local editorial synthesis

Education, enterprise permits, and personal authority are checked separately

Qualification / preparation itemMainly suits whomReal role in job seekingWhether it is a general entry thresholdRegistration / processing conditionsInvestment considerationsImportant limits
Education and experiencePeople preparing for development management.Add project technical and coordination background.11-9199 parent group bachelor and less than 5 years of experience.Specific Chinese employers are checked separately.Check the course and real feedback.A parent group typical, not a uniform number of years for this occupation.
Project fundamentals coursesPeople needing cost and planning fundamentals.Practice scope, budget, and status.O*NET planning tasks for this occupation.Enroll per the actual course.Check the time, cost, and task scope.A course does not guarantee development returns or hiring.
Permit document trainingPeople involved in application documents.Understand the party conditions and status.NEA power generation permit enterprise material.Check applicability with the actual unit.Learn about the actual materials and responsibilities for retaining them for inspection.Not a personal manager certificate.
Project-specific requirementsTarget region and project party.Check land, environment, and grid connection conditions.Insufficient evidence: not all region-specific formalities were checked.First clarify the project party and region.Check with the corresponding department's specialists.Do not claim all wind power is permit-free.
Technical and site authorityPeople taking on added design or work tasks.Check technical duties and work authorization.Coordination does not automatically grant signing or work authority.The actual unit checks the task.Add the target formal training.Paper does not grant electrical or height authority.
Specific employer conditionsPeople applying for mixed development jobs.Match education, experience, and tasks.The two employers' conditions apply respectively.Check your own conditions and the latest jobs.Address one real gap.A historical announcement does not prove it is still hiring.

Project party, permit, and technical responsibility boundaries

Fictional A/B/C budget and document status

Material|Fictional wind preliminary work packages

Unit ten-thousand yuan, budget ceiling 20: package A resource documents quote 8, confirmed; package B environment documents quote 7, unconfirmed, document status draft, no approval; package C grid connection documents 2 items, each 2, original registered total 6, reply date blank. The problem only recalculates these packages and does not include real wind measurement, design, construction, or taxes.

The internal plan intends D8 to summarize the status, and D8 is only a fictional planning marker, not a grid connection reply or permit promise. A8 and the C unit price and quantity are known in the problem, and B7 is a provisional quote; there are no other documents or replies that were not given.

Your task

Recalculate the C amount, the original value difference, and the provisional total of the three packages, compare with 20, and keep B's unconfirmed condition.

List the three items: C amount difference, environment draft without approval, and missing grid connection reply date. Do not use D8 as the reply date and do not write a total below the ceiling as an approved investment.

Reference approach

C2 × 2 = 4 ten-thousand, and the original 6 is 2 too many; A8 + B7 + C4 = 19, which is 1 below 20. The 19 still includes B's unconfirmed quote and is only the problem's provisional total, not an approved total investment or real return.

The three items are C's original 6 versus the should-be 4 with a difference of 2, B's environment file being a draft with no approval, and C's blank grid connection reply date. Keep B7 unconfirmed and the internal D8 plan, and do not write from this that the environment is approved, the grid connection D8 is settled, or the project is constructible.

Exercise boundaries

Only a fictional paper budget and document status are checked; wind resources and power generation returns are not verified, and no permit is submitted, contract signed, investment made, or site directed.

The work piece keeps the original A/B/C input, formula, conditions, and three items plus the paper use; approvals, reply dates, formal approvals, or a real project record must not be fabricated.

Source: FermatMind editorial|Editorial suggestion|2026-10-01|local editorial synthesis

Seven-day paper project document experience

  1. 01

    Day 1|Check the material

    Read A/B/C and the 20 ten-thousand ceiling and keep the quotes, document status, and blank dates.

  2. 02

    Day 2|Check the single package

    C2 items × 2 = 4 ten-thousand, against the original 6 a difference of 2; keep the original value and do not silently overwrite it.

  3. 03

    Day 3|Check the provisional total

    8+7+4=19, which is 1 below 20; note that B7 is unconfirmed and do not call it approved.

  4. 04

    Day 4|Check the documents

    The B environment draft has no approval; do not write it as an approved permit.

  5. 05

    Day 5|Check the dependencies

    C's grid connection reply date is blank, and the internal D8 plan cannot stand in for a reply; list the three items.

  6. 06

    Day 6|Check the use

    State that it is fictional with no permit application, contract signing, real investment, or site work.

  7. 07

    Day 7|Review the next step

    Check the recalculation, status, and willingness to clarify unknowns and choose project fundamentals training or one real job investigation.

Source: FermatMind editorial|Editorial suggestion|2026-10-01|local editorial synthesis

How to decide on day seven whether to continue

  • C should be 4 ten-thousand against the original 6 for a difference of 2; keep the units, quantities, unit prices, and formula.
  • The provisional total 19 is 1 below 20; keep B7 unconfirmed and do not call it approved.
  • The environment file draft has no approval, and material preparation is not a pass.
  • The grid connection reply date is unknown, and the D8 plan does not stand in for a formal reply.
  • The three items match the work piece, recording the changes and the steps for clarifying unknowns.
  • Note that it is fictional with no application, signing, or investment, and do not write real development performance.
  • Choose one project fundamentals training or job investigation and check the time, cost, and real duties.
Source: FermatMind editorial|Editorial suggestion|2026-10-01|local editorial synthesis

Opportunity evaluation and preliminary documents

01

Document entry

Typical responsibilities:Distinguish resource clues, research, and proposals.

Promotion evidence:Fictional document status and unknowns.

Qualification boundary:A clue does not prove resources or returns.

Next step:Learn the formal research document basis.

02

Research training

Typical responsibilities:Learn resource and environment assessment and scope.

Promotion evidence:Your own course and guidance feedback.

Qualification boundary:A course does not grant technical signing authority.

Next step:Add specific research fundamentals.

03

Development collaboration

Typical responsibilities:Organize schemes and application material per duty.

Promotion evidence:Approved documents and real status.

Qualification boundary:An application is not a granted permit.

Next step:Learn land and grid connection collaboration.

04

Scope expansion

Typical responsibilities:Check conditions first for new regions and projects.

Promotion evidence:Added training and review feedback.

Qualification boundary:Old policy is not automatically applied to new projects.

Next step:Choose only one ability gap.

Plan budget and construction coordination

01

Budget entry

Typical responsibilities:Check quantity, unit price, total, and quote status.

Promotion evidence:C4 total 19 with B unconfirmed.

Qualification boundary:Fictional costs, not market quotes.

Next step:Learn the real cost basis.

02

Project training

Typical responsibilities:Learn scope, resources, schedule, and service requirements.

Promotion evidence:Supervised planning documents.

Qualification boundary:A plan does not stand in for approval and signing.

Next step:Check the actual division of responsibility.

03

Stable coordination

Typical responsibilities:Keep consultant quality, budget, and changes.

Promotion evidence:Approved status reports and feedback.

Qualification boundary:Unknown dates do not get definite promises.

Next step:Add RFP and coordination fundamentals.

04

Responsibility expansion

Typical responsibilities:New construction or management tasks require checking authority.

Promotion evidence:Unit responsibility and training records.

Qualification boundary:A course does not grant site work authority.

Next step:Check one target responsibility.

Job investigation and specialized development

01

Job identification

Typical responsibilities:Distinguish development, engineering, and wind farm operations.

Promotion evidence:Comparison of the two announcements' task conditions.

Qualification boundary:The mixed jobs are not independent wind manager roles.

Next step:Choose one real job to check.

02

Specific preparation

Typical responsibilities:Add budget, status, and coordination fundamentals.

Promotion evidence:Your own course and paper work pieces.

Qualification boundary:Fiction does not stand in for development results.

Next step:Check the actual pre-job training.

03

Collaboration training

Typical responsibilities:Check conditions with the technical and permit responsible persons.

Promotion evidence:Unknown list and real replies.

Qualification boundary:Do not invent approvals and signatures.

Next step:Learn the job authorization boundary.

04

Direction choice

Typical responsibilities:Moving to corporate strategy or energy operations.

Promotion evidence:Target tasks and training gaps.

Qualification boundary:The same energy industry does not mean an automatic transfer.

Next step:Choose one training gap.

Ability ladder: what evidence counts for promotion?

  1. 01

    Document entry

    Check scope, cost, document status, and unknowns.

  2. 02

    Formal project fundamentals training

    Learn research, budgets, and application coordination responsibility.

  3. 03

    Stable review and coordination

    Keep versions and conditions, real replies, and changes.

  4. 04

    Project and responsibility expansion

    New technical, operations, or management scope requires checking the gap first.

Career outlook and related occupation transitions

How should the other managers parent group and energy directions be checked?

Insufficient evidence: no independent employment projection for this occupation was obtained; the BLS11-9199 parent group goes from 1,338,800 to 1,404,400 in 2025—2035, a net 65,600 and 4.9%, with 100,900 annual average openings that are not net growth.Moving to corporate strategy, geothermal, biofuel, or biomass operations, wind farm operations, engineering, construction, or project management requires checking the target object, output, and training, and the same energy industry does not mean an automatic transfer.

Three data types, three different bases

BLS: 11-9199 other managers parent group employment and characteristics

2025—2035

United States · 11-9199 all managers not listed separately

Parent group 4.9%

Other managers parent group overall employment change

The U.S. 11-9199 other managers broad parent group is projected to grow 4.9% from 2025—2035; the 100,900 annual average openings include growth and replacements and are not net growth each year, nor are they independent for wind development or AI causality.

Cannot show:11-9199 covers other managers and is not independent for this occupation, and the 4.9% is not broken into AI causality.

National Energy Administration: power business license notification and commitment letter (power generation)

2025 document path

China · Applicable enterprises and application conditions

Checked per the specific project party, not a job count

Enterprise power generation permit material boundary

The NEA power generation permit text supports the boundary of the enterprise party and material for inspection, not an increase in development manager headcount, and Chinese demand cannot be inferred to change the same amount from the U.S. broad parent group.

Cannot show:Enterprise permit material requirements are not job demand numbers.

Sichuan Energy Investment: 2025 new energy project development specialist

2025 announcements

Two Chinese employers · Sichuan Energy Investment specialist and Kunneng development manager

Both of the 2 samples have no wages; current openings unverified

Mixed development job task proxies

The Sichuan Energy Investment development specialist and the Kunneng development manager are 2 employers and 2 mixed development jobs, with the condition and wage gaps checked separately and not used as proof of national demand or a current opening.

Cannot show:The two mixed development jobs are not proof of national demand or of still hiring.

Where can existing abilities transfer?

These are ability-adjacency relations; they do not mean automatic promotion or no further study needed.

Chief Sustainability Officers

Editorial judgment: moving to enterprise-level strategy management.

Transferable:Multi-party coordination and environmental issues are connected.

To be supplemented:Add corporate sustainability strategy responsibility.

View occupation details

Geothermal Production Managers

Editorial judgment: the object shifts to geothermal operation.

Transferable:Energy project and management backgrounds are connected.

To be supplemented:Add geothermal facility operation monitoring.

View occupation details

Biofuels Production Managers

Editorial judgment: moving to production operation responsibility.

Transferable:Cost management and data backgrounds are connected.

To be supplemented:Add biofuel production and correction.

View occupation details

Biomass Power Plant Managers

Editorial judgment: moving to plant operations and maintenance management.

Transferable:Energy cost and staff coordination are connected.

To be supplemented:Add biomass power plant operations and maintenance.

View occupation details

Wind energy operations managers

Editorial judgment: development shifts to operational responsibility.

Transferable:Wind farm and cost coordination backgrounds are connected.

To be supplemented:Add commissioned operation equipment maintenance and staff.

View occupation details

Wind energy engineers

Editorial judgment: management coordination shifts to engineering design.

Transferable:Wind farm and technical document backgrounds are connected.

To be supplemented:Add collector system design and site specifications.

View occupation details

Construction managers

Editorial judgment: the focus shifts to construction management.

Transferable:Budget, schedule, and construction coordination are connected.

To be supplemented:Add construction organization and site responsibility.

View occupation details

Project management specialists

Editorial judgment: moving to target project professional coordination.

Transferable:Project scope, schedule, and budget are connected.

To be supplemented:Add target project purchasing staff coordination.

View occupation details

Common questions and sources

What does a development manager mainly do?

11-9199.10 manages wind energy opportunity development and evaluation, including environmental studies, permits, and proposals, and may manage construction; operations and maintenance are separated separately.

How is it distinguished from operations managers and engineers?

Operations manager .09 focuses on wind farm operation, and engineer 17-2199.10 focuses on collector system design and site specifications; development coordination does not stand in for design or work authority.

How can I get an experience without a wind farm?

Use the A/B/C fictional budget and status problem to check 4 and 19 ten-thousand yuan and the conditions, and do not apply for permits, sign contracts, or make a real investment.

Source: FermatMind editorial|Editorial suggestion|2026-10-01|local editorial synthesis
How should education and experience be checked?

O*NET Zone4 is a general background and the parent group typical bachelor and experience; the Sichuan Energy Investment bachelor with more than 3 years and the Kunneng college diploma with experience preferred apply respectively.

How many development managers will AI replace?

Insufficient evidence: no independent replacement rate for this occupation was obtained, and the 11-9199 parent group 4.9% and software background cannot be broken into AI causality.

Source: U.S. Bureau of Labor Statistics|United States|2025 base period; 2025—2035 projection|official reference · Source: FermatMind editorial|Editorial suggestion|2026-10-01|local editorial synthesis
Why is the U.S. wage a parent group figure?

The 2025 national quintiles 74,300/102,880/141,900/186,300/238,270 USD come from the 11-9199 other managers parent group and are not independent for wind development; the 2023 industry averages are listed separately as historical.

Does 19 ten-thousand yuan mean the budget is approved?

No, B7 is not yet confirmed, the 20 is only the problem ceiling, and the provisional total 19 does not mean an approved investment or a constructible project.

Source: FermatMind editorial|Editorial suggestion|2026-10-01|local editorial synthesis
Can EC guarantee development performance?

EC is an interest in management communication and procedural documents and cannot replace technical research, coordination feedback, and actual duty training.

Source: U.S. Department of Labor, O*NET|United States|2025 task profile; 2025 parent group wages|official reference · Source: FermatMind editorial|Editorial suggestion|2026-10-01|local editorial synthesis
Is an enterprise power generation permit a manager certificate?

No, the NEA power generation text addresses enterprise applications and conditional material, and the applicability to a specific project and personal technical work authority are checked separately.

Source: National Energy Administration|China|2025 document path; includes the 2024 amended basis|official reference · Source: FermatMind editorial|Editorial suggestion|2026-10-01|local editorial synthesis
Can the two announcements estimate Chinese wages?

Insufficient evidence: neither mixed development job disclosed wages, neighboring job quotes are not applied, and Chinese national percentiles are not estimated from project scale or the U.S. parent group.

Sources

FermatMind career content editor

Local revision 2026-10-03; each source's period and use is shown in the expanded cards

This occupation's development tasks, the 2025 other managers parent group national percentiles and projection, the 2023 historical industry data, the three actual-duty industry backgrounds, the NEA enterprise permits, and the two development jobs were checked respectively; the budget and status problem is an original editorial exercise.

  • O*NET: Chief Sustainability Officers 11-1011.03U.S. Department of Labor, O*NET|United States|2025 profile|official reference
    View original materials:O*NET: Chief Sustainability Officers 11-1011.03
    • Add corporate sustainability strategy responsibility.

    Usage limits:An independent target definition for duty comparison, not used as this occupation's wage, Chinese hiring, or an automatic transfer proof.

  • O*NET: Biomass Power Plant Managers 11-3051.04U.S. Department of Labor, O*NET|United States|2025 profile|official reference
    View original materials:O*NET: Biomass Power Plant Managers 11-3051.04
    • Add biomass power plant operations and maintenance.

    Usage limits:An independent target definition for duty comparison, not used as this occupation's wage, Chinese hiring, or an automatic transfer proof.

  • BLS: 11-9199 other managers parent group employment and characteristicsU.S. Bureau of Labor Statistics|United States|2025 base period; 2025—2035 projection|official reference
    View original materials:BLS: 11-9199 other managers parent group employment and characteristics
    • 1338.8 thousand to 1404.4 thousand, net 65.6 thousand, that is 4.9%, with 100.9 thousand annual average openings, self-employed 50.4%.
    • 2025 median wage 141,900 USD; parent group typical bachelor, less than 5 years of related experience, and no OJT.

    Usage limits:The broad parent group covers all managers not listed separately and is not a wind development listing; thousands are multiplied by 1000, openings are not net growth, and the self-employed share is not this occupation's proportion or income.

  • National Energy Administration: power business license notification and commitment letter (power generation)National Energy Administration|China|2025 document path; includes the 2024 amended basis|official reference
    View original materials:National Energy Administration: power business license notification and commitment letter (power generation)
    • Legal person application and capability conditions, application form and authorization; material for inspection includes project approvals, authorizations, and filings, acceptance, and environmental material.

    Usage limits:The enterprise power generation permit text is not a personal development manager certificate; applicability to a specific project and specific conditions are checked separately, and it is not inferred that all wind power is permit-free or that managers can do site work.

  • O*NET: Wind Energy Development Managers 11-9199.10U.S. Department of Labor, O*NET|United States|2025 task profile; 2025 parent group wages|official reference
    View original materials:O*NET: Wind Energy Development Managers 11-9199.10
    • Opportunity development and evaluation, environmental permit proposals, planning cost and consultants, and construction coordination; interest EC, Job Zone4.
    • The 2025 median of 141,900 USD/year and 68.22/hour are explicitly from the 11-9199 other managers parent group; software includes CAD/GIS/scheduling, and the old-period employment is not used.

    Usage limits:The tasks are precise but the wage, employment, and industry come from the parent group; application tasks are not administrative approval or technical work authority, and software is not generative adoption.

  • Sichuan Energy Investment: 2025 new energy project development specialistSichuan Energy Investment Integrated Energy Co., Ltd.; company-designated recruitment attachment|China|2025 public recruitment attachment; company announcement 2025-08-29|employer recruitment notice
    View original materials:Sichuan Energy Investment: 2025 new energy project development specialist
    • Attachment post 5, headquarters business management department, 1 person, bachelor in electric power, construction, civil engineering, or new energy related majors, age 45 or below, at least 3 years of development experience; photovoltaic and wind development, market expansion, long-term travel.

    Usage limits:Insufficient evidence: the Sichuan Energy Investment development specialist's wage is not disclosed. The mixed development specialist is not a precise wind manager sample; wages are not disclosed; company announcement registration ran 2025-08-29 to 09-08 and does not prove it is still hiring.

  • O*NET: Biofuels Production Managers 11-3051.03U.S. Department of Labor, O*NET|United States|2025 profile|official reference
    View original materials:O*NET: Biofuels Production Managers 11-3051.03
    • Add biofuel production and correction.

    Usage limits:An independent target definition for duty comparison, not used as this occupation's wage, Chinese hiring, or an automatic transfer proof.

  • National Bureau of Statistics: 2025 urban unit wage industry tableNational Bureau of Statistics|China|2025 statistics; interpretation published 2026-05-15|official reference
    View original materials:National Bureau of Statistics: 2025 urban unit wage industry table
    • Electricity supply non-private 160897/private 66451, scientific research and technical services 182064/83560, construction 92036/66275 yuan/year, all pre-tax averages for all employed persons in the industry.
    • Mapped by the employer's actual industry and by the conditions of opportunity development, employed research consulting, or construction enterprise construction management duties.

    Usage limits:Does not represent a wind development occupation percentile, a median or starting salary, personal bonuses, or self-employed net income; managing consultants and coordinating construction do not automatically determine the employer's industry.

  • NIST AI RMF1.0National Institute of Standards and Technology|General method|2023 framework|official reference
    View original materials:NIST AI RMF1.0
    • A trustworthiness and output risk review method applied editorially to trace cost and status back to the original basis.

    Usage limits:A voluntary framework, not a wind project return, permit approval rate, AI adoption, time saving, or replacement experiment.

  • BLS: 2023 other managers parent group OEWSU.S. Bureau of Labor Statistics|United States|May 2023 historical statistics|official reference
    View original materials:BLS: 2023 other managers parent group OEWS
    • Annual wages at the 10/25/50/75/90 percentiles are 67,370/97,990/133,560/174,510/225,120 USD.
    • Parent group industry annual averages: government (excluding specified schools, hospitals, and postal services) 144,260, corporate and enterprise management 170,030, management, scientific, and technical consulting 173,100 USD.

    Usage limits:Not 2025 or independent for wind development; excludes the self-employed, industry averages are not national medians, and the mean 146,320 is not used in place of the median 133,560.

  • O*NET: Wind Energy Development Managers 11-9199.10U.S. Department of Labor, O*NET|United States|2025 task profile; 2025 parent group wages|official reference
    View original materials:O*NET: Wind Energy Development Managers 11-9199.10
    • Opportunity development and evaluation, environmental permit proposals, planning cost and consultants, and construction coordination; interest EC, Job Zone4.
    • The 2025 median of 141,900 USD/year and 68.22/hour are explicitly from the 11-9199 other managers parent group; software includes CAD/GIS/scheduling, and the old-period employment is not used.

    Usage limits:The tasks are precise but the wage, employment, and industry come from the parent group; application tasks are not administrative approval or technical work authority, and software is not generative adoption.

  • O*NET: Wind Energy Development Managers 11-9199.10U.S. Department of Labor, O*NET|United States|2025 task profile; 2025 parent group wages|official reference
    View original materials:O*NET: Wind Energy Development Managers 11-9199.10
    • Opportunity development and evaluation, environmental permit proposals, planning cost and consultants, and construction coordination; interest EC, Job Zone4.
    • The 2025 median of 141,900 USD/year and 68.22/hour are explicitly from the 11-9199 other managers parent group; software includes CAD/GIS/scheduling, and the old-period employment is not used.

    Usage limits:The tasks are precise but the wage, employment, and industry come from the parent group; application tasks are not administrative approval or technical work authority, and software is not generative adoption.

  • BLS: 11-9199 other managers parent group employment and characteristicsU.S. Bureau of Labor Statistics|United States|2025 base period; 2025—2035 projection|official reference
    View original materials:BLS: 11-9199 other managers parent group employment and characteristics
    • 1338.8 thousand to 1404.4 thousand, net 65.6 thousand, that is 4.9%, with 100.9 thousand annual average openings, self-employed 50.4%.
    • 2025 median wage 141,900 USD; parent group typical bachelor, less than 5 years of related experience, and no OJT.

    Usage limits:The broad parent group covers all managers not listed separately and is not a wind development listing; thousands are multiplied by 1000, openings are not net growth, and the self-employed share is not this occupation's proportion or income.

  • Kunneng: development manager (photovoltaic, wind)Kunneng Smart Energy Service Group Co., Ltd.|China|Published 2025-03-01|employer recruitment notice
    View original materials:Kunneng: development manager (photovoltaic, wind)
    • Business development department resource acquisition, scheme research, organizing proposals and feasibility studies, policy and legal information, and construction problem feedback; college diploma or above, sales or photovoltaic development experience preferred, long-term travel.

    Usage limits:Insufficient evidence: the Kunneng development manager's wage, headcount, and specific work region were not disclosed. The mixed project is not a separate wind manager role; wages, headcount, and specific region are not disclosed, other engineering and operations job certificates and regions are not applied, and current openings are unverified.

  • O*NET: Wind Energy Development Managers 11-9199.10U.S. Department of Labor, O*NET|United States|2025 task profile; 2025 parent group wages|official reference
    View original materials:O*NET: Wind Energy Development Managers 11-9199.10
    • Opportunity development and evaluation, environmental permit proposals, planning cost and consultants, and construction coordination; interest EC, Job Zone4.
    • The 2025 median of 141,900 USD/year and 68.22/hour are explicitly from the 11-9199 other managers parent group; software includes CAD/GIS/scheduling, and the old-period employment is not used.

    Usage limits:The tasks are precise but the wage, employment, and industry come from the parent group; application tasks are not administrative approval or technical work authority, and software is not generative adoption.

  • O*NET: Wind Energy Development Managers 11-9199.10U.S. Department of Labor, O*NET|United States|2025 task profile; 2025 parent group wages|official reference
    View original materials:O*NET: Wind Energy Development Managers 11-9199.10
    • Opportunity development and evaluation, environmental permit proposals, planning cost and consultants, and construction coordination; interest EC, Job Zone4.
    • The 2025 median of 141,900 USD/year and 68.22/hour are explicitly from the 11-9199 other managers parent group; software includes CAD/GIS/scheduling, and the old-period employment is not used.

    Usage limits:The tasks are precise but the wage, employment, and industry come from the parent group; application tasks are not administrative approval or technical work authority, and software is not generative adoption.

  • NIST AI RMF1.0National Institute of Standards and Technology|General method|2023 framework|official reference
    View original materials:NIST AI RMF1.0
    • A trustworthiness and output risk review method applied editorially to trace cost and status back to the original basis.

    Usage limits:A voluntary framework, not a wind project return, permit approval rate, AI adoption, time saving, or replacement experiment.

  • O*NET: Wind Energy Development Managers 11-9199.10U.S. Department of Labor, O*NET|United States|2025 task profile; 2025 parent group wages|official reference
    View original materials:O*NET: Wind Energy Development Managers 11-9199.10
    • Opportunity development and evaluation, environmental permit proposals, planning cost and consultants, and construction coordination; interest EC, Job Zone4.
    • The 2025 median of 141,900 USD/year and 68.22/hour are explicitly from the 11-9199 other managers parent group; software includes CAD/GIS/scheduling, and the old-period employment is not used.

    Usage limits:The tasks are precise but the wage, employment, and industry come from the parent group; application tasks are not administrative approval or technical work authority, and software is not generative adoption.

  • O*NET: Geothermal Production Managers 11-3051.02U.S. Department of Labor, O*NET|United States|2025 profile|official reference
    View original materials:O*NET: Geothermal Production Managers 11-3051.02
    • Add geothermal facility operation monitoring.

    Usage limits:An independent target definition for duty comparison, not used as this occupation's wage, Chinese hiring, or an automatic transfer proof.

  • O*NET: Wind Energy Development Managers 11-9199.10U.S. Department of Labor, O*NET|United States|2025 task profile; 2025 parent group wages|official reference
    View original materials:O*NET: Wind Energy Development Managers 11-9199.10
    • Opportunity development and evaluation, environmental permit proposals, planning cost and consultants, and construction coordination; interest EC, Job Zone4.
    • The 2025 median of 141,900 USD/year and 68.22/hour are explicitly from the 11-9199 other managers parent group; software includes CAD/GIS/scheduling, and the old-period employment is not used.

    Usage limits:The tasks are precise but the wage, employment, and industry come from the parent group; application tasks are not administrative approval or technical work authority, and software is not generative adoption.

  • O*NET: Wind Energy Operations Managers 11-9199.09U.S. Department of Labor, O*NET|United States|2025 profile|official reference
    View original materials:O*NET: Wind Energy Operations Managers 11-9199.09
    • Add commissioned operation equipment maintenance and staff.

    Usage limits:An independent target definition for duty comparison, not used as this occupation's wage, Chinese hiring, or an automatic transfer proof.

  • O*NET: Wind Energy Engineers 17-2199.10U.S. Department of Labor, O*NET|United States|2025 profile|official reference
    View original materials:O*NET: Wind Energy Engineers 17-2199.10
    • Add collector system design and site specifications.

    Usage limits:An independent target definition for duty comparison, not used as this occupation's wage, Chinese hiring, or an automatic transfer proof.

  • O*NET: Construction Managers 11-9021.00U.S. Department of Labor, O*NET|United States|2026 profile|official reference
    View original materials:O*NET: Construction Managers 11-9021.00
    • Add construction organization and site responsibility.

    Usage limits:An independent target definition for duty comparison, not used as this occupation's wage, Chinese hiring, or an automatic transfer proof.

  • O*NET: Project Management Specialists 13-1082.00U.S. Department of Labor, O*NET|United States|2026 profile|official reference
    View original materials:O*NET: Project Management Specialists 13-1082.00
    • Add target project purchasing staff coordination.

    Usage limits:An independent target definition for duty comparison, not used as this occupation's wage, Chinese hiring, or an automatic transfer proof.

  • O*NET: Wind Energy Development Managers 11-9199.10U.S. Department of Labor, O*NET|United States|2025 task profile; 2025 parent group wages|official reference
    View original materials:O*NET: Wind Energy Development Managers 11-9199.10
    • Opportunity development and evaluation, environmental permit proposals, planning cost and consultants, and construction coordination; interest EC, Job Zone4.
    • The 2025 median of 141,900 USD/year and 68.22/hour are explicitly from the 11-9199 other managers parent group; software includes CAD/GIS/scheduling, and the old-period employment is not used.

    Usage limits:The tasks are precise but the wage, employment, and industry come from the parent group; application tasks are not administrative approval or technical work authority, and software is not generative adoption.

  • BLS: 2023 other managers parent group OEWSU.S. Bureau of Labor Statistics|United States|May 2023 historical statistics|official reference
    View original materials:BLS: 2023 other managers parent group OEWS
    • Annual wages at the 10/25/50/75/90 percentiles are 67,370/97,990/133,560/174,510/225,120 USD.
    • Parent group industry annual averages: government (excluding specified schools, hospitals, and postal services) 144,260, corporate and enterprise management 170,030, management, scientific, and technical consulting 173,100 USD.

    Usage limits:Not 2025 or independent for wind development; excludes the self-employed, industry averages are not national medians, and the mean 146,320 is not used in place of the median 133,560.

  • BLS: 11-9199 other managers parent group employment and characteristicsU.S. Bureau of Labor Statistics|United States|2025 base period; 2025—2035 projection|official reference
    View original materials:BLS: 11-9199 other managers parent group employment and characteristics
    • 1338.8 thousand to 1404.4 thousand, net 65.6 thousand, that is 4.9%, with 100.9 thousand annual average openings, self-employed 50.4%.
    • 2025 median wage 141,900 USD; parent group typical bachelor, less than 5 years of related experience, and no OJT.

    Usage limits:The broad parent group covers all managers not listed separately and is not a wind development listing; thousands are multiplied by 1000, openings are not net growth, and the self-employed share is not this occupation's proportion or income.

  • National Energy Administration: power business license notification and commitment letter (power generation)National Energy Administration|China|2025 document path; includes the 2024 amended basis|official reference
    View original materials:National Energy Administration: power business license notification and commitment letter (power generation)
    • Legal person application and capability conditions, application form and authorization; material for inspection includes project approvals, authorizations, and filings, acceptance, and environmental material.

    Usage limits:The enterprise power generation permit text is not a personal development manager certificate; applicability to a specific project and specific conditions are checked separately, and it is not inferred that all wind power is permit-free or that managers can do site work.

  • FermatMind: fictional development work package budget and statusFermatMind editorial|Editorial suggestion|2026-10-01|local editorial synthesis
    • C2 × 2 = 4 against the original 6 for a difference of 2, total 8+7+4=19 which is 1 below 20 with B unconfirmed; the environment draft and the blank grid connection date are kept.

    Usage limits:Fictional and on paper; does not verify resources or returns, apply for permits, sign, invest, or do site work, and cannot pose as real development experience.

  • O*NET citing BLS: 2025 other managers parent group national wagesU.S. Department of Labor, O*NET / BLS|United States nationwide|May 2025|official reference
    View original materials:O*NET citing BLS: 2025 other managers parent group national wages
    • The page states explicitly that wage data were collected from Managers, All Other.
    • Five annual wage percentiles 74300/102880/141900/186300/238270 USD; hourly 35.72/49.46/68.22/89.57/114.55.

    Usage limits:11-9199 other managers not listed separately is a broad parent group and not independent for 11-9199.10; employee percentiles are not self-employed income, a grade, or a starting salary.

  • Three representative core tasks of this occupationFermatMind / 费马测试|2026-10-18|Editorial model estimation method
    View original materials:Three representative core tasks of this occupation
    • Model impact index for three equally weighted representative core tasks; not a measured share of working time or a job-loss probability. floor((50+75+25)/3+0.5)=50; fermatmind-ai-impact-v1; 2026-10-18.
    • Anchors: 0 negligible; 25 preparation or record assistance; 50 substantial assistance; 75 most information output can be formed by AI with review; 100 almost all of the selected task can be done by AI and independently verified.
    • Development|Opportunity and resource evaluation|Coordinate energy assessment and preliminary studies and keep the basis and assumptions. — 50/100; weight=1/3; wind-energy-development-managers.display.responsibilities_block.01[0]
    • Planning|Scope, resources, schedule|Prepare objectives, tasks, resources, costs, and preliminary arrangements. — 75/100; weight=1/3; wind-energy-development-managers.display.responsibilities_block.02[0]
    • Collaboration|Consultants, subcontractors, and agreements|Check service quality and budget and land, power purchase, and grid connection conditions. — 25/100; weight=1/3; wind-energy-development-managers.display.responsibilities_block.05[0]

    Usage limits:Editorial ratings use the existing occupational responsibilities and AI task analysis on this page. They are not adoption rates, measured effects, job-disappearance or personal-unemployment probabilities, or official scores from Stanford or another external institution. No measured time weights or future robot deployment are assumed.

  • Occupational tasks; for combined pages applies to the named component occupationO*NET OnLine (U.S. DOL/ETA)|United States|Occupational profile
    View original materials:Occupational tasks; for combined pages applies to the named component occupation
    • The task table describes the work and its typical outputs.

    Usage limits:Check duties and authorization for the actual workplace.

  • Fictional occupational recordFermatMind|This page|2026-11-10
    • Use a fictional record to identify discrepancies and hand them off for review.

    Usage limits:Paper exercise only.

  • O*NET® 31.0 Core Task StatementsU.S. Department of Labor, Employment and Training Administration|United States|O*NET 31.0|Primary document
    View original materials:O*NET® 31.0 Core Task Statements

    Usage limits:Verbatim Core Task Statements excerpted from the O*NET® 31.0 Database, used under CC BY 4.0. U.S. occupational scope.

  • O*NET® database license · CC BY 4.0U.S. Department of Labor, Employment and Training Administration|United States|O*NET 31.0|Primary document
    View original materials:O*NET® database license · CC BY 4.0

    Usage limits:Verbatim Core Task Statements excerpted from the O*NET® 31.0 Database, used under CC BY 4.0. U.S. occupational scope.

Insufficient evidence: this occupation's independent wage projection, AI replacement, and Chinese national wages were not obtained, and the parent group and two mixed jobs are not used to fill them in. This occupation is wind opportunity development, and engineering design, operations, and site work are checked separately. The U.S. 2025 parent group national percentiles and the 2023 historical industry averages are distinguished; the two Chinese mixed development jobs' wages are still missing. The fictional budget and status problem does not apply for permits, invest, or sign, and it does not verify resources or returns.

Wind Energy Development Managers | FermatMind