Preparing content…

Derrick Operators, Oil and Gas vs Riggers

Rig equipment and the gear used to move loads

Derrick operators set up rig equipment and operate and monitor drilling-fluid pumps. Riggers set up, inspect, and maintain rigging used to move or support loads. At a drilling site these can be separate assignments, each with its own work record.

Work, entry, and U.S. pay

ItemOil and gas derrick operatorsRiggers
OutputCirculation and rig equipment recordRigging inspection and load handoff
Setting examplesDrilling sitesConstruction, industrial facilities, or shipyards
Typical U.S. entry educationNo formal educational credentialHigh school diploma or equivalent
Typical related experienceLess than five yearsNone
Typical on-the-job trainingShort-termModerate-term
2025 U.S. median annual wage$58,620$62,640

National wage and salary medians exclude self-employment. BLS Table 1.2 · O*NET derrick duties · O*NET rigging duties

One pump replacement, two handoffs

At a fictional drill site, a crew plans to replace circulation equipment. The derrick operator confirms the equipment ID and sends its status and handoff window to the lift coordinator. The rigger matches the intended load to the task order and sends the rigging inspection record to the lift lead. The drilling lead confirms equipment status and the lift lead reviews the rigging evidence. The coordinator records the two statuses separately.

What to check before taking a job

Ask derrick employers which rig duties new hires take on, what related experience counts, and how supervision works. For rigging, ask which loads and settings the role covers, how the employer trains workers, and which task-specific credentials or approvals apply.

What changes the workweek

Derrick work can follow the drilling crew's rotation. Ask whether the site is residential or remote and what monitoring carries across shifts. Rigging is used in settings such as construction, manufacturing, and shipyards. Ask whether workers move between job sites and how the schedule changes when a lift is delayed.

Supervised starting points

Moving into rigging, bring a fictional equipment traceability record and start with supervised load identification and inspection documentation. Learn the lifting assignment and site requirements. Moving toward derrick work, bring a fictional rigging inspection record and start with supervised circulation log checks. Learn rig crew responsibilities and assigned equipment.

Frequently asked questions and next steps

Do derrick operators and riggers do the same setup work?

Derrick work centers on the drill site and circulation equipment. Rigging work centers on equipment used to move or support an assigned load. Check how those responsibilities are assigned at the site.

Read the individual profiles for Derrick Operators, Oil and Gas and Riggers. The Holland career interest test can help you describe which tasks you would like to explore.