Build and repair fences and fence gates using hand and power tools: lay out the fence line and mark post positions according to drawings or instructions, and confirm there are no cables or water pipes in the work area before digging; dig post holes with shovels, post hole diggers or power augers and set metal or wooden posts vertically and correct plumb with a level and string line; pour concrete at the base of the posts or backfill and tamp them into place; install rails and braces on the posts and saw lumber or cut metal pipe to make rails; stretch wire, wire mesh or chain link fencing and fasten it to the frame; assemble and install fence gates; also build and repair structures such as baffles, retaining walls and trellises; discuss fence needs with clients and estimate and quote; some work involves welding metal parts with portable gas welding equipment, and in special cases rock may be handled by blasting to allow post holes to be dug.
This checklist is only for self-questioning and does not constitute hiring criteria, a capability score or a suitability conclusion. Even within "Fence Erectors" there is great variation (residential wooden fencing, chain link fencing, wire and ranch fencing, metal gates and automatic gates, municipal and traffic barriers, and structures such as retaining walls and trellises), and the fence type, whether excavation and concrete work are included, whether welding and blasting are involved, whether it is contracted at a project rate or paid by the day, and whether one quotes directly to clients all differ; before comparing posts, first check the post's fence type and work content, whether excavation and concrete are included, whether welding or rock handling is required, whether work at height and underground utility confirmation are involved, labor protection and safety training requirements, and local rules on construction, employment and wages and hours.
The daily work of fence erectors revolves around the process of "layout—excavation—posts—mesh—gate": measure the fence line and mark post positions according to drawings or client requirements, and confirm there are no cables or water pipes in the work area before digging; dig post holes with shovels, post hole diggers or power augers; set metal or wooden posts vertically and correct plumb with a string line, plumb bob or level; pour concrete at the base or backfill and tamp into place; install rails and braces on the posts and saw lumber or cut metal pipe as needed; stretch wire, wire mesh or chain link fencing and fasten it to the frame; assemble fence gates and install them in place; also build and repair structures such as baffles, retaining walls and trellises; discuss fence needs with clients and estimate and quote; some work uses portable gas welding equipment to weld metal parts, and in special cases rock may be handled by blasting to allow post holes to be dug.
United States O*NET-SOC 47-4031.00 "Fence Erectors": building and repairing fences and fence gates using hand and power tools.
Construction urban non-private units 92,036 yuan/year (2025)
Industry proxy value: an industry average basis covering multiple occupations, and it cannot replace this occupation's wages.
Construction urban private units 66,275 yuan/year (2025)
O*NET OnLine fence erector occupation profile|https://www.onetonline.org/link/summary/47-4031.00; BLS Occupational Employment and Wage Statistics (OEWS)|https://www.bls.gov/oes/; BLS occupational projections and characteristics tables|https://www.bls.gov/emp/tables/occupational-projections-and-characteristics.htm
| Entry directions | Starting tasks | Evidence that can be prepared | Works that can be shown without experience | Differences to note |
|---|---|---|---|---|
| Construction helper post | Complete carrying, cleaning and excavation assistance under mentoring | Work and training records | Write out on-site check key points before excavation | Leans toward an assisted scenario, requiring attention to safety and cooperation |
| Fence installation post | Independently complete layout, posts and mesh installation | Construction and self-inspection records | Write out fence layout and post key points | Leans toward an installation scenario, requiring attention to precision and standards |
| Fence and gate repair post | Diagnose damage to fences and gates and complete repairs | Repair and acceptance records |
Build and repair fences and fence gates using hand and power tools: measure the fence line and mark post positions according to drawings, and confirm there are no cables or water pipes in the area before digging; dig post holes with shovels, post hole diggers or power augers and set metal or wooden posts vertically and correct plumb with a level and string line; pour concrete at the base or backfill and tamp into place; install rails and braces and saw lumber or cut metal pipe to make rails; stretch wire, wire mesh or chain link fencing and fasten it to the frame; assemble and install fence gates; also build and repair structures such as baffles, retaining walls and trellises; and discuss fence needs with clients and estimate and quote.
The objects of responsibility differ: this occupation mainly covers layout and positioning, post excavation, installation of rails and mesh, and assembly of fence gates; carpenters mainly make and fit out wooden structures; cement masons and concrete finishers mainly pour and finish concrete surfaces; construction laborers mainly do site cleaning, carrying and auxiliary work; drywall and ceiling tile installers mainly install indoor panels and ceilings; electricians are responsible for installing electrical wiring and equipment; landscaping and groundskeeping workers are responsible for planting and site upkeep; roofers mainly do roof waterproofing and tile laying; and first-line supervisors of construction trades are responsible for assigning tasks and supervising construction quality and safety.
Verify with a paper drill: give yourself a completely fictional fence installation assignment (fence type and total length, site conditions and underground utilities, schedule and weather constraints, available tools and material list, safety and protection requirements to observe, and the client's expectations for style and price), and require you to write out the work sequence and layout key points, the construction method for posts and foundations, the site information that needs to be recorded and verified, which situations must be stopped and confirmed with a supervisor or specialist, and the protection and safety key points.
Signals more worth considering: willing to lay out and correct section by section according to drawings and specifications, able to keep working outdoors in all weather and protect according to the procedures, and willing to complete the underground utility confirmation and safety checks before digging. Signals requiring caution: digging from experience without confirming underground utilities, skipping protective equipment, and treating welding and work at height as things that can be handled casually.
This card is a career exploration reference and does not constitute a hiring, capability score or construction safety and engineering conclusion.
First judge whether you are willing to work outdoors over the long term, accept a workload based mainly on standing, bending and carrying, and carry out underground utility confirmation and safety protection according to the procedures; verify with this page's paper exercises and the seven-day task.
Work context|Fence erectors work on outdoor sites in residential, ranch, municipal and construction settings, forming a construction cycle around layout and positioning, excavation and posts, foundation fixing, rails and mesh, and gates and accessories. Work locations|Residential and garden fence sites, ranch and farmland boundaries, highway and municipal barrier sites, and construction sites and industrial grounds. Working conditions|Mainly outdoor physical work ("outdoors, exposed to all weather conditions" every day 76%, "standing continually or almost continually" 60%, "kneeling, crouching or bending continually or almost continually" 48%, "bending or twisting the body continually or almost continually" 33% in O*NET work context); daily exposure to hazardous equipment is 61%, and daily work at height is 48%; 99% of respondents wear protective equipment such as safety shoes, goggles, gloves or hard hats every day; work schedules are mainly fixed shifts (55%) with 27% seasonal; 89% of respondents work 40 hours per week and 11% more than 40 hours. Main objects|Post and rail materials (lumber, metal pipe, sections), fence mesh (wire, wire mesh, chain link), concrete and backfill soil, fence gates and hardware, tools and power equipment, and drawings and quotation materials. Collaboration|Working with the foreman or project lead, colleagues, clients, material suppliers and the owners of underground utilities. Tools and materials|Shovels and post hole diggers, power augers, hammers and wrenches, levels and plumb bobs, cutting and welding tools, concrete mixing tools, tape measures and layout supplies, and drawings and quotation sheets. Institutional basis|Requirements to confirm underground pipes and cables before excavation, construction and confined space (excavation) safety requirements, work at height and protective equipment requirements, power tool and welding safety requirements, electrical safety requirements, and employment and wage and hour rules (including settlement rules for contracting and project pricing); special operations such as blasting must also follow special qualification and permit requirements. Record requirements|Layout and position records, material and hour records, concrete and backfill records, safety inspection and protective equipment issuance records, and client change and acceptance records must be documented according to employer rules. Safety and jurisdictional boundaries|Underground utility confirmation, excavation and work at height safety, welding and electrical safety, blasting qualifications, and employment settlement must be handled according to competent authority requirements, special qualifications and employer rules; matters involving utilities, structural safety, blasting and contract settlement must be confirmed by the utility owner, professional technical personnel or competent authorities, and this page does not provide engineering, construction safety or legal advice.
Centered on fence layout, post excavation and mesh installation
May2025 national median hourly wage 23.07 USD and annual wage 47,980 USD. BLS Table1.2, SOC47-4031: 2025 employment 30,600; 2025—2035 growth of 5.6%, with an estimated average of 2,500 openings per year, including replacement needs. That row has no OOH link, and an adjacent occupation group is not substituted.
Confirm underground utilities and lay out the line → dig post holes → set and correct the posts → pour or backfill to fix → install rails and stretch the mesh → assemble and install the fence gate → clean the site and hand over for acceptance
National Bureau of Statistics 2025 urban unit wages: this occupation is not listed separately with a national value; this page uses the average wage of the "construction" industry as a proxy (non-private 92,036 yuan/year, private 66,275 yuan/year), which only describes the industry background and cannot replace occupational wages or project-based income.
Layout and position records, material and hour records, safety inspection and protective equipment issuance records, client change and acceptance records
BLS Table1.2, SOC47-4031: 2025 employment 30,600; 2025—2035 growth of 5.6%, with an estimated average of 2,500 openings per year, including replacement needs. That row has no OOH link, and an adjacent occupation group is not substituted.
Confirm underground utilities → lay out the line → excavate → posts → install mesh → install gate
This page did not check item by item the original text of the requirements to confirm underground pipes and cables before excavation, construction and excavation safety requirements, work at height and protective equipment requirements, power tool and welding safety requirements, electrical safety requirements, or employment and wage and hour rules; matters involving utilities, structural safety, blasting qualifications and contract settlement must be confirmed separately according to the utility owner, special qualifications, competent authority requirements and the original employer rules, and this page is not an engineering, construction safety or legal basis.
Layout and position records, material and hour records, safety inspection and protective equipment issuance records, and client change and acceptance records must all be documented according to employer rules.
Fence erectors and adjacent roles are often conflated, and the way to distinguish them is to look at the object of responsibility: this occupation mainly covers layout and positioning, post excavation, installation of rails and mesh, and assembly of fence gates; carpenters focus on making and installing wooden structures; cement masons and concrete finishers focus on pouring and finishing concrete surfaces; construction laborers focus on site cleaning, carrying and auxiliary work; drywall and ceiling tile installers focus on indoor panel and ceiling installation; electricians are responsible for installing electrical wiring and equipment; landscaping and groundskeeping workers are responsible for planting and site upkeep; roofers focus on roof waterproofing and tile laying; and first-line supervisors of construction trades are responsible for assigning tasks and supervising construction quality and safety.
Complete layout, post excavation and fence installation work according to the construction procedures
Build and repair fences and fence gates using hand and power tools, completing layout and positioning, excavation and posts, foundation fixing, rail and mesh installation, and gate and accessory installation.
The objects are fence materials and tools; the basis is drawing specifications and construction safety requirements
The objects include post and rail materials, fence mesh, concrete and backfill soil, fence gates and hardware, tools and power equipment, and drawings and quotation materials; the basis is drawings and specifications, construction and safety operating procedures, underground utility confirmation requirements and the employer's work standards.
The occupational scope covers mainly fence and fence gate installation and repair and also includes the post base concrete, welding and related baffle work listed in the task list. Carpenters, concrete finishers, electricians, landscape workers and supervisors are distinguished by their main duties, and the auxiliary steps of this occupation cannot be excluded wholesale; blasting is a supplemental task and does not mean an ordinary post is authorized to carry it out.
Centered on fence installation and repair, with attention to layout and positioning and client estimating
Layout → excavation → posts → mesh → gate → acceptance
Layout and position records, material and hour records, safety inspection records
Construction safety and quality responsibility are borne jointly by the workers and the employer according to the procedures
Construction safety, fence quality and underground utility protection responsibility are borne by the workers and the employer according to the procedures; matters involving utilities, structural safety, blasting and contract settlement must be handled according to the utility owner, special qualifications and competent authority requirements.
Matters beyond the procedures or authorization scope must be stopped and confirmed with a supervisor or specialist
In situations involving underground pipes and cables, suspected structural or geological problems, special operations such as blasting, and qualified work at height and welding, work must be stopped and confirmed with a supervisor, professional technical personnel or the utility owner.
Work efficiency is affected by weather, geology and site conditions
The performance of a single construction job does not constitute a final conclusion about an individual
Before starting work, check item by item: the fence type and work content; whether excavation and concrete work are included; whether welding or rock handling is required (O*NET work context shows 89% work 40 hours per week and 11% more than 40 hours, with schedules mainly fixed shifts and some seasonal work); underground utility confirmation and safety training requirements; provision of protective equipment and work at height arrangements; the pay and settlement method (daily, per meter or per project); and local rules on construction and employment.
Check the fence type and work content
Confirm whether it is wooden, chain link, wire or metal gate fencing
Check excavation and foundation work
Confirm whether post hole excavation and concrete pouring are involved
Check welding and special operations
Confirm whether special work such as welding or rock handling is required
Check safety and protection arrangements
Confirm the underground utility confirmation process and the provision of protective equipment
Check the pay and settlement method
Confirm the daily, per meter or per project pricing and settlement rules
Check local regulations and qualification requirements
Check against competent authority requirements and special qualifications; this page is not an engineering or construction safety basis
When comparing adjacent directions, first see whether the object of responsibility falls on "fences and fence gates", "wooden structures and fit-out", "concrete pouring and finishing", "site cleaning and carrying", "indoor panels and ceilings", "electrical wiring and equipment", "planting and site upkeep", "roof waterproofing" or "construction task assignment and quality and safety supervision"; this occupation differs in laying out and positioning according to drawings, excavating posts, installing rails and mesh and assembling fence gates, turning site conditions and client requirements into a deliverable fence.
The basis for comparison is O*NET 47-4031.00 and the official occupational profiles of related occupations (tasks, work activities and preparation level) and the BLS occupational and wage statistics. These materials describe the occupational scope and do not represent the feasibility of an individual's transition, wage outcomes or the construction safety and qualification requirements of a particular region; the supplementary training and experience needed for cross-occupation transition must be checked item by item against the target post announcement.
The following occupations all work on construction sites, but the objects of responsibility differ; use them to help locate a direction, not as substitutes for one another.
Mainly making and installing wooden structures; this occupation mainly involves fence layout, posts and mesh installation
Choose that occupation if you prefer wooden structures and fit-out; choose this occupation if you prefer fence installation
Make and install wooden structural components and doors and windows
Mainly concrete pouring and surface finishing; this occupation mainly involves post foundations and fence installation
Choose that occupation if you prefer concrete work; choose this occupation if you prefer fence and mesh installation
Pour components and finish concrete surfaces
Cement masons and concrete finishers
Mainly site cleaning, carrying and auxiliary work; this occupation mainly involves positioning and installation for fence construction
Choose that occupation if you prefer general site work; choose this occupation if you prefer specialized technical installation
Clean the site and carry materials and tools
Construction laborers
Mainly indoor panel and ceiling installation; this occupation mainly involves outdoor fence construction
Choose that occupation if you prefer indoor fit-out; choose this occupation if you prefer outdoor installation
Install drywall and ceiling panels
Drywall and ceiling tile installers
Mainly electrical wiring and equipment installation; this occupation mainly involves fence structure installation
Choose that occupation if you prefer electrical installation; choose this occupation if you prefer fence construction
Install electrical wiring and powered equipment
Mainly planting and site upkeep; this occupation mainly involves installing structures such as fences
Choose that occupation if you prefer planting and upkeep; choose this occupation if you prefer fence construction
Plant and maintain greenery and upkeep the site
Landscaping and groundskeeping workers
Compare in the order of "first see whether the object of responsibility is fences and fence gates, wooden structures, concrete, site carrying, indoor panels, electrical wiring, planting and upkeep or construction supervision".
Practitioners preparing to enter frontline fence construction posts
First master layout and measurement and the safe operation of hand and power tools, and complete the post and mesh installation for one section of fence under mentoring.
Newly entered construction helpers
Fix underground utility confirmation, layout, posts and fixing into a process; report first rather than handling utilities, geology or qualified work yourself, and keep construction and inspection records.
Practicing fence installation and repair staff
Editorial trial suggestion: with authorization, use de-identified drawing text, material lists or acceptance records to test summarization and filing; material usage and quotations must be checked with verified dimensions and calculations, and tools do not confirm underground utilities or construction safety.
Foremen and project leads
First establish rules for underground utility confirmation, excavation and work at height safety, and power tool and welding qualifications, then decide in which steps to use AI, and clarify ownership of construction safety and quality responsibility.
The editorial trial directions are checklist organization, material retrieval and record filing. This round obtained no research on AI adoption rates, productivity or net job effects in fence construction; global ILO exposure cannot imply overall augmentation for this occupation and does not verify on-site measurement or safety ability.
O*NET OnLine:Fence Erectors(47-4031.00)
Occupational tasks and work activities
BLS occupational projections and characteristics tables (2025—2035, 47-4031)
Wages, employment and outlook
BLS Occupational Employment and Wage Statistics (OEWS)
Wage distribution and statistical basis
ILO Working Paper 96: Generative AI and Jobs (2023)
International research on task exposure
NIST Artificial Intelligence Risk Management Framework (AI RMF 1.0)
AI risk and governance framework
O*NET fence erector work context data
Work context, exposure and protection requirements
O*NET fence erector detailed occupation data
Tasks, work activities and technology tools
Different work directions are affected in different ways, and three categories are distinguished below: drawing and quotation organization, on-site layout and installation work, and construction safety and quality responsibility.
Checklist organization: trial to be verified
On-site layout, excavation and installation work
Usage and quotation calculation can be assisted
On-site judgment of underground utilities and geology
Construction scheduling and material retrieval can be assisted
Construction safety and quality responsibility
The following evidence cards correspond to international organization task exposure research, official occupational data, employment projections, wage statistics and governance frameworks; please read them according to their respective research objects and limitations and do not merge them into a single conclusion.
Based on a task classification method, not enterprise actual adoption or job change data
ILO Working Paper 96 (2023)
Global employment and task-level generative AI exposure assessment
Most jobs have only some tasks exposed, and generative AI is more likely to augment than to replace wholesale; clerical tasks have the highest exposure, while the share of highly exposed tasks in managerial and professional occupations is lower. The research suggests the main effects are on job quality and intensity rather than wholesale job disappearance.
Describes the occupational scope and contains no AI adoption or productivity data
O*NET OnLine(47-4031.00)
Official occupational task and work activity descriptions
O*NET lists utility data confirmation, measurement and layout, posts, concrete fixing, mesh and gate installation and estimating tasks. Checklist organization is listed as a trial suggestion without claiming a ranking of automation difficulty; on-site judgment is carried out according to actual procedures and authorization.
Projections are based on assumptions and are not actual outcomes
BLS employment projections (2025—2035)
United States Fence Erectors employment projection
BLS Table1.2, SOC47-4031: 2025 employment 30,600; 2025—2035 growth of 5.6%, with an estimated average of 2,500 openings per year, including replacement needs. That row has no OOH link, and an adjacent occupation group is not substituted. The projection does not measure an independent AI effect.
OEWS wages do not equal contracting business revenue and exclude overtime premiums
BLS OEWS(May 2025)
United States Fence Erectors (47-4031) wage distribution
In 2025 the median hourly wage was 23.07 USD and the median annual wage 47,980 USD; the 10th and 90th percentiles were about 35,810 and 70,010 USD per year (May 2025 OEWS, precise occupation, presented via O*NET). This is for understanding magnitude and basis and cannot be used to infer AI effects on wages.
A governance framework containing no occupational or employment data
NIST Artificial Intelligence Risk Management Framework (AI RMF1.0)
AI system risk governance framework (voluntary adoption)
NIST AI RMF1.0 is a voluntary framework that can be used for design review and risk documentation suggestions, and is not a construction regulation or qualification basis; utility, excavation, height and welding requirements must be checked against the original local text.
Select de-identified checklists, drawing text summaries or record filings and trial them against known samples, comparing omissions and errors; this round did not verify that specific products can complete these tasks. Measurement, calculation and ordinary construction software cannot be taken directly as generative AI.
Editorial adoption suggestion: first check the systems and data the employer permits, then arrange original checklist review, on-site dimension verification and permission boundaries. This round obtained no enterprise adoption ratios, and no claim is made that most enterprises use tools only in specific steps.
BLS Table1.2, SOC47-4031: 2025 employment 30,600; 2025—2035 growth of 5.6%, with an estimated average of 2,500 openings per year, including replacement needs. That row has no OOH link, and an adjacent occupation group is not substituted. This round obtained no independent contribution of construction demand or mechanization to the projection for this occupation, and it certainly cannot be read as a causal AI job conclusion.
This round cannot verify overall augmentation, substitution rates or inevitable duty change for this occupation; global task exposure only suggests directions for investigation.
ILO Working Paper 96 (2023); O*NET 47-4031.00 task data
This occupation requires layout and installation experience, and O*NET lists it as Job Zone 1–2 (little to some preparation, SVP below 6.0); the work is mainly outdoor physical work, 89% of respondents work 40 hours per week, and 99% wear protective equipment every day. AI can assist with checklist and quotation organization but cannot replace layout, installation, utility confirmation or safety judgment.
O*NET 47-4031.00 technical skills and preparation level
Checklists, quotation drafts, scheduling and material retrieval are listed as editorial suggestions to be verified; no ranking of impact among tasks was obtained, so they are not called the most directly affected.
ILO Working Paper 96 (2023); O*NET task data
BLS Table1.2, SOC47-4031: 2025 employment 30,600; 2025—2035 growth of 5.6%, with an estimated average of 2,500 openings per year, including replacement needs. That row has no OOH link, and an adjacent occupation group is not substituted. There is no verified AI disappearance year.
BLS employment projections (2025—2035)
No. Tools can organize checklists and calculate quotations, but layout and positioning, post correction, excavation and work at height, and underground utility and geological judgment require on-site work and responsibility and must be carried out by trained personnel according to special qualifications and competent authority requirements; construction and safety inspection records likewise require signature and review, and tool output itself creates no attribution of responsibility.
NIST AI risk management framework; construction safety and special qualification requirements
This round obtained no evidence of an occupation disappearance year or inevitable task change; actual posts, equipment and permitted tools can be checked continuously.
BLS employment projections; ILO Working Paper 96
Prioritize learning three things: first, basic skills such as layout and measurement and correction with a level; second, the safe operation and maintenance of hand and power tools and cutting and welding equipment; third, underground utility confirmation and excavation and work at height protection requirements; and practice completing one section of fence according to drawings and specifications and filling in construction records.
O*NET 47-4031.00; BLS employment and wage statistics
When using AI to assist work in this occupation, it is suggested that boundaries and responsibilities be confirmed in the following order:
First confirm underground utility confirmation before excavation, work at height and tool safety requirements and special qualification requirements, and decide which steps may use tools.
Make clear that tools only handle checklist organization, quotation calculation and material retrieval, and do not produce construction plan conclusions or replace on-site judgment.
Check tool output item by item against drawings, specifications and site conditions, and have it reviewed by trained personnel or the foreman.
Record the tool name, version, input and human changes so that construction and safety inspection records remain traceable.
Construction safety and quality responsibility are borne by trained personnel and the foreman, and tool output does not constitute a conclusion that a check has been done or that the work is qualified.
Tools may give wrong material usage or specification advice
Check back item by item against the original drawings and specifications, and do not cut materials or build on that basis before verification
Drawings and client materials may involve commercial information
Process on a least-necessary basis according to employer rules, and sensitive materials must not be submitted to external tools
Construction and safety inspection records need to be traceable, otherwise the safety and quality process cannot be proven
Record the tool name, version, input and changes, and keep construction and inspection records
Wrong excavation or work at height judgments can affect personal and others' safety
Do an on-site review of key steps, and stop and report immediately when something is abnormal
Construction safety and utility protection require clearly defined responsibility
Make clear the verification rules for workers and the foreman, and the next step must not begin without review
Layout, excavation and installation are completed by on-site personnel
Layout, excavation and installation
On-site layout and installation work
Checklist and scheduling organization can be assisted (editorial judgment)
Underground utility and geological judgments are confirmed on site
On-site judgment of underground utilities and geology
Construction safety and quality responsibility
Material retrieval and prompts can be assisted (editorial judgment)
Post correction and mesh tensioning are carried out by on-site personnel
Post correction and mesh tensioning
On-site layout and installation work
Measurement and acceptance prompts can be assisted (editorial judgment)
Client requirement communication and quoting are completed by on-site personnel and the lead
Client requirement communication and quoting
Commercial and cost
Usage and quotation calculation can be assisted (editorial judgment)
Fence gate and accessory installation is carried out by on-site personnel
Fence gate and accessory installation
On-site layout and installation work
Installation checklists and check sheets can be assisted (editorial judgment)
Construction and safety inspection records are kept by the site and the employer
Construction and safety inspection records
Construction safety and quality responsibility
Forms and summaries can be assisted (editorial judgment)
Special operations such as welding and blasting must be carried out by a qualified party
Special operations such as welding and blasting
Construction safety and quality responsibility
Qualification and permit information retrieval can be assisted (editorial judgment)
The above are task-level judgments and evidence boundaries and do not represent a definite forecast of post numbers.
Private unit industry proxy: it differs from the non-private basis in the same industry and the two cannot be mixed.
This round obtained no national single-occupation wage for this occupation in mainland China
Post basis: responsibility boundaries and statistical classification must be checked against industry and region.
Hourly, per meter and project lump-sum bases cannot be mixed
Pay basis: daily or hourly wages, per meter pricing and project lump-sum pay cannot be compared directly.
Check against the source publication period and do not combine different years
Statistical period: industry averages from different years cannot be compared directly.
The industry basis covers multiple occupations
Industry coverage: an industry average cannot replace this occupation's wages.
Differences by city and project type are pronounced and must be checked against the project
Regional differences: a national average cannot represent a specific city and project type.
A recruitment quote is a single-employer sample and does not constitute an occupational median
Sample boundaries: a single quote is not used to replace occupational wages.
Editorial suggestion: check the actual measurement, scheduling and recording equipment; this round obtained no magnitude of their impact on this occupation's income or demand in mainland China.
Basis note: the industry average wage covers multiple occupations and cannot replace this occupation's wage distribution, nor represent per meter or project lump-sum income.
Junior high school or below education
Construction helper and carrying post
Post preparation example: check auxiliary process training and authorization; education does not determine whether one can work independently
High school or secondary vocational school education
Fence installation and repair post
Independent layout and installation require checking post training and authorization and cannot be inferred from high school or secondary vocational school education alone
Higher vocational or junior college (construction or engineering related majors)
Construction technology and measurement post
Measurement and quality duties require checking actual ability and post appointment; a junior college degree does not automatically confer authority
Cross-disciplinary (construction plus safety or measurement)
Safety and measurement specialist post
Needs to be filled in: excavation safety and measurement review training
Editorial suggestion: look at fence project announcements in the target region and check whether hiring is still open, the project period and the hours
Editorial suggestion: check whether residential and garden projects include installation, repair and gate steps
Editorial suggestion: check the fence materials, season and site conditions of agricultural and ranch projects
National Bureau of Statistics: average wage of urban unit employees (industry category, publication index)|https://www.stats.gov.cn/sj/zxfb/
Construction (industry proxy)
This round obtained no national single-occupation wage; the following annual average wage of construction urban units is only an industry proxy.
The following uses the average wage of the "construction" industry as an industry background proxy and cannot replace this occupation's wages; if you see recruitment figures, first check whether they are priced by the day, by the meter or as a project lump sum.
National Bureau of Statistics: 2025 average wage of urban unit employees (construction)|https://www.stats.gov.cn/sj/zxfb/202605/t20260515_1963707.html
Do not replace this occupation's wages with an industry average wage or a single recruitment quote.
National (industry proxy)
Insufficient evidence: no national single-occupation monthly or daily wage statistic precisely corresponding to this occupation in mainland China was obtained; this page provides only the industry average wage as background (non-private 92,036 yuan/year and private 66,275 yuan/year, 2025), which cannot be converted into a specific post's daily wage or per meter income.
Project type and post
Insufficient evidence: no verifiable monthly salary statistics were obtained for residential fencing, municipal barrier and ranch fencing posts in mainland China; recruitment announcement quotes are mostly single-employer samples and are often on a per meter or project lump-sum basis, so they cannot represent occupational wages.
Other regions and employment models
Insufficient evidence: no verifiable monthly salary statistics were obtained for other regions and employment models (long-term hired workers, seasonal work and labor outsourcing); differences across cities, project types and scale are large and must be checked against the project.
Editorial suggestion: look separately at announcements from construction enterprises, fence contractors and construction crews; this round obtained no national share, and a United States occupational name is not used to judge mainland China classification and qualifications.
United States O*NET and BLS statistical basis note|https://www.bls.gov/oes/
Growth of 5.6% (2025—2035, BLS47-4031)
Median hourly wage 23.07 USD; median annual wage 47,980 USD (2025, BLS OEWS, presented via O*NET)
Wage · 10th percentile|below 35,810 USD per year; national 10th percentile for the precise occupation (47-4031)|not an entry-level starting salary.
Below 40,400 USD per year
Wage · 25th percentile|below 40,400 USD per year; national 25th percentile for the precise occupation (47-4031)|not an entry-level starting salary.
Wage · median|47,980 USD per year; median hourly wage 23.07 USD (May 2025 OEWS)|half of practitioners earn below and half above this value.
Below 58,610 USD per year
Wage · 75th percentile|below 58,610 USD per year; national 75th percentile for 47-4031|includes qualifying piece rates, excludes overtime premiums, and does not equal self-employed contracting income.
Wage · 90th percentile|above 70,010 USD per year; national 90th percentile for the precise occupation (47-4031)|does not represent the overall upper limit of this occupation.
30,600 people (2025)
Employment · employment size|30,600 people; BLS 2025 47-4031|not OEWS salaried employment or current recruitment volume.
Growth of 5.6% (2025—2035)
Employment · growth rate|5.6% (2025—2035); BLS precise occupation 47-4031|not a hiring probability.
Employment · projected job openings|2,500 per year; 2025—2035 projection period average, including replacement needs|does not equal net new posts.
The above are United States Fence Erectors (O*NET-SOC 47-4031.00, SOC 47-4031) occupational statistics; industry-specific wages were not obtained this time and do not represent wage levels or job demand in mainland China.
The May2025 national annual wage percentile values are 35,810, 40,400, 47,980, 58,610 and 70,010 USD, with a median hourly wage of 23.07 USD. BLS Table1.2, SOC47-4031: 2025 employment 30,600; 2025—2035 growth of 5.6%, with an estimated average of 2,500 openings per year, including replacement needs. That row has no OOH link, and an adjacent occupation group is not substituted. OEWS excludes self-employed contractors and cannot be taken as project business revenue.
The median is the midpoint of the wage distribution of practitioners within the same statistical period, not a starting salary; schedules for this occupation are mainly fixed shifts with some seasonal work, and some work is priced per meter or per project, so personal income must be judged together with the pay method and actual hours (O*NET work context shows 89% of respondents work 40 hours per week, 11% more than 40 hours, and 27% seasonal work).
BLS Table1.2, SOC47-4031: 2025 employment 30,600; 2025—2035 growth of 5.6%, with an estimated average of 2,500 openings per year, including replacement needs. That row has no OOH link, and an adjacent occupation group is not substituted.
Employment and growth
O*NET Job Zone1–2, SVP below 6.0; the education survey for this occupation shows high school 48% and below high school 29%. The Job Zone statement about high school/GED and a few days to one year of training is a group-level description; BLS lists 47-4031 as requiring no formal credential, no related experience and moderate-term on-the-job training. Statistical typical conditions do not replace special qualifications or specific employer requirements.
Growth of 5.6% (2025—2035)
Construction and fence contracting
This round obtained no median wage for this occupation in that industry
O*NET tasks support the fence construction scenario, but this round obtained no current industry post share or precise industry wage.
Residential and garden fencing
This round obtained no median wage for this occupation in that industry
Editorial job-search direction: residential and garden fencing; no national wage or post share was obtained for that scenario.
Agricultural and ranch fencing
This round obtained no median wage for this occupation in that industry
Editorial job-search direction: agricultural and ranch fencing; no national wage or post share was obtained for that scenario.
Transportation and municipal and other industries
This round obtained no median wage for this occupation in that industry
Editorial job-search direction: transportation and municipal fencing; the occupational classification should be checked against actual duties, and no precise industry wage was obtained.
The national median is not a starting salary; the industry wages listed were not obtained this round, which does not mean the official source never published them, and adjacent occupations are not used to fill them in.
Statistics for this occupation give both hourly and annual median wages, but the two cannot be used to derive personal take-home income; the pay method (daily or hourly, per meter pricing or project lump sum) and seasonal arrangements all affect actual income.
The percentile values come from the May2025 OEWS national 47-4031 listed by O*NET; the projection comes from the 2025—2035 precise row of BLS Table1.2, and annual openings include replacement.
Project type and scale, region, pay method and seasonal arrangements all affect actual income; different bases cannot be mixed.
47,980 USD per year (median hourly wage 23.07 USD, 2025)
Low end: the 10th percentile for the precise occupation is below 35,810 USD per year, at the low end of the distribution, and is not a starting salary.
Median: 47,980 USD per year (median hourly wage 23.07 USD, 2025); half of practitioners earn below and half above this value.
High end: the 90th percentile for the precise occupation is above 70,010 USD per year, usually related to skills and qualifications, project type and region.
The official interest code is mainly R (Realistic), with some C (Conventional): corresponding to outdoor physical and tool work and to working according to drawings and specification processes. Interest codes only describe activity preferences and do not represent capability, hiring or construction qualification conclusions.
Official occupational interest code (O*NET)
Treating "liking the outdoors and tools" as the only motive; if you do not accept outdoor work in all weather, carrying work with kneeling, crouching and bending physical intensity, or are unwilling to confirm underground utilities and safety according to the procedures, the work experience and risks will be greatly affected.
Editorial observation suggestion: reliably carrying out drawings and safety checklists and accepting dimension review and feedback; this round obtained no predictive validity research on the Big Five in this occupation.
Personality model (not an occupational standard)
Treating personality test results as a career conclusion, or excluding yourself on that basis.
The occupational interest information on this page comes from the O*NET interest code RC for Fence Erectors (47-4031.00); it describes work activity preferences, is not an individual assessment result, and cannot be used to infer fit or hiring likelihood.
MBTI is used only for reflecting on collaboration preferences; this round obtained no predictive validity evidence for this occupation, and type is not used to replace observation of layout, correction and procedure execution.
Mainly Realistic (R), with Conventional (C) — oriented toward outdoor physical and tool work and toward working according to process standards.
Personality preference framework (not an occupational standard)
R (Realistic), C (Conventional)
Using a type label to explain that you are unsuited to outdoor work or unwilling to build according to standards.
The Enneagram is a self-reflection tool. More practical questions for this work are: can you maintain precision through repetitive layout and post work, and stop and report according to the procedures when utility or geological abnormalities are found; these questions can be verified directly in real construction work.
Personality framework (not an occupational standard)
Treating a type description as proof of occupational fit.
O*NET Job Zone1–2, SVP below 6.0; the education survey for this occupation shows high school 48% and below high school 29%. The Job Zone statement about high school/GED and a few days to one year of training is a group-level description; BLS lists 47-4031 as requiring no formal credential, no related experience and moderate-term on-the-job training. Statistical typical conditions do not replace special qualifications or specific employer requirements.
Official occupational knowledge and preparation level (O*NET)
Treating one test result as the ceiling of your ability.
Editorial observation suggestion: attention to abnormality handover, procedure execution under rush pressure, and collaboration; this round obtained no validity evidence of EQ scales for performance in this occupation.
Generic capability framework
Replacing verification of construction quality and safety procedures with a high or low emotional intelligence label.
The following is a work-style observation checklist and does not constitute a personality diagnosis, capability score or construction safety conclusion; occupational judgment must still be checked against real construction work, special qualifications and employer rules.
The focus of judgment is not "whether you like working outdoors", but whether you can complete layout, excavation, posts and mesh installation according to drawings and safety procedures over the long term and stop and report when utility, geological or height risks are found. Interest and personality frameworks can only suggest directions for observation and cannot replace verification in real construction work.
Prefers wooden structure making
Would rather do wooden structures and fit-out than fence installation
Cement masons and concrete finishers
Prefers concrete work
Would rather do concrete pouring and finishing than fence installation
Construction laborers
Prefers general site work
Would rather do cleaning and carrying than specialized installation
Drywall and ceiling tile installers
Would rather do indoor panels and ceilings than outdoor construction
Would rather do electrical wiring and equipment installation
Landscaping and groundskeeping workers
Prefers planting and upkeep
Would rather do planting and upkeep than fence construction
No. Interest tests only describe preferences, do not measure ability, and do not predict hiring or performance. They can be used to explain your inclination toward outdoor physical and tool work, but whether you are suited must be verified in real construction work: whether you can lay out according to drawings, whether you can correct posts, and whether you can protect according to the procedures and confirm utilities.
Specific drawing viewing, recording systems and programming requirements should be read from the target announcement; this round obtained no data on digital adoption trends or changes in hiring requirements.
A more accurate statement is that caution and collaboration are needed: maintaining precision in repetitive work, handing over site abnormalities clearly with the foreman and colleagues, and still working according to safety procedures under rush pressure. These abilities can be observed and trained through construction practice and are not personality thresholds.
Whether you are suited depends on tasks and physical condition rather than a personality label. This work requires long periods of standing (standing continually or almost continually 60% in O*NET work context), kneeling, crouching and bending (48%) and carrying, and works outdoors in all weather (76% every day) and at height (48% every day). Being introverted is no obstacle, but if you completely reject outdoor weather, physical intensity or working near hazardous equipment, the work experience will be affected.
O*NET Job Zone1–2, SVP below 6.0; the education survey for this occupation shows high school 48% and below high school 29%. The Job Zone statement about high school/GED and a few days to one year of training is a group-level description; BLS lists 47-4031 as requiring no formal credential, no related experience and moderate-term on-the-job training. Statistical typical conditions do not replace special qualifications or specific employer requirements. In mainland China, education, experience, training and special qualifications are checked item by item against the target announcement and effective rules, and this round obtained no national recruitment requirements distribution.
Yes, but it takes time. Common tools include shovels and post hole diggers, power augers, levels and plumb bobs, cutting and welding tools, and concrete mixing tools; at the entry stage you should at least complete the layout, excavation, post setting and mesh installation for one section of fence under mentoring and keep records.
Both paths are feasible: with construction or installation experience you need to add measurement and layout, fence type characteristics and safety procedures; without experience you need to add tool use and the basics of excavation and foundation construction. The key is to demonstrate building to drawing, precision control and safety compliance in construction practice.
It matters. Participating in one complete installation project on a fence project or construction site exposes you to real layout, excavation, post setting and gate installation processes and produces presentable construction and inspection records; these experiences show better than merely attending classes whether you can handle the daily work of this occupation.
O*NET work context shows this occupation is mainly outdoor physical work: outdoors exposed to all weather conditions every day 76%, standing continually or almost continually 60%, kneeling, crouching or bending 48%, bending or twisting the body 33%, repetitive motions 31% (another 58% more than half the time); daily exposure to hazardous equipment 61%, daily work at height 48%; 99% wear protective equipment every day; responsibility for the health and safety of others is very high (82%) or high (13%); the consequence of error is extremely serious (57%) or serious (33%); work schedules are fixed shifts 55% with 27% seasonal. Specific shifts, seasonal arrangements and safety requirements must be verified with the employer.
No. Tests can only suggest interest directions, and career choice still requires checking real tasks, special qualification requirements, protection and safety inspection arrangements, and performance in this page's exercises; it is suggested that you verify with participation in one real fence installation and one construction record drill.
Willing to confirm item by item according to drawings and checklists, rather than laying out and setting posts from experience
Able to stop work and report when utility, geological or height risks are found, rather than taking the risk and continuing
Accepts a rhythm based mainly on outdoor physical work and fixed shifts, where the results are mostly deliverable fences and traceable construction records
Used to check this occupation's identity, task scope and preparation level
Used to check tasks, work context and technology tools
Used to check the United States employment and wage statistical basis
Used to check the wage distribution and statistical basis
Used to check construction and engineering training and education entry points
Used to check the proportions of exposure to weather, hazardous equipment and heights
Used to check differences in pay and compensation bases
Used to check technical skills and preparation level data
This page does not replace the requirements to confirm underground pipes and cables before excavation, construction and excavation safety requirements, work at height and protective equipment requirements, power tool and welding safety requirements, electrical safety requirements, or employment and wage and hour rules; matters involving utilities, structural safety, blasting qualifications and contract settlement must be carried out by workers and employers according to the utility owner, special qualifications and competent authority requirements.
Editorial check direction: utilities, excavation and heights, tools and welding, weather and dust, settlement and rework. The tasks and work context support attending to these scenarios and do not provide accident rates or estimates of measure effects.
The risks are check directions summarized from occupational tasks and work context and cannot serve as safety procedures or the original legal text; NIST does not prove physical construction risks.
Underground utility and cable risk
May cause power or water outages, gas leaks or casualties
Confirm the location of underground pipes and cables according to the rules before excavation, and where necessary have the utility owner confirm on site before working
Digging from experience without confirming utility locations
Excavation and fall from height risk
May lead to falls, collapse or crushing injuries
Before excavation and work at height, trained and authorized personnel check protection and conditions according to the effective site plan; support, sloping or tie-off methods are not determined from this page.
Unsupported excavation or failure to use protection according to the procedures
Tool and welding injury risk
May lead to cuts, crushing or burns
Use power tools and welding equipment according to the procedures, inspect before work and wear protective equipment
Missing guards or failure to wear protection as required
Weather and dust and chemical exposure risk
May lead to heat stroke, frostbite or respiratory irritation
Arrange work and rest according to the weather, and take dust suppression and respiratory protection measures for dusty work
Long periods of work in high or low temperatures, and dust and concrete exposure
Quotation and settlement basis risk
May affect take-home income and project settlement
Make the daily, per meter or per project pricing rules and change process clear, and keep acceptance and settlement evidence
Unclear pricing basis or change agreement
Quality and rework risk
May lead to leaning fences, gates that do not close, or rework
Check post plumb and mesh tension against drawings and specifications, and self-inspect after completion and keep records
Skipping correction and self-inspection steps to rush the work
Used to check occupational identity and task scope
Used to check occupational tasks and work context
Used to check the proportions of exposure to weather, hazardous equipment and heights
Used to check AI risk governance and human oversight requirements
Used to check the employment projection and wage statistical basis
| Write out fence repair and acceptance key points |
| Leans toward a repair scenario, requiring attention to judgment and records |
| Measurement and layout post | Measure and lay out according to drawings and verify dimensions and elevations | Measurement and verification records | Write out a measurement, layout and verification sheet | Leans toward a technical scenario, requiring attention to measurement and review |
| Foreman and crew management post | Assign tasks, review process quality and safety and hand over | Quality and safety records | Prepare a process inspection and handover sheet | Leans toward a crew-leading scenario, requiring attention to records and review |
Employer requirements: education and experience
Check education, construction experience and certificate requirements, and record the announcement date and whether hiring is still open.
Distinguish "willing to work outdoors" from "able to complete the process according to drawings and safety procedures", and do not replace standards and records with interest.
Employer requirements: qualification and safety conditions
Check local qualification requirements for special operations such as excavation, work at height and welding, and whether safety training and protective equipment are needed.
Record the requirements and their validity period; changing regions or projects requires re-verification.
O*NET preparation level
O*NET Job Zone1–2, SVP below 6.0; the education survey for this occupation shows high school 48% and below high school 29%. The Job Zone statement about high school/GED and a few days to one year of training is a group-level description; BLS lists 47-4031 as requiring no formal credential, no related experience and moderate-term on-the-job training. Statistical typical conditions do not replace special qualifications or specific employer requirements.
The preparation level describes the occupation overall and does not represent the qualification conditions of a specific project or employer.
Employer requirements: tools and equipment
Check the need to use shovels and post hole diggers, power augers, levels and plumb bobs, cutting and welding tools, and concrete mixing tools.
List the actual use scenarios, and do not replace construction and safety ability with a tool list.
Material one: fictional fence installation assignment
Give the fence type and total length, site conditions and underground utilities, schedule and weather constraints, available tools and material list, safety and protection requirements to observe, and the client's expectations for style and price, as the input for this exercise.
Mark units and missing items and state that the material is entirely fictional.
List the missing information that may affect the judgment.
State that the exercise uses fictional materials and does not represent any real project, enterprise or employer.
Checkable output: work sequence and layout key points, the construction method for posts and foundations, the site information that needs to be recorded and verified, situations that must be stopped and confirmed with a supervisor or specialist, and protection and safety key points.
State the boundary: engineering and construction safety conclusions must be made by specially qualified personnel, the utility owner or competent authorities.
Material two: construction task (fictional)
Requires writing out the work sequence and layout key points, the construction method for posts and foundations, and the site information that needs to be recorded and verified, and stating which situations must be stopped and confirmed with a supervisor or specialist.
Exercise output: an executable construction sequence and check points.
Material three: reference approach excerpt (fictional)
First confirm underground utilities and site conditions, then lay out according to drawings and excavate and set posts section by section, and finally install rails and mesh, correct them and deliver.
For utility or geological questions that cannot be confirmed, keep them unknown and ask the utility owner or a specialist to confirm, rather than continuing from experience.
State that the reference approach is only an example and not the only correct method.
Material four: boundary statement
This exercise does not constitute an engineering, construction safety or safe operation conclusion; utility confirmation and special operations are carried out by the utility owner, specially qualified personnel or competent authorities according to the procedures.
Work one: post requirement comparison table
List the education, experience and certificate requirements of the target announcement item by item in a comparison table.
Mark the items already met, to be completed and to be verified.
Work two: reviewable construction key points
Choose a fictional fence type and write out layout, post and mesh installation key points.
Show the ability to identify utility and safety risks and stop and report.
Work three: one-page construction and inspection summary
Record layout dimensions, material usage, and safety and self-inspection on one page.
Mark the source basis and the parts that could not be verified.
Work four: tool and material notes
Describe the tools, drawings and inspection methods used so that others can review it.
Mark which steps used AI assistance and were manually verified.
| Scenario | Questions that may be asked | Evidence that can be shown | Conclusions that cannot be inferred from this |
|---|---|---|---|
| Interview | Whether you can explain the method and basis for layout and post correction. | Check whether you can explain the construction method according to drawings and procedures. | Whether to hire is judged by the employer, not decided by the applicant. |
| Site interview or trial work | Whether you can complete the layout, excavation and installation of one section of fence to standard. | Use construction and self-inspection records to show compliance. | One trial work does not mean you can independently take on all processes. |
| Probation assessment | Whether safety and inspection can be carried out according to the procedures and abnormalities reported honestly. | Use safety and inspection records to show traceability. | Short-term performance does not represent long-term construction capability. |
| After joining | Whether special operations can be carried out according to qualification and rule requirements and documented. | Use qualification and inspection records to show traceability. | Following the procedures does not replace special qualification and competent authority requirements. |
Day 1: read a drawing or construction requirement
Excerpt one dimension or safety requirement and write out the execution key points.
Day 2: write layout and excavation key points
Write out layout, excavation and post key points by fence type.
Day 3: write a construction record template
List the information that needs to be recorded for dimensions, materials and inspection.
Day 4: write safety protection key points
Write out utility confirmation, excavation support and height protection key points.
Day 5: write tool inspection key points
Write out inspection and use key points for power tools and cutting and welding equipment.
Day 6: ask someone to challenge you
Ask an experienced construction worker or foreman to point out process and safety omissions and record the feedback.
Day 7: write your judgment
Write down whether you want to continue, what you need to make up, and which work you cannot take on yourself.
| Qualification / preparation items | Suitable groups | Its role for this occupation | Whether it is generally required | Conditions and investment | Scale of investment | What it cannot replace |
|---|---|---|---|---|---|---|
| High school diploma or equivalent | Posts where the target announcement requires high school or equivalent | Meets the basic entry conditions | 48% in the O*NET survey, not a uniform BLS education threshold | According to employer and project requirements | Accumulated on the job | A higher or lower education level does not equal construction and safety ability |
| Education below high school | Some auxiliary posts | About 29% in the O*NET education survey | Not generally required | According to employer and project requirements | A few days to several months | Experience does not equal being able to take on special operations independently |
| On-the-job training and mentoring | Most entry-level posts | Meets basic process and safety requirements | Generally required | Employer or project training | A few days to one year | Training does not equal holding a special qualification |
| Measurement and layout training | Posts involving layout and quality verification | Determines whether one can independently complete positioning and checking | Not generally required | Post training or courses | Several weeks to several months | Measurement ability does not equal being able to take on structural design |
| Welding operation qualification | Posts involving metal fence welding | Meets the qualification requirements for the special operation | Depends on project and local requirements | According to qualification training and assessment | Several weeks to several months | This page does not replace special qualification requirements |
| Excavation and work at height safety training | Posts involving excavation and work at height | Meets safe operation and protection requirements | Depends on project and local requirements | Employer or institution training | Several hours to several days | Training does not exempt the need for utility owner confirmation |
The education, experience and certificate requirements in recruitment or cooperation conditions must be read item by item; the relaxation of one does not mean the others can be substituted.
Education, training certificates and special qualifications are different levels: completing training or obtaining a degree does not equal holding welding, blasting or work at height qualifications.
Construction safety, special qualifications and employment requirements differ by region and project, and crossing regions, changing projects or adding special operations requires re-verification.
This page does not replace the requirements to confirm underground pipes and cables before excavation, construction and excavation safety requirements, work at height and protective equipment requirements, power tool and welding safety requirements, electrical safety requirements, or employment and wage and hour rules; work and handling decisions are subject to the utility owner, special qualifications and competent authority requirements, and this page does not provide engineering, construction safety or legal advice.
Entering this occupation is not just attending one training session: first check the fence type and work content, whether excavation and concrete are included, whether welding or rock handling is required, underground utility confirmation and safety training requirements, provision of protective equipment and work at height arrangements, and the pay and settlement method, and record the announcement date and whether hiring is still open.
The education, experience and qualification requirements in recruitment conditions must be read side by side; the relaxation of one item does not mean the others can be substituted.
Qualification, safety and special operation requirements are verified against local laws and regulations, special qualifications and the original employer rules; this page does not replace any engineering, construction safety or legal advice.
Able to complete carrying, cleaning and excavation assistance under mentoring and record it honestly.
Construction helper support
Able to independently complete layout, posts, mesh installation and basic repairs.
Fence installation and repair post
Able to measure and lay out, verify dimensions and complete gate and accessory installation according to standards.
Measurement and layout post
Able to lead a crew, assign tasks, review process quality and safety and manage progress.
Foreman and crew management post
O*NET Job Zone1–2, SVP below 6.0; the education survey for this occupation shows high school 48% and below high school 29%. The Job Zone statement about high school/GED and a few days to one year of training is a group-level description; BLS lists 47-4031 as requiring no formal credential, no related experience and moderate-term on-the-job training. Statistical typical conditions do not replace special qualifications or specific employer requirements. In mainland China, requirements are read from announcements item by item, and a national usual requirement is not inferred from this.
Education, training and special qualifications are different levels; completing training or obtaining a degree does not equal holding welding, blasting or work at height qualifications; construction safety and employment requirements differ by region and project and must be re-verified. This page does not replace utility owner, special qualification and competent authority requirements.
This page lists both United States official occupational data and industry background information for mainland China; education, qualification and safety requirements in the two places are checked separately.
The United States preparation level and work context are statistical background; mainland China classification, certification, training, health and employment requirements must be checked separately against actual posts and the effective original text, and this round obtained no precise national correspondence classification.
Used to check United States wages, employment and outlook
Used to check occupational tasks, work context and preparation level
Used to check the boundary of OEWS salaried wage statistics
Used to check the precise 47-4031 projection and typical training classification
Mainly based on construction experience, checked against employer and project requirements
Independently complete excavation assistance for one section of fence
Work and training records (editorial suggestion)
Complete excavation assistance, carrying and site cleaning as a crew
Construction helper post
Mainly based on installation experience and measurement basics
Complete the installation of one section of fence according to drawings
Construction and self-inspection records (editorial suggestion)
Independently complete layout, posts and mesh installation
Fence installation post
Mainly based on repair experience
Take responsibility for fence and gate repair
Repair and acceptance records (editorial suggestion)
Diagnose and repair damage to fences and gates
Fence and gate repair post
Mainly based on experience and employer appointment
Develop toward crew management
Quality and safety records (editorial suggestion)
Assign tasks, review process quality and safety and hand over
Foreman and crew management post
Mainly based on measurement skills
Take responsibility for layout and dimension verification
Measurement and verification records (editorial suggestion)
Measure and lay out according to drawings and verify dimensions and elevations
Measurement and layout post
Mainly based on welding qualifications and experience
Take responsibility for metal fence welding work
Welding and inspection records (editorial suggestion)
Complete metal part welding and installation according to qualifications
Metal fence and welding post
Mainly based on equipment and safety knowledge
Take responsibility for equipment maintenance and safety inspection
Equipment and safety records (editorial suggestion)
Maintain power equipment and carry out safety inspection
Equipment and safety specialist post
Mainly based on qualifications and experience
Develop toward construction technical management
System and inspection records (editorial suggestion)
Responsible for process quality, measurement and safety technical execution
Construction technology and quality lead
Mainly based on municipal construction experience
Take responsibility for municipal barrier installation and acceptance
Construction and acceptance records (editorial suggestion)
Install municipal and traffic barriers according to standards
Municipal and traffic barrier post
Mainly based on ranch construction experience
Take responsibility for agricultural and ranch fencing project construction
Construction and repair records (editorial suggestion)
Build and repair ranch and farmland fences
Ranch and farmland fence post
Mainly based on costing and construction experience
Take responsibility for site survey and quoting
Estimating and quotation records (editorial suggestion)
Conduct site surveys, estimate materials and labor and quote
Contracting and quoting post
Mainly based on experience and employer appointment
Develop toward project management
Organization and assessment records (editorial suggestion)
Responsible for construction organization, costs and the safety system
BLS Table1.2, SOC47-4031: 2025 employment 30,600; 2025—2035 growth of 5.6%, with an estimated average of 2,500 openings per year, including replacement needs. That row has no OOH link, and an adjacent occupation group is not substituted. The May2025 median annual wage is 47,980 USD; the mainland China construction proxy does not represent occupational wages.
The BLS precise occupation is projected to grow 5.6%; this round obtained no separate contributions from residential, municipal and repair demand, and this does not equal current recruitment volume.
A projection is not an actual outcome and does not represent hiring volume in a particular region or project type
Fence Erectors (SOC 47-4031, precise occupation)
Growth of 5.6% (2025—2035)
Employment size and openings are not the same measure; openings are the projected annual average and include replacement needs
Statistics for the precise occupation; differences by region, project type and scale are large
Fence Erectors (SOC 47-4031, precise occupation)
The industry average wage covers multiple occupations and cannot replace this occupation's wages
An industry category basis that does not include a single-occupation wage distribution
Industry wage (industry proxy)
Construction (industry category)
Non-private 92,036 yuan/year; private 66,275 yuan/year
Used to check the United States employment and wage statistical basis
Used to check United States employment projections and job openings
Used to check the National Bureau of Statistics industry average wage basis
Used to check occupational tasks and preparation level
Needs to be filled in: wooden structure and drafting ability
Measurement and tool operation experience
Adjacent direction, from fence construction to wooden structure making
Needs to be filled in: concrete pouring and finishing ability
Foundation construction and leveling experience
Adjacent direction, from post foundations to concrete work
Needs to be filled in: general site work skills
Carrying and safety cooperation experience
Adjacent direction, from specialized installation to general construction
Needs to be filled in: indoor panel and ceiling installation skills
Dimension measurement and installation experience
Adjacent direction, from outdoor construction to indoor fit-out
Needs to be filled in: electrical installation and electrical safety ability
Understanding of utilities and safe work
Adjacent direction, from fence construction to electrical installation
Needs to be filled in: planting and upkeep ability
Outdoor work and machinery use experience
Adjacent direction, from structure construction to planting and upkeep
Needs to be filled in: roof waterproofing and sloped surface work ability
Work at height and protection experience
Adjacent direction, from fence construction to roofing
Needs to be filled in: task assignment and safety supervision ability
Understanding of construction processes and safety requirements
Adjacent direction, from frontline construction to crew supervision
United States O*NET-SOC 47-4031.00 "Fence Erectors", corresponding to SOC 47-4031, in Job Zone 1–2 (SVP below 6.0), interest code RC, and flagged as Bright Outlook; the median wage and percentiles are BLS OEWS estimates for this precise occupation (May 2025, presented via O*NET); employment and growth are on the BLS 2024—2034 projection basis presented by O*NET. The BLS Occupational Outlook Handbook does not list this occupation separately, so this page does not provide a second BLS OOH group basis, and the relevant boundaries are marked in the source register.
In 2025 the median hourly wage was 23.07 USD and the median annual wage 47,980 USD; the 10th, 25th, 75th and 90th percentiles were about 35,810, 40,400, 58,610 and 70,010 USD per year (May 2025 OEWS, precise occupation 47-4031, presented via O*NET). Officials have not published an industry-specific median wage for this occupation, and this page keeps the gap rather than filling it in.
The 2024—2034 projection basis presented by O*NET: employment about 26,400 (2024), projected to grow faster than average (5% to 6%), with an estimated average of about 2,300 job openings per year (this value is the projected annual average and includes replacement needs). The BLS Occupational Outlook Handbook does not list this occupation separately, so this page does not provide a second BLS OOH group basis, and the relevant basis boundaries are stated in the source notes and basis notes.
The National Bureau of Statistics data checked this time are on an industry category basis, and no national single-occupation wage statistic precisely corresponding to this occupation was obtained; this page uses the average wage of "construction" urban units (2025 non-private 92,036 yuan/year, private 66,275 yuan/year) as an industry proxy, which only describes the industry background, and does not replace occupational wages with an industry average or a single recruitment quote.
O*NET lists this occupation as Job Zone 1–2 (little to some preparation), SVP below 6.0; in the education survey about 48% indicated that a high school diploma or equivalent is needed and 29% indicated below a high school diploma. Related occupational training usually requires a high school or GED credential, with pre-employment training ranging from a few days to one year. Special operations such as welding, excavation and work at height require training and the corresponding qualification according to local requirements; special operations such as blasting must follow special permit requirements. In mainland China, construction experience plus post training is commonly required, and the specifics are subject to recruitment announcements and local provisions.
A more accurate judgment is that some tasks will be assisted by tools and that the occupation as a whole will mainly see augmentation and structural adjustment. A 2023 ILO study shows that task exposure varies widely across occupations and that technical feasibility does not mean enterprises have already adopted it; meanwhile layout and positioning, post correction, excavation and work at height, and underground utility and geological judgment require on-site experience and responsibility, so the conclusion is that the way of working will change rather than that the occupation as a whole will be replaced.
No. The median is the midpoint of the wage distribution of practitioners within the same statistical period, not a starting salary. Schedules for this occupation are mainly fixed shifts with some seasonal work, and some work is priced per meter or per project; personal income must be judged together with the pay method (daily or hourly, per meter pricing or project lump sum) and actual hours (O*NET work context shows 89% of respondents work 40 hours per week, 11% more than 40 hours, and 27% seasonal work).
Yes. Related occupational training shows that pre-employment training for this occupation ranges from a few days to one year, and most posts are taken up through mentoring. However, posts involving welding, excavation and work at height usually require safety training and special qualifications; underground utility confirmation must be carried out according to utility owner and competent authority requirements. Whether it is feasible depends on the target employer and local provisions, and this page does not replace the original regulations and does not provide engineering or construction safety advice.
FermatMind career content research process
This round checked O*NET47-4031 tasks, work context, RC, education and May2025 quintiles; BLS Table1.2 2025—2035; the National Bureau of Statistics 2025 construction wages; the OEWS definition; and the scope of ILO global exposure and the NIST voluntary framework.
No precise mainland China occupational wage, national recruitment requirements distribution, precise industry wage, measured AI effects for this occupation or local construction qualification procedures were obtained. The construction 92036/66275 yuan are only annual average wages for urban units by industry. The Hero and FAQ and the shared old projections and source conflicts are protected, the Job Zone group-level statement and the precise BLS typical conditions are kept separate, and whole-page consistency is not asserted.
Official occupational scope: building and repairing fences and fence gates using hand and power tools.
Interest code RC; preparation level Job Zone 1–2 (SVP below 6.0); education survey: high school diploma or equivalent 48%, below a high school diploma 29%; the occupation is flagged as Bright Outlook.
Wages and employment trends (citing BLS data): 2025 median hourly wage 23.07 USD and median annual wage 47,980 USD; 2024 employment 26,400; 2024—2034 projected to grow faster than average (5% to 6%); estimated average of about 2,300 job openings per year; the main industry in 2024 is construction.
O*NET OnLine
United States
current page (updated 2026); accessed 2026-09-20
official occupation profile
exact occupation (SOC 47-4031)
United States occupational data do not automatically imply construction safety, special qualification or employment requirements in mainland China.
2026-09-20
Used to check tasks, work activities, work context, technical skills, interest code (RC) and preparation level (Job Zone 1–2).
Tasks mainly involve confirming there are no cables or water pipes in the area, measuring and laying out according to drawings and marking post positions, digging post holes, setting and correcting posts, pouring or backfilling to fix, installing rails and braces, stretching the mesh, assembling and installing fence gates, building structures such as retaining walls and trellises, and discussing needs with clients and quoting; some work involves portable gas welding, and in special cases rock may be handled by blasting.
Work context: work schedules fixed shifts 55% and seasonal 27%; 40 hours per week 89% and more than 40 hours 11%; standing continually or almost continually 60%, kneeling, crouching or bending 48%, bending or twisting the body 33%, repetitive motions 31% (another 58% more than half the time); daily exposure to outdoor weather 76%, hazardous equipment 61%, heights 48%; 99% wear protective equipment every day; responsibility for the health and safety of others very high 82% and high 13%; the consequence of error extremely serious 57% and serious 33%; considering exactness and accuracy extremely important 37% and very important 34%.
The O*NET national wage page (onetonline.org/link/localwages/47-4031.00) gives this occupation's national percentiles: annual wage 10% 35,810 USD, 25% 40,400 USD, median 47,980 USD, 75% 58,610 USD, 90% 70,010 USD; hourly wages 17.22, 19.43, 23.07, 28.18 and 33.66 USD respectively.
O*NET OnLine
United States
current page (updated 2026); accessed 2026-09-20
official occupation details and national wages
exact occupation (SOC 47-4031)
Applies only to the occupational description; excavation safety, underground utility confirmation, and welding and work at height qualifications must be verified separately against special qualifications and competent authority requirements.
2026-09-20
Precise occupation 47-4031 (presented via O*NET): 2024 employment 26,400, 2024—2034 projected to grow faster than average (5% to 6%), with an estimated average of about 2,300 job openings per year.
"Occupational openings" in the BLS employment projections table is an annual average for the projection period, and this page marks it as "/year" accordingly and does not interpret it as a ten-year cumulative figure.
The BLS Occupational Outlook Handbook does not list this occupation separately, so this page does not provide a second BLS OOH group basis.
U.S. Bureau of Labor Statistics
United States
2024—2034 projections as presented by O*NET OnLine; accessed 2026-09-20
official employment projections
exact occupation (SOC 47-4031)
A projection is not an actual outcome; the average annual openings include replacement needs and cannot be broken down into individual hiring probability; this occupation is not covered in detail in the BLS OOH.
2026-09-20
Median hourly wage 23.07 USD and median annual wage 47,980 USD.
The 10th, 25th, 75th and 90th percentiles are about 35,810, 40,400, 58,610 and 70,010 USD per year respectively (presented via the O*NET national wage page; hourly wages 17.22, 19.43, 28.18 and 33.66 USD).
Officials have not published an industry-specific median wage for this occupation.
U.S. Bureau of Labor Statistics
United States
May 2025 wage data; accessed 2026-09-20
official wage statistics
exact occupation (SOC 47-4031)
This is occupation-level wage statistics; the median is not a starting salary; OEWS excludes self-employment and project lump-sum income, and seasonal arrangements also affect actual income.
2026-09-20
Urban non-private units "construction" average wage 92,036 yuan/year; urban private units 66,275 yuan/year (2025).
Mainland China does not list this occupation separately; the industry proxy value cannot replace occupational wages.
National Bureau of Statistics
Mainland China
2025 annual wage; accessed 2026-09-20
official industry proxy
industry proxy: construction
The industry average wage covers multiple occupations and cannot be taken as this occupation's median, starting salary or per meter and project lump-sum income.
2026-09-20
Conclusion: most jobs have only some tasks exposed, and generative AI is more likely to augment than to replace wholesale; clerical tasks have the highest exposure, while the share of highly exposed tasks in managerial and professional occupations is lower.
It uses a task classification method and is not enterprise adoption data.
International Labour Organization
Global
2023-08-21; accessed 2026-09-20
institutional research (working paper)
global occupational task exposure to generative AI
Task exposure does not equal actual adoption, productivity or job change; the share of highly exposed tasks in on-site installation and safety responsibility work is usually lower.
2026-09-20
The framework is intended for voluntary adoption and helps organizations incorporate trustworthiness considerations into the design, development, use and evaluation of AI.
The generative AI overview lists the specific risks of generative AI and gives corresponding management actions.
National Institute of Standards and Technology
United States / international reference
AI RMF 1.0 released 2023-01-26; GenAI Profile released 2024-07-26; accessed 2026-09-20
voluntary risk management framework
AI risk governance and human oversight
The governance framework contains no occupational or employment statistics and cannot serve as occupational outlook or employment evidence.
2026-09-20
Used to distinguish occupational facts, statistical bases, industry proxies, construction safety and special qualification boundaries, and AI assistance and human review.
This research method and editorial synthesis are marked as internal_rubric or editorial_synthesis.
FermatMind
Mainland China / United States
current authoring rules; accessed 2026-09-20
editorial method
field review and source disclosure
It is not an external occupational fact source and does not replace official statistics or jurisdictional rules.