Cement Masons and Concrete Finishers

SOC 47-2051 · O*NET 47-2051.00

O*NET 47-2051.00 · forms and pouring / levelling, finishing and forming / curing and defect repairRealistic / Conventional · physical and manual labour / building and carpentry / engineering / transportation and machinery operationU.S. data use the framing shown on this occupation page (BLS May 2025 OEWS annual and hourly, 2% growth over 2024—2034, page does not mark Bright Outlook) · this route obtained no occupational-level statistical framing for Chinese mainland
8%AI Impact ScoreFermatMind / 费马测试

Cement masons and concrete finishers level and finish surfaces, check slopes and elevations and document issues for the next crew.

Model impact index for three equally weighted representative core tasks; not a measured share of working time or a job-loss probability. floor((25+0+0)/3+0.5)=8; fermatmind-ai-impact-v1; 2026-10-18.

1.6%U.S. employment change (2025–2035, 47-2051.00 framing)BLS
204,800 people (2025)U.S. number employed (2025, 47-2051.00 framing)BLS
13,600 per yearU.S. average annual job openings (2025–2035, 47-2051.00 framing)BLS
No data availableChinese mainland salary reference (no occupational-level statistic obtained)

Quick judgment

What kind of person suits cement masons and concrete finishers?

Check drainage and elevations on a fictional slab drawing. Record a low point and the reference to verify.

Education, qualifications and authorization must be checked separately: O*NET lists this occupation as Job Zone 1-2 (little or no preparation to some preparation, SVP below 6.0), and the education survey shows 52% of respondents think less than a high school diploma is enough, 35% think a high school diploma or equivalent is needed and 13% think a postsecondary education certificate is needed; the occupation page lists 23 certifications (including Commercial/Industrial Flatwork Specialist - Surface Treatments, Aggregate Base Testing Technician, Shotcrete Nozzleman (Dry-Mix Process) and Concrete Strength Testing Technician from the American Concrete Institute International, Reinforced Concrete Special Inspector from the International Code Council, Concrete Finisher Assessment and Concrete Construction from the National Center for Construction Education and Research, and Concrete Slab Moisture Testing Technician from the International Concrete Repair Institute), and lists 3 position titles approved by the U.S. Department of Labor for registered apprenticeship (Cement Mason and Cement Mason Concrete Finisher, among others). In the United States, this occupation usually does not require a unified licence, but some states and projects have separate qualification requirements for concrete inspection and special work; in Chinese mainland, the related duties may fall within masonry, plastering and concrete work positions under a broader occupational framing, and work involving dust, noise, heat, confined spaces, temporary electrical work and machinery is subject to public rules on work safety and occupational health. Education and training, industry certification and apprenticeship experience, statutory qualification and practice eligibility, job hiring and authorization, and authority over formed-surface acceptance and stop-work decisions are five different things.

Who is more likely to fit Cement Masons and Concrete Finishers?

Conditions for pausing high investment first: you have not yet completed a full closed-loop exercise that runs from form checking and alignment, pouring, spreading and consolidation, levelling and finishing, control joints and edge treatment, to curing and defect repair; or you are unwilling to comply with dust and skin contact protection and personal protective equipment requirements, unwilling to work to procedure on equipment and energy isolation and fall protection, unwilling to stop and escalate when the weather or materials are abnormal and instead force the work; and do not treat having helped a family member finish a small patch of floor as proof that you already have the ability to control elevation, flatness and slope on a large formed surface and to cure and repair it.

When should you be cautious about choosing Cement Masons and Concrete Finishers?

One-line judgment: cement masons and concrete finishers do not just pour concrete and spread it flat; they turn fresh concrete into a formed surface that meets requirements for elevation, slope and surface quality and can be cured and repaired — checking, setting and aligning forms, signalling tanker drivers and controlling the discharge chute, organising the pour and directing spreading and consolidation, using screeds, trowels and power trowels to level, compact and finish, forming control joints, edges and trowelled or broomed surfaces, monitoring curing against wind, temperature and cold, applying hardening, sealing and waterproofing and repairs, and chipping out, levelling and pointing defects. O*NET lists this occupation as Job Zone 1-2 (little or no preparation to some preparation, SVP below 6.0), with an interest code of RC (Realistic, Conventional), and this occupation page does not mark Bright Outlook. The core boundary is that this occupation usually is not a uniformly licensed one, but crystalline silica, dust and skin contact protection, fall, excavation and machinery protection, equipment and energy isolation, personal protective equipment and inspection and stop-work authority are required separately under the jurisdiction and institutional rules; the conclusions on elevation, flatness, slope and curing of the formed surface are determined by the supervisor, the main contractor and authorised personnel according to the design documents and specifications, and are not decided by the operator alone.

How can a small experiment test your fit for Cement Masons and Concrete Finishers?

Signals to keep exploring: you can keep wearing protection and maintain your work rhythm outdoors in weather, noise and dust, and are willing to complete each step in sequence within the time window before the concrete initially sets (the O*NET work context shows 96% continuously handle and control objects and tools by hand, 82% stand continuously or almost continuously, 84% work outdoors exposed to all weather conditions every day, 55% are exposed to contaminants every day (including cement dust and alkaline materials), 63% perform repetitive motions continuously, 70% consider precision or accuracy extremely important, 86% wear common protective or safety equipment every day and 59% consider the pace determined by equipment speed extremely important), you can stop and report first rather than forcing a pour when forms are not aligned, the weather changes suddenly or equipment fails, and you are willing to write the pour, curing, inspection and stop-work records clearly and hand them over.

Career profile

Cement masons and concrete finishers level and finish surfaces, check slopes and elevations and document issues for the next crew.

Career quick answers

What categories can the work of cement masons and concrete finishers be divided into?

The work of this occupation can be divided into three categories: first, pour preparation and pouring (checking that forms are correctly constructed, setting and aligning forms to the specified slope and depth, signalling tanker drivers and moving the chute, directing the pour and supervising spreading, operating vibrators to consolidate, and installing embedded items such as anchor bolts, plates and thresholds); second, surface finishing and forming (spreading and levelling with rakes, shovels, hand or power trowels and screeds, forming expansion joints and edges with edgers, jointers and straightedges, obtaining the specified finish by brooming, trowelling or grinding, and applying hardening, sealing and waterproofing materials); third, curing, repair and inspection (monitoring the effect of wind and heat or cold on curing, chipping, scraping and grinding high spots, cutting out damaged areas and drilling holes for and positioning reinforcing bars, grouting holes and cracks and levelling them, and cleaning, judging surface condition, recording and handing over). All three share one chain built around correct forms and elevation, dense spreading and consolidation, correct surface flatness and slope and joints, and traceable curing and repair.

Pour preparation and pouring:

Pour preparation and pouring

  1. 01Check that the formwork is sound and sealed, set and align forms and elevation to the specified slope and depth
  2. 02signal the tanker driver and move the discharge chute
  3. 03organise the pour and supervise spreading and layering
  4. 04operate the vibrator to consolidate and avoid segregation and missed vibration
  5. 05install embedded items such as anchor bolts, plates and thresholds
  6. 06produce pour and equipment use records

Surface finishing and forming:

Surface finishing and forming

  1. 01Level, float, trowel and finish are organised as separate steps with different working conditions and are not all completed within one uniform window before initial set; NRMCA CIP14 distinguishes preliminary levelling from later floating/trowelling: the later finishing waits until bleeding has stopped and there is no water sheen on the surface, and the timing is judged from the concrete and the environment; do not compress pouring through curing into one uniform window before initial set and do not speed up finishing by adding water or dry cement. Joints and curing follow the design and the actual process, and technical guidance does not replace statutory specifications or project plans. Complete the specified edges/joints, curing, and self-check of flatness, slope and elevation, and record them.
Curing, repair and inspectionSchedule curing according to wind, temperature and cold effects and cover and sprinkle in good time → check flatness, slope and elevation against the design documents → record defects with location and cause and decide the repair method → chip out, clean, grout and level and re-check → escalate structural or mix design issues beyond your authority to authorised personnel → complete the curing period and handover records

Where are the boundaries between cement masons and concrete finishers and adjacent occupations?

Cement masons and concrete finishers centre on pouring, spreading, surface forming and curing of fresh concrete; brickmasons and blockmasons specialise in laying units and mortar, stonemasons in working and installing natural stone, plasterers and stucco masons in plastering and stucco finishes on walls and ceilings, terrazzo workers and finishers in terrazzo surfaces and finishing, reinforcing iron and rebar workers in cutting, tying and positioning reinforcement, and construction labourers in site assistance, material handling, cleaning and supporting the trades. Similar names or being on the same concrete and masonry site does not mean that material processes, work qualifications, acceptance or stop/resume work authority can be exchanged.

DimensionPrimary trackComparison track
Core purposeMake fresh concrete meet the design requirements for elevation, slope, flatness, surface quality and curing: verify forms and elevation so the formed surface is in the right position, use pour, consolidation and finishing records so the process is traceable, and use curing, defect repair and handover so problems are not carried into the subsequent structural and finishing trades.Core purpose
Main objects and basisThe objects are fresh concrete and grout and slurry made from cement, sand and water, forms, moulds, expansion joints and edge components, embedded items such as anchor bolts, plates and thresholds, hardening, sealing, waterproofing and repair materials, and tools and equipment such as rakes, shovels, trowels, screeds, power trowels, vibrators, saws and pneumatic breakers; the people you work with include design, supervision, main contractor and project management personnel, tanker drivers and pumping and transport personnel, rebar, formwork, mechanical and electrical and other following trades, and material suppliers. The basis is the elevation, slope, flatness and expansion joint positions specified in the design documents and construction plan, the concrete material and mix and initial set and curing requirements, the weather, wind and temperature conditions, and the statutory requirements and institutional procedures for crystalline silica, dust, noise and skin contact protection and for fall, machinery and temporary electrical protection.Main objects and basis
Core processChecking and aligning forms, organising the pour and spreading, consolidation and embedded item installation, levelling, finishing and trowelling, forming expansion joints and edges, applying finishes and surface treatments, monitoring curing conditions and covering and sprinkling, re-checking flatness, slope and elevation, chipping, repair and cleaning, and recording and handover.Core process
Main outputsForm check, alignment and elevation records, pour, spread, consolidation and equipment use records, embedded item installation and position re-check records, levelling, finishing, finish and expansion joint and edge treatment records, flatness, slope and elevation self-check and review records, curing, covering and sprinkling records, defect, repair and cleaning records, and weather, stop-work and handover records.Main outputs
Responsible partyYou carry out formwork, pouring, finishing and curing and process self-checks according to the plan; design, materials, testing, project technical and quality management and acceptance responsibilities are allocated under the applicable project rules, and not all formed-surface self-checks are excluded from this occupation, nor is the same approval chain specified for all projects. Articles 28/30/55/57—59 of China's Work Safety Law: safety training and special operation qualifications are separate, procedures must be followed and hazards reported; where an emergency directly endangering personal safety is found, the worker has the right to stop their own work or, in accordance with the law, to take emergency measures and then evacuate, without first obtaining institutional stop-work authorization. Overall project stop/resume work and project acceptance are handled separately under the applicable rules and responsibilities. Articles 24/25/27/32/36—37 of the Regulations on the Administration of Construction Project Work Safety set out general and subcontractor responsibility, list special operations, technical briefing, protection and emergency evacuation, and training, and do not describe all cutting and vibrating operations as special operations.Responsible party
Access and licensingArticles 28/30/55/57—59 of China's Work Safety Law: safety training and special operation qualifications are separate, procedures must be followed and hazards reported; where an emergency directly endangering personal safety is found, the worker has the right to stop their own work or, in accordance with the law, to take emergency measures and then evacuate, without first obtaining institutional stop-work authorization. Overall project stop/resume work and project acceptance are handled separately under the applicable rules and responsibilities. Articles 24/25/27/32/36—37 of the Regulations on the Administration of Construction Project Work Safety set out general and subcontractor responsibility, list special operations, technical briefing, protection and emergency evacuation, and training, and do not describe all cutting and vibrating operations as special operations. For U.S. construction silica dust, check OSHA1926.1153: employers implement engineering/work-practice/respiratory controls according to Table1 for the specific equipment, indoors or outdoors and shift length, or handle it through the paragraph (d) exposure assessment route; wet methods and dust collection are not freely interchangeable, and respiratory protection and medical surveillance have applicable conditions. The O*NET 55% exposure to contaminants is not a silica dust measurement, an accident rate or evidence of compliance. For U.S. concrete construction equipment, check 1926.702: hand-guided powered trowels must have a control that cuts off power automatically when the operator releases the handle; for maintenance and servicing that could start unexpectedly and injure someone, all potentially hazardous energy must be locked out and tagged out. Other equipment and cleaning tasks are confirmed under the applicable rules, the manual and the hazardous energy plan, and the industrial 1910 clauses are not applied unconditionally to construction. Statutory conditions and the actual project position's authority are confirmed separately, and training and written authorization cannot replace statutory qualification; U.S. state-by-state contracting and inspection licensing was not checked this round.Access and licensing
Boundary of the conclusionProcess records support tracing the location, elevation and slope, materials, weather and period, and do not automatically form conclusions on structural safety, mix design or final project acceptance. Formal acceptance and project resumption are handled by the corresponding responsible parties under the actual project rules; your right to stop work and evacuate in the face of an immediate danger to persons is not excluded by that division.Boundary of the conclusion

Core responsibilities

  1. 01

    Check the forms that hold the concrete to see that they are properly constructed.

  2. 02

    Set the forms that hold concrete to the desired pitch and depth, and align them.

  3. 03

    Spread, level, and smooth concrete, using rake, shovel, hand or power trowel, hand or power screed, and float.

  4. 04

    Monitor how the wind, heat, or cold affect the curing of the concrete throughout the entire process.

What must be checked item by item before starting work?

Before starting work, check at least six items: the job duties (whether they lean toward large-area pouring and finishing, kerbs, footpaths and gutters, repair and chipping and patching, terrazzo and decorative surfaces, or inspection and testing support), whether you carry responsibility for directing the pour and coordinating tankers, pumping and pour pace, the working conditions (outdoors, season, night, heat or cold) and programme, whether crystalline silica and chemical materials are involved and the related training and protection requirements, who provides equipment, tools and protective equipment and their inspection and maintenance responsibility, and the pay method (hourly, by volume or by square metre) together with how quality and rework responsibility is divided.

  1. 01

    O*NET-SOC 47-2051.00 (SOC 47-2051, cement masons and concrete finishers within the construction and extraction major group), listed as Job Zone 1-2 (little or no preparation to some preparation, SVP below 6.0), and this occupation page does not mark Bright Outlook; the interest code is RC (Realistic 100, Conventional 38), and the specific interest areas corresponding to Realistic are led by physical and manual labour (93), building and carpentry (23), engineering (20) and transportation and machinery operation (19); the O*NET industry distribution shows 93% of this occupation in construction and 7% in other industries. The official U.S. scope of 47-2051.00 is to level and finish surfaces of poured concrete floors, walkways, pavements, roads, kerbs and similar surfaces using a variety of hand and power tools, and to align forms for footpaths, kerbs and gutters, patch holes and cut expansion joints with saws. The 2022 edition of China's occupational classification code explicitly lists concrete workers as 6-29-01-03 (PDF physical page 535), with tasks covering batching and mixing, pumping and pouring, forming and formwork, curing and repair and equipment maintenance. This overlaps with U.S. 47-2051, but the Chinese scope includes production and conveying, and no complete task-by-task statistical mapping has been established, so the name cannot be used to infer equivalent wages or qualifications.

    Occupational framing

  2. 02

    BLS SOC47-2051 gives a typical entry of no formal educational credential, no related work experience and moderate-term on-the-job training; O*NET Job Zone1—2 is a level-level general preparation description, and 52%/35%/13% are respondents' judgments about the education new hires need, not the educational attainment of incumbents. The certification directory lists 23 items, and the apprenticeship field on the detail page lists 3 approved position titles (including aliases and existing names), which does not mean 3 separate open programmes or that all positions must hold every certification. The specific certification enrollment, fees and maintenance conditions must be checked with the body in each case. No sample of Chinese job posting education requirements and specific process training was obtained, so this is checked against the target position and no uniform junior or senior high school threshold is given.

    Education and training path

  3. 03

    The O*NET detail page lists 4 software categories: accounting, analytical/scientific, information retrieval and project management; the Hot recruitment page shows 0 items (Lightcast2025 U.S. national job postings). 0 items refers to that recruitment table, not to the occupation having no software skills, and the number of categories is not a measured adoption rate or a uniform personal threshold. On site the main items are trowels, screeds, power trowels, vibrators, saws and chisels, measuring tools and formwork tools; PPE is selected according to the hazard assessment and the task, and an ordinary dust mask cannot replace the required certified respirator.

    Methods and tools

  4. 04

    The work is mainly outdoor and on-site physical work. The O*NET work context shows: 96% continuously or almost continuously handle and control objects and tools by hand; 82% stand continuously or almost continuously; 84% work outdoors exposed to all weather conditions every day; 55% are exposed to contaminants every day (including cement dust and alkaline materials); 63% perform repetitive motions continuously; 48% are exposed to distracting or uncomfortable noise every day; 70% consider precision or accuracy extremely important; 86% wear common protective or safety equipment every day; 59% consider the pace determined by equipment speed extremely important; 63% have very high responsibility for the health and safety of others and 21% high responsibility; 66% have very high responsibility for the work results of others; 44% consider the consequences of error extremely serious and 11% very serious; 52% face time pressure every day; 56% are exposed to hazardous equipment every day; 33% bend or twist continuously or almost continuously; 33% kneel, crouch, bend or crawl continuously or almost continuously; 31% keep or regain balance continuously or almost continuously; 25% have a lot of freedom in determining tasks and priorities; 62% make decisions every day; 50% say the work is not automated at all. The work must follow institutional safety procedures and the design documents, and where crystalline silica, cement and chemical materials are involved, dust must be controlled and skin and respiratory protection used, along with compliance with edge, excavation, height, machinery, temporary electrical and equipment isolation requirements.

    Safety and work permits

  5. 05

    Articles 28/30/55/57—59 of China's Work Safety Law: safety training and special operation qualifications are separate, procedures must be followed and hazards reported; where an emergency directly endangering personal safety is found, the worker has the right to stop their own work or, in accordance with the law, to take emergency measures and then evacuate, without first obtaining institutional stop-work authorization. Overall project stop/resume work and project acceptance are handled separately under the applicable rules and responsibilities. Articles 24/25/27/32/36—37 of the Regulations on the Administration of Construction Project Work Safety set out general and subcontractor responsibility, list special operations, technical briefing, protection and emergency evacuation, and training, and do not describe all cutting and vibrating operations as special operations. For U.S. construction silica dust, check OSHA1926.1153: employers implement engineering/work-practice/respiratory controls according to Table1 for the specific equipment, indoors or outdoors and shift length, or handle it through the paragraph (d) exposure assessment route; wet methods and dust collection are not freely interchangeable, and respiratory protection and medical surveillance have applicable conditions. The O*NET 55% exposure to contaminants is not a silica dust measurement, an accident rate or evidence of compliance. For U.S. concrete construction equipment, check 1926.702: hand-guided powered trowels must have a control that cuts off power automatically when the operator releases the handle; for maintenance and servicing that could start unexpectedly and injure someone, all potentially hazardous energy must be locked out and tagged out. Other equipment and cleaning tasks are confirmed under the applicable rules, the manual and the hazardous energy plan, and the industrial 1910 clauses are not applied unconditionally to construction.

    Training and regulatory requirements

  6. 06

    OOH notes that the masonry workers group is mostly full-time, may work overtime and has schedules affected by weather; the O*NET figures for this occupation of 52% facing time pressure every day, 78% with irregular schedules and 50% not automated at all are context distributions, not AI adoption rates. Precise BLS SOC47-2051: employment was 204,800 in 2025 and is projected to be 208,100 in 2035, a net increase of 3,300, or 1.6% growth, with about 13,600 openings per year on average over 2025—2035, and the self-employed share was 1.5% in 2025. OOH rounds the growth to 2%; openings include growth and replacement demand such as transfers out and exits, and are not 13600 new additions each year or a dedicated AI projection. The 2025 U.S. annual median is 57020 USD and the hourly median is 27.41, which is not starting pay. National Bureau of Statistics 2025 average annual wages for construction: 92,036 CNY for non-private units and 66,275 CNY for private units (pre-tax); this is all-position urban unit industry background, not the national wage, starting pay or upper and lower limits for concrete workers or for this U.S. occupation, and is not converted into an occupational monthly wage. Compare actual hours, pay method and seasonal stoppages, equipment protection and rework responsibility.

    Pay and working hours

Work reality

Collaboration and communication
75% have face-to-face discussions every day; 59% are in contact with others continuously; 55% have telephone conversations every day.
Working hours and pace
52% face time pressure every day; 59% consider the pace determined by equipment speed extremely important.
Decision-making and autonomy
25% have a lot of freedom in determining tasks and priorities and 39% some freedom; authority over formed-surface acceptance and stop/resume work is set by design, supervision and institutional authorization.
Responsibility and impact
70% consider precision or accuracy extremely important; 63% have very high responsibility for the health and safety of others and 21% high responsibility; 66% have very high responsibility for the work results of others; 44% consider the consequences of error extremely serious and 11% very serious.
Environment and workspace
84% work outdoors exposed to all weather conditions every day; 55% are exposed to contaminants every day (including cement dust and alkaline materials); 48% are exposed to distracting or uncomfortable noise every day; 32% are exposed to extremely hot or cold temperatures every day; 19% work indoors in a non-environmentally controlled setting every day.
Physical and job demands
96% continuously handle and control objects and tools by hand; 82% stand continuously or almost continuously; 63% perform repetitive motions continuously; 33% bend or twist continuously; 33% kneel, crouch, bend or crawl continuously; 31% keep or regain balance continuously; 41% walk or run continuously.
Protection and safety
86% wear common protective or safety equipment every day; 56% are exposed to hazardous equipment every day; 24% wear specialized protective equipment every day; the work must control crystalline silica dust and use skin and respiratory protection according to institutional procedures.
Interpersonal contact and conflict
28% experience conflict situations every day and 30% at least once a week; 33% deal with unpleasant, angry or discourteous people every day.
Records and handover
form check, alignment and elevation records, pour, spread, consolidation and equipment use records, embedded item installation and position re-check records, levelling, finishing, finish and expansion joint and edge treatment records, and curing, repair and cleaning records must be complete and traceable, and location and shift handover must set out unfinished work and items awaiting curing or repair. The context above is a respondent distribution and does not prove accident rates; emergency stopping of your own work or evacuation and the project's stop/resume work decision are kept separate.

O*NET structured fields and usage boundaries

O*NET OnLine 47-2051.00 (framing for this occupation)BLS May 2025 OEWS wages (annual and hourly percentiles)Chinese industry average annual wage background and the precise occupational data gapO*NET industry distribution and employment and projection fieldsO*NET technology list and work context
O*NET OnLine 47-2051.00 (framing for this occupation)
O*NET occupational identity and tasks: O*NET-SOC 47-2051.00 Cement Masons and Concrete Finishers, page updated in 2026, listed as Job Zone 1-2 (little or no preparation to some preparation, SVP below 6.0), and this occupation page does not mark Bright Outlook. The official duties are 'Smooth and finish surfaces of poured concrete, such as floors, walks, sidewalks, roads, or curbs using a variety of hand and power tools. Align forms for sidewalks, curbs, or gutters; patch voids; and use saws to cut expansion joints.'; the page lists 26 tasks, of which 19 are core tasks, covering checking that the forms used to hold the concrete are correctly constructed (80), setting and aligning forms to the required slope and depth (78), spreading, levelling and finishing concrete with rakes, shovels, hand or power trowels, screeds and trowelling tools (77), monitoring the effect of wind and heat or cold on curing throughout (75), forming expansion joints and edges with edgers, jointers and straightedges (72), signalling tanker drivers to adjust their position and moving the discharge chute (72), directly directing the pour and supervising labourers spreading it (71), brooming a rough surface (70), applying hardening and sealing materials to cure and waterproof or restore the surface (69), operating a power vibrator to consolidate the concrete (67), installing anchor bolts, plates, thresholds and other embedded items (66), wetting the surface and filling holes and cracks with grout (66), waterproofing or repairing concrete surfaces (64), mixing cement, sand and water (62), chipping, scraping and grinding high spots and rough protrusions with pneumatic breakers and similar tools (58), cutting out damaged areas and drilling holes for and positioning reinforcing bars (57), wetting and grinding with a rubbing stone to obtain the specified finish (57), cleaning with a wire brush and judging surface condition by feel and observation (54), and making and clamping wooden forms for the area to be repaired (54); the rest are supplemental tasks, including spreading coloured stone chips, metal powder or colour powder for the specified finish (58), making concrete beams, columns and slabs (56), polishing with a polishing or surface treatment machine (55), cutting metal divider strips and pressing them into the terrazzo base (53), pressing stone chips in with a roller (50), cleaning the surface with hydrochloric acid and rinsing (47), and laying felt paper and forming it with a trowel (45).
BLS May 2025 OEWS wages (annual and hourly percentiles)
U.S. wages (BLS May 2025 OEWS framing, as shown on this occupation page): the hourly median is 27.41 USD and the annual median is 57,020 USD; the hourly 10th, 25th, 75th and 90th percentiles are 18.84, 22.60, 32.15 and 41.10 USD, and the annual 10th, 25th, 75th and 90th percentiles are 39,190, 47,010, 66,870 and 85,480 USD. The median means half of workers earn above and half below that value; it is not entry-level pay or a starting-pay promise; this occupation is usually trained mainly through on-the-job mentoring and project practice, and wage percentiles do not represent an individual's job offer.
Chinese industry average annual wage background and the precise occupational data gap
National Bureau of Statistics 2025 average annual wages for construction: 92,036 CNY for non-private units and 66,275 CNY for private units (pre-tax); this is all-position urban unit industry background, not the national wage, starting pay or upper and lower limits for concrete workers or for this U.S. occupation, and is not converted into an occupational monthly wage. Insufficient evidence: no precise national wage percentile, starting pay or regional monthly wage for Chinese concrete workers was obtained this round. The 2022 edition of China's occupational classification code explicitly lists concrete workers as 6-29-01-03 (PDF physical page 535), with tasks covering batching and mixing, pumping and pouring, forming and formwork, curing and repair and equipment maintenance. This overlaps with U.S. 47-2051, but the Chinese scope includes production and conveying, and no complete task-by-task statistical mapping has been established, so the name cannot be used to infer equivalent wages or qualifications.
O*NET industry distribution and employment and projection fields
O*NET industry distribution is construction 93% and other 7%; precise BLS SOC47-2051: employment was 204,800 in 2025 and is projected to be 208,100 in 2035, a net increase of 3,300, or 1.6% growth, with about 13,600 openings per year on average over 2025—2035, and the self-employed share was 1.5% in 2025. OOH rounds the growth to 2%; openings include growth and replacement demand such as transfers out and exits, and are not 13600 new additions each year or a dedicated AI projection. This occupation is not marked Bright Outlook; slow growth does not mean no one has opportunities, and project cycles and weather are factors to check for opportunities, with no quantified causal link obtained.
O*NET technology list and work context
The O*NET detail page lists 4 software categories: accounting, analytical/scientific, information retrieval and project management; the Hot recruitment page shows 0 items (Lightcast2025 U.S. national job postings). 0 items refers to that recruitment table, not to the occupation having no software skills, and the number of categories is not a measured adoption rate or a uniform personal threshold. The original work activity, skill, interest and style values are retained from the same edition of O*NET and are not used as personal competence thresholds. Work activities are led by handling and moving objects (83), inspecting equipment, structures or materials (83), getting information (81), performing general physical activities (80), scheduling work and activities (80), controlling machines and processes (79), identifying objects, actions and events (79) and making decisions and solving problems (77); basic skills are led by monitoring (56), speaking (53) and active listening and critical thinking (50 each), with mathematics 41 and science 6; transferable skills are led by coordination and quality control analysis and time management (53 each) and complex problem solving and judgment and decision making (50 each); knowledge is led by English language (67), building and construction (63), mathematics and public safety and security (52 each) and mechanical (41); the interest code is RC (Realistic, Conventional); work styles are led by dependability (77), attention to detail (67), caution (50) and stress tolerance (45).

Career direction comparison

How do I choose among the six real directions for cement masons and concrete finishers?

The table below compares how cement masons and concrete finishers and the adjacent directions differ in duties and outputs; the basis for judgment is the main outputs, the object of responsibility and the qualifications and authorization required, not how similar the position titles are.

How do I choose among the six real directions for cement masons and concrete finishers?
Career directionCore work and outputKey differencesBest-fit choice
Brickmasons and blockmasonsBuilding walls and structures with brick, block and mortar, with outputs centring on masonry and mortar joint quality and verticality and levelness.Brickmasons and blockmasons specialise in laying units and mortar, and their objects are discrete units and masonry; this occupation produces the pouring, spreading, surface forming and curing of fresh concrete, and the two differ in material state and process window.If you would rather do unit masonry and mortar joints and vertical and level control, look first at brickmasons and blockmasons; if you would rather complete pouring, finishing and curing within the time window of fresh concrete, look first at this occupation.
StonemasonsFabricating and installing natural stone components and finishes, with outputs centring on stone dimensions, joints and secure installation.Stonemasons specialise in cutting, carving and dry or wet fixing natural stone, and the material is stone; this occupation handles plastic fresh concrete and forms the surface within the initial set window.If you would rather work with natural stone and do fabrication and installation, look first at stonemasons; if you would rather do concrete pouring and surface finishing, look first at this occupation.
Plasterers and stucco masonsApplying plaster and stucco finishes and levelling on walls and ceilings, with outputs centring on wall flatness and finish quality.Plasterers and stucco masons specialise in mortar and stucco finishes on walls and ceilings, working on walls and ceilings and mostly in vertical orientations; this occupation works concrete on horizontal or formed surfaces and has to control elevation, slope and expansion joints.If you would rather do wall plastering and finish levelling, look first at plasterers and stucco masons; if you would rather do formed concrete surfaces and expansion joints and curing, look first at this occupation.
Terrazzo workers and finishersMaking and finishing terrazzo surfaces and grinding, polishing and setting divider strips, with outputs centring on surface pattern and gloss.Terrazzo workers and finishers specialise in terrazzo mixes, divider strips and grinding and polishing, and their process is closer to decorative surfacing; this occupation centres on large-area concrete pouring, finishing, curing and structurally related forming.If you would rather do decorative surfacing and terrazzo work, look first at terrazzo workers and finishers; if you would rather do concrete pour organisation and surface finishing, look first at this occupation.
Reinforcing iron and rebar workersCutting, tying and positioning reinforcement to drawings, with outputs centring on bar size and spacing, cover and tying quality.Reinforcing iron and rebar workers specialise in cutting, tying and positioning reinforcement, a structural step before pouring; this occupation organises the pour after reinforcement and formwork have passed inspection and is responsible for the formed surface quality.If you would rather do reinforcement cutting, tying and positioning, look first at reinforcing iron and rebar workers; if you would rather do pour organisation and surface forming and curing, look first at this occupation.
Construction labourersCarrying out material handling, trade assistance, cleaning and support on the construction site, with outputs centring on site support and site condition.Construction labourers specialise in site assistance, handling, cleaning and support and usually do not independently carry responsibility for pour organisation and formed surface quality; this occupation carries responsibility for form alignment, directing the pour, finishing and curing and its own process records.If you would rather do site support, handling and cleaning, look first at construction labourers; if you would rather carry responsibility for pouring and formed surface quality, look first at this occupation.

How to choose

This page compares cement masons and concrete finishers with six adjacent directions on the same set of dimensions: occupational direction, core work and outputs, key differences, and which direction each preference is better suited to. The adjacent directions are described according to their own official occupational descriptions and do not mean that position titles or work qualifications and acceptance and stop/resume work authority can be exchanged.

Conclusion: the basis for choosing a direction is the main outputs, the object of responsibility and the qualifications and authorization required, not how similar the names are; once a direction is chosen, check item by item the target position's work surfaces and process steps, whether it carries responsibility for directing the pour and coordinating curing and acceptance, the working conditions (outdoors, season, night) and programme, and whether crystalline silica and chemical materials are involved and the related training and protection requirements, and keep written confirmation.

AI impact on this career

Will AI replace cement masons and concrete finishers?

Conclusion: reviewable steps such as drafting process plans and rotas, estimating volumes and quantities, and organizing curing records, checklists and defect lists can be assisted by tools, but there is no official evidence that this replaces measuring forms and elevation on site, the actual operations of pouring, consolidating and finishing, on-site judgment of control joints, slope and surface quality, and responsibility for work safety and stop-work. AI exposure is not the same as automation rate or job disappearance; task exposure, the degree of process automation and employment numbers are three different concepts. AI Impact Score 8% is an editorial estimate. Model impact index for three equally weighted representative core tasks; not a measured share of working time or a job-loss probability. floor((25+0+0)/3+0.5)=8; fermatmind-ai-impact-v1; 2026-10-18.The three tasks, ratings and sources are listed in the FermatMind method source record on this page.

AI assessment method and sources

FermatMind AI Impact Score estimation method v1

FermatMind / 费马测试 · 2026-10-18

  • Model impact index for three equally weighted representative core tasks; not a measured share of working time or a job-loss probability. floor((25+0+0)/3+0.5)=8; fermatmind-ai-impact-v1; 2026-10-18.
  • Anchors: 0 negligible; 25 preparation or record assistance; 50 substantial assistance; 75 most information output can be formed by AI with review; 100 almost all of the selected task can be done by AI and independently verified.
  • Forms and elevation|checking form construction and setting and aligning forms to the required slope and depth|form check, alignment and elevation records. — 25/100; weight=1/3
  • Pouring and consolidation|signalling tanker drivers and moving the chute, directing the pour and supervising spreading and consolidation|pour, spread and consolidation records. — 0/100; weight=1/3
  • Levelling and finishing|levelling and finishing with trowels, screeds and power trowels and producing the specified finish to the design|levelling, finishing and finish records. — 0/100; weight=1/3

Editorial ratings use the existing occupational responsibilities and AI task analysis on this page. They are not adoption rates, measured effects, job-disappearance or personal-unemployment probabilities, or official scores from Stanford or another external institution. No measured time weights or future robot deployment are assumed.

Which cement mason and concrete finisher tasks can AI handle?

Suggested editorial trial: on licensed, non-sensitive design and material samples, compare the errors, time and rework of process drafts, estimates and record organization. No measured efficiency for this occupation was obtained; imagery and sensors can give tools on-site input, but do not guarantee that forms, setting, weather and safety conditions have been correctly identified, and the actual review plan must be followed.

Which steps will actually be adopted?

It depends on whether design documents and elevation data can be used in structured form, whether equipment and safety conditions are met, whether institutional rules allow automatic results to be used for process scheduling and acceptance support, and whether responsibility for rework and safety is clearly divided. Technical feasibility does not mean it is permitted for pour release and acceptance conclusions, nor that the institution has adopted it.

Will AI reduce cement mason and concrete finisher positions?

Precise BLS SOC47-2051: employment was 204,800 in 2025 and is projected to be 208,100 in 2035, a net increase of 3,300, or 1.6% growth, with about 13,600 openings per year on average over 2025—2035, and the self-employed share was 1.5% in 2025. OOH rounds the growth to 2%; openings include growth and replacement demand such as transfers out and exits, and are not 13600 new additions each year or a dedicated AI projection. This occupation is not marked Bright Outlook, which does not guarantee individual project opportunities.

Task impact matrix

Comparison of AI impact across career tasks
Work areaTaskCurrent changeHuman control point
Forms and pour preparationCheck form construction and set and align forms to the required slope and depth.Elevation and slope calculations can be assisted, while judging the actual condition of forms is handled according to the project's actual control and review requirements. This is an editorial task analysis and does not prove that automation is impossible.Judge whether form construction, support and sealing are acceptable, and be responsible for confirming pre-pour conditions.
Pouring and spreadingSignal tanker drivers and move the chute, direct the pour and supervise labourers spreading with shovels or special tools.Pour sequence and volume records can be assisted, while on-site direction and density judgments are handled according to the actual control and review requirements. This is an editorial task analysis and does not prove that automation is impossible.Judge whether spreading, consolidation and density are adequate, and be responsible for process interfaces and avoiding segregation.
Levelling, finishing and the specified finishLevel and finish with trowels, screeds and power trowels, and produce the trowelled, broomed or sweep finish to the design.Step lists and self-check forms can be assisted, while finishing timing and appearance judgments are handled according to the actual control and review requirements. This is an editorial task analysis and does not prove that automation is impossible.Judge surface absorption, finishing timing and whether trowelling and the finish meet the specified requirements, and be responsible for surface quality.
Control joints and edgesForm control joints and edges with edgers, jointers and straightedges, and cut control joints with saws.Joint position and spacing calculations can be assisted, while the actual forming and saw cutting judgments are handled according to the actual control and review requirements. This is an editorial task analysis and does not prove that automation is impossible.Judge whether control joint and edge positions, spacing and forming quality meet the design, and be responsible for executing them.
Curing and surface treatmentMonitor the effect of wind and heat or cold on curing, apply hardening, sealing and waterproofing materials and arrange covering and sprinkling.Temperature and humidity records and reminders can be assisted, while curing judgments are handled according to the actual control and review requirements. This is an editorial task analysis and does not prove that automation is impossible.Judge whether curing conditions meet the requirements and track the execution of covering and sprinkling, and be responsible for early cracking and frost damage risks.
Defects and repairChip, scrape and grind high spots and rough protrusions, cut out damaged areas and drill and locate reinforcement, and fill holes and cracks with grout or slurry and level them.Defect lists and repair records can be assisted, while deciding how to handle them is done according to the actual control and review requirements. This is an editorial task analysis and does not prove that automation is impossible.Decide how to handle defects and damaged areas, and be responsible for chipping, grouting and repair quality.
Records and compliance reportingRecord the process, material batches, equipment use, safety inspections and stop-work situations, and report and file them as required.Record templates and reminders can be assisted, while compliance judgments are handled according to the actual control and review requirements. This is an editorial task analysis and does not prove that automation is impossible.Be responsible for the completeness and reporting of process, material, equipment and safety inspection records.

Why does employment evidence reach different conclusions?

The evidence cards support identity, the 26 tasks of which 19 are core and 7 supplemental, the industry distribution and wages as separate objects; the Hot0 items are kept separate from the 4 software categories on the detail page, ILO is used only for the task exposure framework, and the editorial tool uses are not measured occupational efficiency or job projections.

O*NET-SOC 47-2051.00 occupation summary

View source ↗
Subject
U.S. occupational identity and official duties
Finding
'Smooth and finish surfaces of poured concrete, such as floors, walks, sidewalks, roads, or curbs using a variety of hand and power tools. Align forms for sidewalks, curbs, or gutters; patch voids; and use saws to cut expansion joints.' This page was updated in 2026, is listed as Job Zone 1-2 (little or no preparation to some preparation, SVP below 6.0), and the page does not mark Bright Outlook.
Limitation
It uses a U.S. framing and cannot be extrapolated to Chinese mainland; official duties are not the same as a specific institution's job authorization and stop-work and acceptance authority.

O*NET-SOC 47-2051.00 detailed profile (tasks and work activities)

View source ↗
Subject
The official 26 tasks and work activities
Finding
Core tasks include checking that forms are correctly constructed (80), setting and aligning forms to the required slope and depth (78), spreading, levelling and finishing concrete (77), monitoring the effect of wind and heat or cold on curing (75) and forming control joints and edges (72); work activities are led by handling and moving objects (83), inspecting equipment, structures or materials (83) and getting information (81).
Limitation
The task list describes the occupational group and does not mean every position carries out all 26 tasks; work qualifications and project responsibilities are confirmed under the actual jurisdiction and rules; in China, emergency stopping of your own work or evacuation is a statutory right and cannot require obtaining institutional stop-work authorization first.

O*NET-SOC 47-2051.00 technology list (employer recruitment technology signals)

View source ↗
Subject
Software and tools appearing in employer recruitment
Finding
The O*NET detail page lists 4 software categories: accounting, analytical/scientific, information retrieval and project management; the Hot recruitment page shows 0 items (Lightcast2025 U.S. national job postings). 0 items refers to that recruitment table, not to the occupation having no software skills, and the number of categories is not a measured adoption rate or a uniform personal threshold.
Limitation
The task and activity table supports the responsibilities of the occupational group and does not measure AI effects or individual safety ability; software categories and the Hot recruitment table are checked separately.

BLS occupational employment and wage statistics (47-2051)

View source ↗
Subject
The wage percentiles shown on this occupation page
Finding
This framing gives an hourly median of 27.41 USD and an annual median of 57,020 USD; the hourly 10th to 90th percentile is 18.84 to 41.10 USD and the annual 10th to 90th percentile is 39,190 to 85,480 USD; the median is not entry-level pay and does not constitute an individual job offer.
Limitation
Wages for this occupation are provided by BLS May 2025 OEWS as annual and hourly percentiles under the framing shown on this occupation page.

ILO working paper 140, Generative AI and Jobs: A Refined Global Index of Occupational Exposure

View source ↗
Subject
Task-level exposure measurement for generative AI
Finding
The conclusion boundary of this study is job transformation rather than wholesale replacement; it provides no job-count projections and cannot be used to estimate the year in which a given occupation disappears.
Limitation
ILO supports the task exposure research framework and does not provide measured efficiency for process planning, estimating or recording in this occupation; these uses are suggested editorial trials tied to the tasks.

Why does impact differ by work direction?

The table below compares three groups of work directions in terms of the impact of automation: which steps can be assisted, and which judgments and responsibilities remain with people.

Forms and pour preparation

AI primarily changesDrafting process sequences and crew rotas, estimating volumes and material quantities, and organizing curing and inspection records can be generated by systems.

Human responsibility remainsJudge whether the actual condition of the forms and the elevation and slope are acceptable, and be responsible for confirming pre-pour conditions and for the stop-work decision.

Levelling, finishing and forming

AI primarily changesFinishing and trowelling step lists, self-check forms and curing record templates can be carried by systems.

Human responsibility remainsJudge surface absorption, finishing timing and whether trowelling and the finish meet the specified requirements, and be responsible for surface quality.

Curing and defect repair

AI primarily changesDefect lists, repair records and volume and programme statistics can be organized automatically.

Human responsibility remainsCheck flatness, slope, elevation, control joints and repair results, and judge whether they are acceptable and whether rework and escalation are needed.

Accountability must remain intact when AI enters professional workflows

The following five items are suggested editorial steps for deployment and review, confirmed against the project hazard assessment and rules; they are not a uniform five-step procedure or a construction release permit.

  1. Task input

    First confirm the processes and equipment you may take on independently, the design documents and elevation and slope version you rely on, whether the weather and material conditions meet the pouring requirements, and which matters must stop work and be escalated to authorised personnel.

  2. AI processing

    Trial drafting, estimating and recording tools on permitted, reviewable steps; the control and review of automated equipment and monitoring follows the project's actual applicable requirements, and no uniform human one-by-one release is inferred from these suggestions.

  3. Human review

    Review the measured forms, elevation and slope, the actual material consistency and initial set, and the weather and temperature changes item by item, and judge whether the automatic results match the actual situation; where they do not, on-site measurements and the specifications take precedence and the work is redone.

  4. Evidence trail

    Keep form check, alignment and elevation records, pour, spread and consolidation records, levelling, finishing, finish and control joint and edge treatment records and curing and repair records so the process is traceable.

  5. Inspection and stop-work / responsibility

    Design, materials, quality and acceptance are borne by the corresponding parties under the actual contract and applicable specifications; you carry out self-checks and reporting as required. Articles 28/30/55/57—59 of China's Work Safety Law: safety training and special operation qualifications are separate, procedures must be followed and hazards reported; where an emergency directly endangering personal safety is found, the worker has the right to stop their own work or, in accordance with the law, to take emergency measures and then evacuate, without first obtaining institutional stop-work authorization. Overall project stop/resume work and project acceptance are handled separately under the applicable rules and responsibilities. Articles 24/25/27/32/36—37 of the Regulations on the Administration of Construction Project Work Safety set out general and subcontractor responsibility, list special operations, technical briefing, protection and emergency evacuation, and training, and do not describe all cutting and vibrating operations as special operations.

Professional risks of using AI

Pouring on an automatic schedule without checking the forms and actual materials

Organising the pour only on an automatic schedule or automatic monitoring results without checking the forms, elevation and actual materials causes elevation and slope deviations, surface defects, rework and structural risks (70% consider precision or accuracy extremely important; 44% consider the consequences of error extremely serious and 11% very serious).

Control: Use the design documents, on-site measurements and actual materials to verify automatic results, and where there is an inconsistency re-check the facts before updating the record; where structure or acceptance is involved, the basis and the limits must be stated.

Exposure to crystalline silica dust and cement and chemical materials

Contact with crystalline silica dust, cement and chemical materials, and mishandling construction imagery and project documents, cause occupational health and compliance consequences.

Control: For U.S. construction silica dust, check OSHA1926.1153: employers implement engineering, work practice or respiratory controls according to Table1 for the specific equipment, indoors or outdoors and shift length, or handle it through the paragraph (d) exposure assessment route; wet methods and dust collection are not freely interchangeable, and respiratory protection and medical surveillance have applicable conditions. The O*NET 55% exposure to contaminants is not a silica dust measurement, an accident rate or evidence of compliance. For U.S. concrete construction equipment, check 1926.702: hand-guided powered trowels must have a control that cuts off power automatically when the operator releases the handle; for maintenance and servicing that could start unexpectedly and injure someone, all potentially hazardous energy must be locked out and tagged out. Other equipment and cleaning tasks are confirmed under the applicable rules, the manual and the hazardous energy plan, and the industrial 1910 clauses are not applied unconditionally to construction. Project imagery and documents must first be checked for lawful purpose, confidentiality and permission, and must not be provided to unapproved tools.

Curing arrangements and actual weather not traceable

Scheduling curing only on automatic results without looking at the actual wind, temperature and sunlight misses surface moisture loss, early cracking and frost damage risks.

Control: Check the curing arrangements against three kinds of primary information — on-site temperature, wind and the actual concrete condition — and record and escalate discrepancies, noting the reason and time for any change.

Errors in elevation, slope and joint position conversion

Errors in elevation, slope and thickness conversion and deviations in control joint position and spacing cause poor drainage, uneven surfaces and rework (70% consider precision or accuracy extremely important; 63% have very high responsibility for the health and safety of others).

Control: Use the design documents, measuring tools and levels to check elevation, slope and joint positions, and double-check before pouring and saw cutting; deviations must be recorded and escalated, and incorrect positions must not be carried into pouring and saw cutting.

Out-of-scope stop-work and acceptance judgments

Handing the pour release, acceptance support and stop-work judgment to tools or unauthorized people creates a responsibility vacuum and makes it untraceable.

Control: Take on only the processes for which you already have qualifications, training and a project assignment, and report hazards promptly; in an emergency directly endangering personal safety, stop your own work or evacuate in accordance with the law. Overall resumption and acceptance are not authorized by tools or the simulated materials on this page.

How should different audiences respond?

Students or career changers preparing to enter this occupation

First complete a closed loop with self-made materials: given a fictional formwork and elevation note and a fictional set of weather and material conditions, write out form checking and alignment, the pour sequence and vibrator point layout, the process and timing for levelling, finishing, control joints and edge treatment, and curing and defect determination and repair methods, mark three possible quality or safety risks and two situations where work must stop, then ask a peer to challenge it; at the same time check whether the target position involves crystalline silica and chemical materials and the related training and protection requirements.

Working cement masons and concrete finishers

Use tools for reviewable steps such as drafting process plans and crew rotas, estimating material quantities and volumes, and organizing curing records, checklists and defect lists; the actual condition of forms, the actual weather and materials, the actual feel and appearance when finishing and trowelling, the actual positions of control joints, edges and slopes, and the defect repair method must still be checked and documented by you on site.

On-site construction and quality management positions

Before introducing automated pouring equipment, vibrating or finishing robots or automatic curing monitoring, first make clear the version of the design documents and elevation and slope data, equipment and energy isolation and protection measures, who handles anomalies and shutdowns, and who is responsible for formed surface quality and rework and acceptance conclusions, and ensure there is substantive human review and documentation before pouring and delivery.

Mentoring and skills training

Focus training on form checking and elevation and slope control, pour organisation and spreading and consolidation, levelling, finishing, trowelling and the specified finish, control joint and edge forming, the effect of wind and temperature on curing and covering and sprinkling, defect determination and repair, and dust control and skin and respiratory protection for crystalline silica, cement and chemical materials; also train the habit of staying cautious about automated equipment and automatic monitoring results and going back to on-site measurement and specification checks.

Common questions about AI and career development

Will cement masons and concrete finishers be replaced by AI?

No occupational evidence supporting wholesale replacement or permanent non-replacement was obtained this round; construction equipment can assist or automatically complete part of the operations, and the specific on-site verification and responsibilities are implemented under the applicable rules and actual institutional systems, and the fact that someone is still responsible cannot be used to infer that the number of positions will not change.

Source: O*NET occupation summary / detailed profileOriginal source ↗

Do I have to master automated pouring equipment to enter the field now?

What is needed is knowledge of concrete materials and pouring and finishing processes, form and elevation and slope control, tool and equipment operation, curing and defect determination and repair, and protection against crystalline silica, dust and chemical materials and on-site safety ability, not programming ability; whether specific equipment or tools must be used depends on the project type and institutional configuration.

Source: O*NET technology list / detailed profileOriginal source ↗

Which tasks are most easily affected by AI?

Drafting process sequences and rotas, estimating volumes and material quantities, organizing curing and inspection records and defect lists, and progress and hours statistics; these steps are reviewable and traceable.

Source: O*NET detailed profile / this page's method noteOriginal source ↗

Will this occupation shrink by 2035?

Precise BLS SOC47-2051: employment was 204,800 in 2025 and is projected to be 208,100 in 2035, a net increase of 3,300, or 1.6% growth, with about 13,600 openings per year on average over 2025—2035, and the self-employed share was 1.5% in 2025. OOH rounds the growth to 2%; openings include growth and replacement demand such as transfers out and exits, and are not 13600 new additions each year or a dedicated AI projection. This occupation is not marked Bright Outlook, which does not guarantee individual project opportunities.

Source: BLS occupational employment and wage projections tableOriginal source ↗

Can AI replace humans in confirming formed-surface acceptance or deciding to stop work?

AI tools do not automatically obtain statutory personnel qualifications or project responsibility; process self-checks, structural and material review, project acceptance and overall stop/resume work are allocated according to actual responsibilities, and the worker's right to emergency stop of their own work and evacuation cannot be excluded across the board.

Source: This page's method note / formed-surface acceptance and stop-work authorityOriginal source ↗

In which year will this position disappear?

No projection of the year this occupation disappears was obtained this round, and no disappearance year is inferred from task exposure or automation context.

Source: This page's method noteOriginal source ↗

What should I learn first now?

Learn the basics and the rules first: form checking and elevation and slope control, pour organisation and spreading and consolidation, levelling, finishing, trowelling and the specified finish, control joint and edge forming, curing and defect determination and repair, and the rules for crystalline silica, dust, fall, machinery and temporary electrical protection and stopping and escalating; build the process and safety boundaries first, then learn equipment and automation assistance, and expand duties gradually according to job authorization.

Source: Detail page preparation level and education requirements, precise BLS typical entry; the training directory only discovers programsOriginal source ↗

The differences in direction within this occupation mainly show up in the work surfaces and process steps: the large-area pouring and finishing direction centres on elevation, flatness and trowelling; the kerb, footpath and gutter direction centres on form alignment, slope and alignment; the repair and chipping direction centres on defect determination, grouting and levelling; the terrazzo and decorative surfacing direction centres on divider strips, grinding and polishing; the curing and inspection support direction centres on temperature and humidity, covering and test sampling support; the shift lead direction centres on the crew and process interfaces and safety organization. When choosing a direction, check the work surfaces, process steps, qualifications required and way of working, rather than looking only at the name of the direction.

Chinese mainland salary reference

Chinese mainland industry reference and the precise occupational gap

The 2022 edition of China's occupational classification code explicitly lists concrete workers as 6-29-01-03 (PDF physical page 535), with tasks covering batching and mixing, pumping and pouring, forming and formwork, curing and repair and equipment maintenance. This overlaps with U.S. 47-2051, but the Chinese scope includes production and conveying, and no complete task-by-task statistical mapping has been established, so the name cannot be used to infer equivalent wages or qualifications.

Chinese mainland industry wage reference and the precise occupational gap

The 2022 edition of China's occupational classification code explicitly lists concrete workers as 6-29-01-03 (PDF physical page 535), with tasks covering batching and mixing, pumping and pouring, forming and formwork, curing and repair and equipment maintenance. This overlaps with U.S. 47-2051, but the Chinese scope includes production and conveying, and no complete task-by-task statistical mapping has been established, so the name cannot be used to infer equivalent wages or qualifications. Articles 28/30/55/57—59 of China's Work Safety Law: safety training and special operation qualifications are separate, procedures must be followed and hazards reported; where an emergency directly endangering personal safety is found, the worker has the right to stop their own work or, in accordance with the law, to take emergency measures and then evacuate, without first obtaining institutional stop-work authorization. Overall project stop/resume work and project acceptance are handled separately under the applicable rules and responsibilities. Articles 24/25/27/32/36—37 of the Regulations on the Administration of Construction Project Work Safety set out general and subcontractor responsibility, list special operations, technical briefing, protection and emergency evacuation, and training, and do not describe all cutting and vibrating operations as special operations.

Chinese mainland (industry average annual background; not occupational monthly wages)

Insufficient evidence: precise occupational monthly wages were not obtained; construction annual averages of 92036 for non-private and 66275 for private units are not filled in as monthly wage bands.

Regions with concentrated infrastructure, municipal and building projects

Insufficient evidence: no verifiable region-level occupational monthly wage data was obtained, so this page does not present a regional ranking.

Other regions

Insufficient evidence: no official or verifiable source supports a monthly wage range for this occupation in other regions.

Which job directions correspond to different educational backgrounds?

National Bureau of Statistics 2025 average annual wages for construction: 92,036 CNY for non-private units and 66,275 CNY for private units (pre-tax); this is all-position urban unit industry background, not the national wage, starting pay or upper and lower limits for concrete workers or for this U.S. occupation, and is not converted into an occupational monthly wage.

Educational background, job directions and notes (editorial, not wage statistics)
Educational backgroundJob directionNotes and suggested checks
Education for the target position is checked separately (no recruitment sample obtained)Concrete work assistant positions within a construction crew or team; material handling and cleaning support positions.Suggested editorial assistant position example: handling, cleaning and spreading support under mentoring; specific equipment training, work qualifications and task allocation are checked item by item, and assistant titles do not mean that all equipment is uniformly prohibited by law.
Education, experience and safety training requirements for the target position are checked separatelyConcrete pouring and finishing positions; kerb, footpath and gutter forming positions.You may take on form checking, pour organisation, finishing, forming and curing as required; whether you operate cutting, vibrating and pneumatic breaker equipment and whether you enter edge, excavation and height work areas is determined by position training and institutional authorization and does not expand automatically with length of service.
Has pour organisation, process coordination, quality self-check and repair experienceConcrete work team leader or specialist subcontract crew leader; on-site technical and quality self-check positions.Suggested editorial shift-lead path: process arrangement, self-check, mentoring and safety organization; project acceptance and institutional qualifications are handled by the corresponding parties, and you still perform your safety obligations.
Has several years of project, crew, equipment, cost and safety management experienceSubcontract or specialist contracting management positions; construction site and equipment management positions.Management positions involve construction organization, crews, equipment, cost and safety management; business qualifications, work permits and structural change approval are still borne by parties and personnel with the corresponding qualifications.

Compare employment terms, process and equipment qualifications, weather stoppage and overtime allowances, pay method and rework responsibility; no national occupational percentile was obtained, and industry averages are not used as a job offer.

Which industries and directions use this occupation?

Construction (industry unit average background)

National Bureau of Statistics 2025 average annual wages for construction: 92,036 CNY for non-private units and 66,275 CNY for private units (pre-tax); this is all-position urban unit industry background, not the national wage, starting pay or upper and lower limits for concrete workers or for this U.S. occupation, and is not converted into an occupational monthly wage.

Manufacturing (classification note)

The classification of precast component manufacturing must be checked against the unit's activities; manufacturing wages were not added this round, which does not mean precise data for this occupation.

Construction (specialist subcontracting, classification note)

Specialist subcontracting positions for formwork, concrete and decorative surfacing may be classified separately; this page does not treat the sector average as a wage for this occupation and only notes the possible classification.

Will AI affect cement mason and concrete finisher wages?

Automated pouring and finishing equipment change how the processes are organised, but they do not change the statistical framing for this occupation in Chinese mainland: the occupational-level statistical gap has nothing to do with the tools.

U.S. salary reference

U.S. cement mason and concrete finisher wage and employment data?

The 2025 U.S. national annual median is 57020 and P10/P25/P75/P90 is 39190/47010/66870/85480 USD; hourly wages are 27.41 and 18.84/22.60/32.15/41.10. Percentiles are not starting pay or seniority bands. Precise BLS SOC47-2051: employment was 204,800 in 2025 and is projected to be 208,100 in 2035, a net increase of 3,300, or 1.6% growth, with about 13,600 openings per year on average over 2025—2035, and the self-employed share was 1.5% in 2025. OOH rounds the growth to 2%; openings include growth and replacement demand such as transfers out and exits, and are not 13600 new additions each year or a dedicated AI projection.

U.S. wage distribution (framing shown on this occupation page, including annual and hourly)

U.S. wage distribution (framing shown on this occupation page, including annual and hourly)
Wage statistical positionAnnual wage referenceConversion boundaryHow to understand this position
10th percentile39,190 USD/year (10th percentile)Framing on this occupation page, not individual monthly incomeThe 10th percentile is 39,190 USD/year; this is the low end of the distribution, does not represent all newcomers and is not a starting-pay promise.
50th percentile57,020 USD/year (median)Not individual take-home incomeThe median is 57,020 USD/year (hourly median 27.41 USD); it describes the midpoint of the whole distribution and does not represent an individual's take-home income.
90th percentile85,480 USD/year (90th percentile)Framing on this occupation page, not individual take-home payP90 is 85480 USD/year, which does not represent common income or pay that being a shift lead is certain to bring.

How should U.S. cement mason and concrete finisher wages be understood?

Is the median entry-level pay?

The national median and P10/P25 are distribution positions, not proof of starting pay, the causes of wages or a duty premium.

Can the hourly wage be used to infer an individual's annual salary?

This statistic is presented in both hourly and annual terms (converted using a standard work year); the hourly median on this page is 27.41 USD and the annual median is 57,020 USD, and these cannot be used to infer an individual's take-home income, piece-rate or volume-based income, or overtime and high-temperature period income.

Where do the percentiles and median come from?

Check national percentiles against O*NET/BLS2025 and employment against the precise 2025—2035 table. The OOH industry wages combine the masonry workers group, and there is also heavy civil engineering at 55560 USD/year, which is not passed off as industry wages for this occupation; precise industry wages are still missing this round.

Which conditions affect actual income?

Actual income is also affected by region and project type and scale, season and the number of workable days, the pay method (hourly, by volume or by square metre) and whether you carry shift lead, equipment operation and testing support duties.

How much do U.S. wages differ across industries?

How much do U.S. wages differ across industries?
IndustryAnnual median wage for the masonry workers group within the industry (not precise for this occupation)How to understand this value
Masonry contractors (broad masonry workers group)61,110 USD/year (2025 median within the industry for the group, not precise for this occupation)OOH combines brickmasons, stonemasons, concrete finishers and terrazzo workers into masonry workers; this cannot be used as the industry median for SOC47-2051.
Building construction (broad masonry workers group)61,030 USD/year (2025 median within the industry for the group, not precise for this occupation)OOH combines brickmasons, stonemasons, concrete finishers and terrazzo workers into masonry workers; this cannot be used as the industry median for SOC47-2051.
Other specialty trade contractors (broad masonry workers group)58,870 USD/year (2025 median within the industry for the group, not precise for this occupation)OOH combines brickmasons, stonemasons, concrete finishers and terrazzo workers into masonry workers; this cannot be used as the industry median for SOC47-2051.
Poured concrete foundation and structure contractors (broad masonry workers group)55,690 USD/year (2025 median within the industry for the group, not precise for this occupation)OOH combines brickmasons, stonemasons, concrete finishers and terrazzo workers into masonry workers; this cannot be used as the industry median for SOC47-2051.

Which factors really affect the work and income of cement masons and concrete finishers?

Education and training

BLS SOC47-2051 gives a typical entry of no formal educational credential, no related work experience and moderate-term on-the-job training; O*NET Job Zone1—2 is a level-level general preparation description, and 52%/35%/13% are respondents' judgments about the education new hires need, not the educational attainment of incumbents. The certification directory lists 23 items, and the apprenticeship field on the detail page lists 3 approved position titles (including aliases and existing names), which does not mean 3 separate open programmes or that all positions must hold every certification. The specific certification enrollment, fees and maintenance conditions must be checked with the body in each case.

Industries and employer types

The O*NET construction 93% and other 7% is the employment classification for this occupation and cannot be used to infer wages. OOH separately gives industry wages for the masonry workers group, and the group proxy must be made clear.

Scope of duties and level of responsibility

Suggested editorial comparison: check separately the shift lead, equipment, repair and testing support duties and the actual wages; no causal data on a duty premium was obtained.

U.S. employment prospects and preparation level

Employment · employment size

204,800 people (2025; employment includes the self-employed)

The employment base differs from the wage survey population; the self-employed share was 1.5% in 2025; the O*NET industry distribution is construction 93% and other 7%.

Employment · growth rate

1.6% (2025—2035)

Precise BLS SOC47-2051: employment was 204,800 in 2025 and is projected to be 208,100 in 2035, a net increase of 3,300, or 1.6% growth, with about 13,600 openings per year on average over 2025—2035, and the self-employed share was 1.5% in 2025. OOH rounds the growth to 2%; openings include growth and replacement demand such as transfers out and exits, and are not 13600 new additions each year or a dedicated AI projection.

Career fit guide

Which interests, abilities and ways of working matter more for cement masons and concrete finishers?

Direct answer: the more explanatory fit signals are being able to complete pouring, levelling, finishing and curing in sequence within the approved time window for each step, being able to check forms, elevation and slope clearly, being able to keep wearing protection outdoors and in dust, and stopping and reporting first when conditions are not met; having helped a family member finish a small patch of floor is not enough to prove large-area formed-surface, curing and repair ability.

You may be better suited to: You can complete formwork, pouring, finishing, forming and curing to the design documents and specifications and leave traceable records; you are willing to stop work first and escalate through procedure when forms are not aligned, the weather or materials or equipment are abnormal, or protection is missing, rather than forcing the work.

These situations need careful thought: You find checking forms and elevation troublesome, habitually pour straight from experience, resist improvement when surface or protection problems are pointed out, or simplify dust and skin contact protection and curing steps to meet the programme; all of these directly amplify the risk of rework, occupational health and safety, and need careful thought.

Do an entry exercise: In a supervised exercise, complete a closed loop with self-made materials that runs from form checking and alignment, pour sequence and vibration, levelling, finishing, control joints and edges, to curing arrangements and defect determination and repair methods, and ask a working practitioner to point out problems in process, elevation, surface and protection; then judge whether you are willing to do this kind of work over the long term.

Do not let one test decide your career

Holland career interest model (RIASEC)

Evidence strength: O*NET explicitly provides the interest code, which is at the level of official occupational data; it describes the interest characteristics of the occupational group, not an individual fit conclusion.

Which Holland type suits cement masons and concrete finishers better?

The Holland interest code is RC (Realistic, Conventional): Realistic corresponds to designing, building or repairing equipment, materials and structures and doing physical or outdoor work, and Conventional to organizing information or data by procedures and rules; for this occupation Realistic is the highest score (100) and Conventional the second highest (38), and the specific interest areas are mainly physical and manual labour (93), building and carpentry (23), engineering (20) and transportation and machinery operation (19).

  • The combination of the two interests is consistent with the job tasks: long hours of physical and manual work outdoors, and checking elevation, slope, joint positions and curing requirements against drawings and specifications.
  • If you are unwilling either to do long hours of outdoor physical work or to check forms, elevation and protection requirements to specification, the interest code is not enough to support choosing this occupation.

Do not use it this way: A matching interest only indicates a similar direction and does not prove construction ability or that you hold equipment or acceptance qualifications; the right to emergency stop of your own work and evacuation cannot be excluded for lack of project authorization.

Test my Holland career interests

Five-factor personality model (Big Five)

Task links are not the validity of personality scores, and scores are not used to predict professional competence or safety.

Which Big Five traits are more relevant to this job?

Suggested editorial behavior observations: check form elevation, finishing and curing and anomaly records, communication under pressure and crew collaboration; no dedicated evidence on Big Five personality and performance or rework in this occupation was obtained this round.

  • Observe whether form elevation and process and curing records are complete, together with rework and supervisory feedback; do not infer cracking rates from conscientiousness scores.
  • Observe whether the person reports and handles sudden weather changes and equipment anomalies to procedure, and do not infer construction safety from emotional scores.

Do not use it this way: Note: treating personality scores as competence conclusions is a common misuse; this page provides no score thresholds or personality type lists.

View my Big Five personality traits

Myers-Briggs Type Indicator (MBTI)

Evidence strength: MBTI has limited predictive validity for occupations and is not used by O*NET or BLS as a fit standard.

Which MBTI type suits cement masons and concrete finishers best?

MBTI is not an assessment tool for career fit or professional competence, and no official data supports the claim that a certain type is best suited to cement masons and concrete finishers. It can be used for self-reflection and understanding communication preferences, but not for qualification exams, recruitment screening or job authorization decisions.

  • If MBTI is used as a starting point for discussing collaboration preferences, it should be tested alongside reviewable self-check and curing records and rework records.
  • Treating type labels as competence boundaries hinders accepting improvements to processes and safety protection.

Do not use it this way: Note: this page lists no best-suited type and does not endorse screening candidates on that basis.

Explore my MBTI preferences

Enneagram

Evidence strength: no official occupational source supports using the Enneagram for career fit judgments.

Which Enneagram type suits cement masons and concrete finishers better?

The Enneagram is likewise not a career fit tool, lacks support in official occupational data, and is not used for recruitment or qualification determination. It can be used for self-reflection, but not to decide whether to invest in learning formwork, pouring, finishing and safety protection.

  • If you use it to organize your own motivations and stress reactions, the conclusions should be tested against actual surface quality, self-check and curing records and collaboration evaluations.
  • Treating type interpretations as a basis for whether to comply with dust, skin contact, fall and machinery protection requirements is a typical boundary risk.

Do not use it this way: Note: this page provides no correspondence between types and occupations.

Explore my Enneagram patterns

Intelligence quotient (IQ) and numerical reasoning

Evidence strength: the official O*NET work activity and skill lists give the importance ratings above; they describe occupational characteristics and do not correspond to specific score thresholds.

If my IQ or maths is not good, can I be a cement mason and concrete finisher?

This occupation mainly tests physical work, inspection and process control: O*NET work activities are led by handling and moving objects (83), inspecting equipment, structures or materials (83), getting information (81), performing general physical activities (80), scheduling work and activities (80), controlling machines and processes (79), identifying objects, actions and events (79) and making decisions and solving problems (77); basic skills are led by monitoring (56), speaking (53) and active listening and critical thinking (50 each), with mathematics 41 and science 6; transferable skills are led by coordination and quality control analysis and time management (53 each) and complex problem solving and judgment and decision making (50 each). Avoiding form and elevation checks and protection requirements directly amplifies the risk of rework and injury.

  • Being able to work long hours outdoors in weather, dust and noise and keep movements steady is a prerequisite for doing the work.
  • If you are clearly uncomfortable with 96% continuously handling and controlling objects and tools by hand, 82% standing continuously or almost continuously, 84% working outdoors exposed to all weather conditions every day, 55% being exposed to contaminants every day, 63% performing repetitive motions continuously, 33% bending or twisting continuously and 33% kneeling, crouching, bending or crawling continuously, you should assess whether sustained work in this occupation is feasible.

Do not use it this way: The tests on this page are not used for admission or elimination; statutory qualifications, institutional recruitment and specific task arrangements are checked separately, and emergency stop of your own work and evacuation are handled in accordance with the law.

Understand my intelligence and reasoning performance

Emotional intelligence (EI, often called EQ)

Evidence strength: O*NET work styles are led by dependability (77), attention to detail (67), caution (50) and stress tolerance (45); the predictive validity of emotional intelligence tests is limited and cannot replace practical evidence.

Do cement masons and concrete finishers need high EQ?

Emotional and tolerance capacity helps: you need to stay steady under a pace where the pour must be continuous, sudden weather changes and schedule pressure, and to communicate and escalate through the process. But such capacity cannot be defined by a single score, nor can it replace formwork, finishing and curing ability and job authorization.

  • Being able to improve immediately when problems with elevation, surface or protection are pointed out matters more than how high an emotional score is.
  • Being willing to admit that process conditions are not met and promptly seek help from the shift lead or supervisor is part of professional competence.

Do not use it this way: Note: this page provides no emotional ability thresholds and does not equate high scores with competence.

Understand my emotional intelligence ability

Which cement mason and concrete finisher direction are you more likely suited to?

Adjacent occupation: brickmasons and blockmasons

Fits better when: Suggested editorial observation: willing to set out and measure, lay units and mortar and check mortar joints and verticality.

Watch for: You need to learn unit layout, mortar and masonry processes separately; concrete finishing does not equal masonry ability.

Explore related career: Brickmasons and blockmasons

Adjacent occupation: stonemasons

Fits better when: Suggested editorial observation: willing to fabricate, match and install natural stone.

Watch for: You need to learn natural stone fabrication, fixing and joint control separately; cast-in-place concrete experience does not replace stone craft.

Explore related career: Stonemasons

Adjacent occupation: plasterers and stucco masons

Fits better when: Suggested editorial observation: willing to prepare wall and ceiling substrates and plaster and level them.

Watch for: You need to learn plaster materials, substrates and wall and ceiling processes separately; floor and slab trowelling experience only transfers in part.

Explore related career: Plasterers and stucco masons

Adjacent occupation: terrazzo workers and finishers

Fits better when: Suggested editorial observation: willing to mix, lay and grind terrazzo decorative surfacing.

Watch for: You need to learn the mix, divider strip, grinding and polishing processes separately; concrete levelling does not mean you can already complete terrazzo.

Explore related career: Terrazzo workers and finishers

Adjacent occupation: reinforcing iron and rebar workers

Fits better when: Suggested editorial observation: willing to position, tie and check reinforcement bar size and spacing to drawings.

Watch for: You need to learn reinforcement and cover, connection and positioning requirements separately; pouring and finishing and reinforcement work are different processes.

Explore related career: Reinforcing iron and rebar workers

Adjacent occupation: construction labourers

Fits better when: Suggested editorial observation: willing to prepare the site, move materials and assist several trades.

Watch for: You need earthworks, tooling and process training according to the specific position; shift-lead concrete experience does not automatically grant equipment operation qualifications.

Explore related career: Construction labourers

Career fit questions

What kind of personality is better suited to being a cement mason and concrete finisher?

It is less about a certain personality than about a certain way of working: measure forms and elevation accurately, spread and vibrate the concrete evenly, level and trowel the surface, keep the joints straight and in position, keep up with curing, wear the protection and keep complete records. O*NET work activities emphasize handling and moving objects, inspecting equipment, structures or materials and getting information.

Are introverts suited to being cement masons and concrete finishers?

Whether it suits you does not depend on introversion or extraversion. The work context shows 75% have face-to-face discussions every day, 59% are in contact with others continuously and 55% have telephone conversations every day, while 82% stand continuously or almost continuously and 52% face time pressure every day; whether you can stay meticulous and keep protection habits under outdoor physical work and time pressure matters more than how extraverted you are.

Can extraverts do well as cement masons and concrete finishers?

Extraversion or introversion does not determine competence; communication, measuring, construction and recording ability are needed. The O*NET figures of 70% for precision, 62% making decisions every day and 25% having freedom over task priorities are job context, not an extraversion effect.

Which MBTI type suits cement masons and concrete finishers best?

There is no official conclusion and no best-suited type. MBTI can only help organize preferences and raise questions to check; it cannot predict professional competence or recruitment and job authorization outcomes; this page provides no type list.

Which Holland type suits this occupation better?

O*NET lists the interest code for this occupation as RC (Realistic, Conventional): Realistic is the highest score (100), with the specific areas led by physical and manual labour (93) and building and carpentry (23); Conventional (38) corresponds to organizing forms, elevation and records clearly by procedures and rules. Interest codes describe characteristics of the occupational group, not an individual fit conclusion.

Can personality trait scores predict job performance in this occupation?

No. Personality and interest tools have limited validity and cannot replace form and elevation and self-check records, pouring, finishing and curing records and defect and repair records and actual performance; this page uses them only to raise questions to check.

Can I be a cement mason and concrete finisher if my maths is not good?

Situations where long-term investment is not advised: you cannot adapt to outdoor all-weather work and long periods of standing and repetitive motions (84% work outdoors exposed to all weather conditions every day, 82% stand continuously, 63% perform repetitive motions continuously), or you are unwilling to wear protection in dust and noise (55% are exposed to contaminants every day, 86% wear common protective equipment every day, 48% are exposed to distracting or uncomfortable noise every day), or you do not accept stopping and escalating when forms are not aligned or the weather is abnormal; you can first judge after a supervised formwork, finishing and curing exercise. Among the basic skills for this occupation, the importance of mathematics is 41, and basic calculation ability for elevation, slope, volume and thickness conversion is still required.

Do cement masons and concrete finishers need high EQ?

Suggested editorial approach: observe communication under schedule pressure and in anomalies through repeated supervised construction or simulated feedback, and do not use a single emotional score to predict safety or competence.

Can the Enneagram be used to judge whether I am suited?

No. The Enneagram is not a tool for career fit or competence assessment and is not used as a recruitment basis in official occupational data; it can be used for self-reflection, but not to decide on skills learning and qualification investment.

How do I use deliverables to judge which direction suits me?

Observe learning through repeated reviewable form measurements, process, self-check, curing and repair records and supervisory feedback; passing one exercise does not prove basic competence or generate operation or acceptance qualifications.

Work pressure, risks and career boundaries

What pressure, risks and career boundaries do cement masons and concrete finishers face at work?

Dust and wet cement contact, falls and person-machine injuries, hazardous energy, repetitive physical work and out-of-scope acceptance are task risk analysis; specific controls follow the jurisdiction and the actual task. For U.S. construction silica dust, check OSHA1926.1153: employers implement engineering, work practice or respiratory controls according to Table1 for the specific equipment, indoors or outdoors and shift length, or handle it through the paragraph (d) exposure assessment route; wet methods and dust collection are not freely interchangeable, and respiratory protection and medical surveillance have applicable conditions. The O*NET 55% exposure to contaminants is not a silica dust measurement, an accident rate or evidence of compliance. For U.S. concrete construction equipment, check 1926.702: hand-guided powered trowels must have a control that cuts off power automatically when the operator releases the handle; for maintenance and servicing that could start unexpectedly and injure someone, all potentially hazardous energy must be locked out and tagged out. Other equipment and cleaning tasks are confirmed under the applicable rules, the manual and the hazardous energy plan, and the industrial 1910 clauses are not applied unconditionally to construction. Articles 28/30/55/57—59 of China's Work Safety Law: safety training and special operation qualifications are separate, procedures must be followed and hazards reported; where an emergency directly endangering personal safety is found, the worker has the right to stop their own work or, in accordance with the law, to take emergency measures and then evacuate, without first obtaining institutional stop-work authorization. Overall project stop/resume work and project acceptance are handled separately under the applicable rules and responsibilities. Articles 24/25/27/32/36—37 of the Regulations on the Administration of Construction Project Work Safety set out general and subcontractor responsibility, list special operations, technical briefing, protection and emergency evacuation, and training, and do not describe all cutting and vibrating operations as special operations.

O*NET tasks and context are not accident rates; health hazards and construction controls are actually checked against OSHA1926.1153, 1926.702 and the Portland Cement guidance, and in China against Work Safety Law Articles 28/30/55/57—59 and Construction Safety Regulations Articles 24—27/32/36—37. Not all project specifications and local qualifications were checked, and suggested editorial steps are not work authorization.

01

Crystalline silica dust and cement skin contact

Typical scenario:Dry cutting and chipping in poorly ventilated places without dust extraction and respiratory protection, or long periods of bare-hand contact with cement slurry and alkaline materials.

Roles most affected:Cement masons and concrete finishers themselves and the dust and skin contact step

Possible consequence:Cutting, grinding and chipping silica-containing materials can create respiratory hazards, and wet cement can burn or cause dermatitis; the hazards are per OSHA, and 55% contaminant exposure, 48% noise and 86% common protective equipment are O*NET context and do not prove a specific silica dust concentration or accident.

How to reduce risk:For U.S. construction silica dust, check OSHA1926.1153: employers implement engineering, work practice or respiratory controls according to Table1 for the specific equipment, indoors or outdoors and shift length, or handle it through the paragraph (d) exposure assessment route; wet methods and dust collection are not freely interchangeable, and respiratory protection and medical surveillance have applicable conditions. The O*NET 55% exposure to contaminants is not a silica dust measurement, an accident rate or evidence of compliance. For wet cement contact, check the OSHA guidance: suitable waterproof gloves and boots must keep the inside clean, and contaminated skin must be washed promptly; barrier creams do not replace protection. Medical surveillance follows the actual statutory triggers, and not everyone is uniformly given an annual examination.

Evidence:O*NET-SOC 47-2051.00 detailed profile (tasks and work activities) · OSHA construction silica dust 1926.1153 (equipment is checked separately under 1926.702) · OSHA wet cement skin guidance 3351

02

Edge, excavation and machinery injuries

Typical scenario:Pouring first and adding edge protection later to meet the programme, or working and resting at the edge of an excavation or within the slewing radius of vehicles.

Roles most affected:Cement masons and concrete finishers themselves and the on-site work organisation position

Possible consequence:Edge, excavation and height work and machinery and vehicle injuries can cause serious personal injury or even death (63% have very high responsibility for the health and safety of others and 21% high responsibility; 56% are exposed to hazardous equipment every day; 44% consider the consequences of error extremely serious).

How to reduce risk:Check the work face, openings, edges, excavations and person-machine separation according to the approved plan; for U.S. fall protection, guardrails, safety nets or personal systems may be used according to the applicable task, and the complete thresholds were not checked this round, so personal safety belts are not specified uniformly for all height work. When protection is unclear, stop your own hazardous work and report, and evacuate in accordance with the law in an emergency.

Evidence:O*NET-SOC 47-2051.00 detailed profile (tasks and work activities) · OSHA construction fall protection 1926.501 · Regulations on the Administration of Construction Project Work Safety

03

Missing equipment and energy isolation

Typical scenario:Cleaning, adjusting or replacing parts while the equipment is running or not de-energised, or removing guards to save trouble.

Roles most affected:Cement masons and concrete finishers themselves and the equipment and maintenance step

Possible consequence:Failure to implement equipment and energy isolation causes serious injuries such as entanglement, crushing and electric shock (56% are exposed to hazardous equipment every day; 50% say the work is not automated at all).

How to reduce risk:For U.S. concrete construction equipment, check 1926.702: hand-guided powered trowels must have a control that cuts off power automatically when the operator releases the handle; for maintenance and servicing that could start unexpectedly and injure someone, all potentially hazardous energy must be locked out and tagged out. Other equipment and cleaning tasks are confirmed under the applicable rules, the manual and the hazardous energy plan, and the industrial 1910 clauses are not applied unconditionally to construction. Temporary electrical work is managed by correspondingly qualified personnel according to the plan, and abnormal equipment must be withdrawn from your own use and reported, not repaired or unguarded by yourself.

Evidence:OSHA concrete equipment 1926.702 · Work Safety Law, Articles 28/30/55/57—59

04

Strain from standing, kneeling and repetitive motions

Typical scenario:Kneeling to finish for long periods without a break, or lifting forms, equipment and materials alone beyond your personal capacity.

Roles most affected:Cement masons and concrete finishers themselves and the crew work organisation step

Possible consequence:Long periods of standing, bending, kneeling, repetitive finishing and lifting cause musculoskeletal strain (82% stand continuously or almost continuously; 96% continuously handle and control objects and tools by hand; 63% perform repetitive motions continuously; 33% bend or twist continuously; 33% kneel, crouch, bend or crawl continuously; 31% keep or regain balance continuously).

How to reduce risk:Suggested editorial ergonomic steps: vary posture and rest according to the task, use handling equipment or teamwork, and use suitable tools and heights; no evidence on the validity of back belts for injury prevention was obtained this round, and back belts are not used to replace controls. If knee pads come into contact with wet cement they must be waterproof as applicable, which does not mean that prolonged kneeling on wet material without engineering controls is permitted.

Evidence:O*NET-SOC 47-2051.00 detailed profile (tasks and work activities) · Suggested editorial risk checks

05

Personal protective equipment unsuitable or failed

Typical scenario:Using an ordinary medical or cotton mask in place of the required certified particulate respirator, or using damaged or unsuitable PPE; the qualified filtering facepiece cannot be rejected on the basis that it is disposable alone.

Roles most affected:Cement masons and concrete finishers themselves and the personal protective equipment management step

Possible consequence:Personal protective equipment that is unsuitable or has failed causes loss of control over exposure and injury (86% wear common protective or safety equipment every day; 24% wear specialized protective or safety equipment every day).

How to reduce risk:Select PPE according to the task hazard assessment and applicable requirements, inspect and replace it, and clean and store it per the product instructions; respirator selection, fit and training follow the required system. Wet cement protection cannot rely on barrier cream, filter media cannot all be changed on the same cycle, and the cleaning and personal use of specialized items follow the rules.

Evidence:OSHA construction silica dust 1926.1153 (equipment is checked separately under 1926.702) · OSHA wet cement skin guidance 3351 · Regulations on the Administration of Construction Project Work Safety

06

Out-of-scope confirmation of acceptance and stop-work judgment

Typical scenario:Verbally promising that pouring this way is fine, or continuing to pour when conditions are not met without leaving a written record.

Roles most affected:Cement masons and concrete finishers themselves and the supervision and main contractor handover step

Possible consequence:Confirming formed-surface elevation, flatness and slope and acceptance beyond your authority, or not stopping work when conditions are not met, makes quality and safety responsibility hard to define.

How to reduce risk:You keep self-check records as required and do not replace formal project acceptance; defects are handled by the actual project responsible parties under the rules. Articles 28/30/55/57—59 of China's Work Safety Law: safety training and special operation qualifications are separate, procedures must be followed and hazards reported; where an emergency directly endangering personal safety is found, the worker has the right to stop their own work or, in accordance with the law, to take emergency measures and then evacuate, without first obtaining institutional stop-work authorization. Overall project stop/resume work and project acceptance are handled separately under the applicable rules and responsibilities. Articles 24/25/27/32/36—37 of the Regulations on the Administration of Construction Project Work Safety set out general and subcontractor responsibility, list special operations, technical briefing, protection and emergency evacuation, and training, and do not describe all cutting and vibrating operations as special operations.

Evidence:Work Safety Law, Articles 28/30/55/57—59 · Regulations on the Administration of Construction Project Work Safety · Suggested editorial risk checks

Entering the field, qualifications and career development

How do I become a cement mason and concrete finisher? Education, qualifications and career path

BLS SOC47-2051 gives a typical entry of no formal educational credential, no related work experience and moderate-term on-the-job training; O*NET Job Zone1—2 is a level-level general preparation description, and 52%/35%/13% are respondents' judgments about the education new hires need, not the educational attainment of incumbents. The certification directory lists 23 items, and the apprenticeship field on the detail page lists 3 approved position titles (including aliases and existing names), which does not mean 3 separate open programmes or that all positions must hold every certification. The specific certification enrollment, fees and maintenance conditions must be checked with the body in each case. The 2022 edition of China's occupational classification code explicitly lists concrete workers as 6-29-01-03 (PDF physical page 535), with tasks covering batching and mixing, pumping and pouring, forming and formwork, curing and repair and equipment maintenance. This overlaps with U.S. 47-2051, but the Chinese scope includes production and conveying, and no complete task-by-task statistical mapping has been established, so the name cannot be used to infer equivalent wages or qualifications. Articles 28/30/55/57—59 of China's Work Safety Law: safety training and special operation qualifications are separate, procedures must be followed and hazards reported; where an emergency directly endangering personal safety is found, the worker has the right to stop their own work or, in accordance with the law, to take emergency measures and then evacuate, without first obtaining institutional stop-work authorization. Overall project stop/resume work and project acceptance are handled separately under the applicable rules and responsibilities. Articles 24/25/27/32/36—37 of the Regulations on the Administration of Construction Project Work Safety set out general and subcontractor responsibility, list special operations, technical briefing, protection and emergency evacuation, and training, and do not describe all cutting and vibrating operations as special operations.

How graduates and career changers can verify and get started

Comparison of entry directions

Entry-level positionsWhat you mainly do early on the jobSuggested job competence checksHow to prove it without experienceDifferences from other directions
Concrete work assistant position (mainly under mentoring)Complete material handling, cleaning, assisted spreading and finishing support under mentoring and supervision, and learn about forms, tools and protection.Suggested editorial checks: education or an equivalent, tolerance for outdoor work and physical effort, compliance with safety instructions and teamwork.Submit practice material containing a tool and protection checklist, elevation and slope exercises and a form inspection sheet.The assistant level is determined by actual training, statutory work categories and task allocation; no assistant title means that all equipment is uniformly prohibited.
Concrete pouring and finishing position (according to work authorization)Independently completes form checking and elevation alignment, pour organisation and consolidation, levelling, finishing, expansion joints and curing.Suggested editorial checks: elevation and slope accuracy, surface flatness and trowelling quality, safety protection and record-keeping habits.Submit a sample containing form alignment records and pouring, finishing and curing self-check records.Operating equipment and entering edge and height work areas are determined by position training and institutional authorization and do not expand automatically with length of service.
Shift lead or quality self-check positionTakes on process scheduling, quality self-checking, mentoring new staff, safety organization, defect repair and handover.Suggested editorial checks: project experience, quality standards, process interfaces and safety organization ability.Submit explanatory material containing process scheduling, a self-check list, safety organization and rectification records.Formal project acceptance is performed by the corresponding project responsible parties, and the statutory right to self-check and to emergency stop of your own work cannot be excluded across the board.
Equipment and process organization positionTakes on equipment use, maintenance, process interfaces, temporary electrical work, energy isolation and crew coordination.Suggested editorial checks: equipment operation and maintenance experience and familiarity with safe electrical practice and isolation rules.Submit explanatory material containing equipment inspection, maintenance, energy isolation and process interfaces.Equipment, electrical work and energy isolation are carried out under institutional rules and authorization and must not replace the institution's equipment management responsibility.
Moving in from adjacent directions (brickmasons and blockmasons, stonemasons, plasterers and stucco masons, terrazzo workers and finishers, reinforcing iron and rebar workers, construction labourers and others)Map your existing experience onto concrete pouring, surface forming, curing and safety requirements.Suggested editorial checks: transferable materials, tools, process and on-site collaboration experience.Submit a work description that translates your existing work experience into the language of pouring, finishing, curing and safety.A role change does not automatically bring equipment operation or inspection and stop-work authority; they must be obtained under the target position's rules and institutional authorization.

What evidence employers usually look for

BLS SOC47-2051 gives a typical entry of no formal educational credential, no related work experience and moderate-term on-the-job training; O*NET Job Zone1—2 is a level-level general preparation description, and 52%/35%/13% are respondents' judgments about the education new hires need, not the educational attainment of incumbents. The certification directory lists 23 items, and the apprenticeship field on the detail page lists 3 approved position titles (including aliases and existing names), which does not mean 3 separate open programmes or that all positions must hold every certification. The specific certification enrollment, fees and maintenance conditions must be checked with the body in each case.

The certification and apprenticeship directories reveal learning directions, and the specific enrollment, registration, fees and maintenance conditions are checked item by item; there is no uniform requirement that only those with seniority may enrol.

This occupation is not marked Bright Outlook; the BLS typical entry requires no formal educational credential and moderate-term on-the-job training, which cannot be applied directly to China.

New hires usually must complete on-site safety and dust and chemical material protection training and obtain process and equipment authorization as required by the institution.

Positions involving cutting, chipping, vibration, temporary electrical work and edge and height work must complete training or obtain qualifications as required by the jurisdiction.

Articles 28/30/55/57—59 of China's Work Safety Law: safety training and special operation qualifications are separate, procedures must be followed and hazards reported; where an emergency directly endangering personal safety is found, the worker has the right to stop their own work or, in accordance with the law, to take emergency measures and then evacuate, without first obtaining institutional stop-work authorization. Overall project stop/resume work and project acceptance are handled separately under the applicable rules and responsibilities. Articles 24/25/27/32/36—37 of the Regulations on the Administration of Construction Project Work Safety set out general and subcontractor responsibility, list special operations, technical briefing, protection and emergency evacuation, and training, and do not describe all cutting and vibrating operations as special operations.

Work activities are led by handling and moving objects (83), inspecting equipment, structures or materials (83), getting information (81), performing general physical activities (80) and scheduling work and activities (80).

Basic skills are led by monitoring (56), speaking (53) and active listening and critical thinking (50 each), with mathematics 41 and science 6; transferable skills are led by coordination and quality control analysis and time management (53 each).

Work styles are led by dependability (77), attention to detail (67) and caution (50); the work context shows 96% continuously handle objects and tools by hand, 82% stand continuously or almost continuously, 84% work outdoors exposed to all weather conditions every day and 55% are exposed to contaminants every day.

The O*NET detail page lists 4 software categories: accounting, analytical/scientific, information retrieval and project management; the Hot recruitment page shows 0 items (Lightcast2025 U.S. national job postings). 0 items refers to that recruitment table, not to the occupation having no software skills, and the number of categories is not a measured adoption rate or a uniform personal threshold.

Common tools and systems include trowels, screeds, power trowels and trowelling tools, edgers, jointers, straightedges and brooms, vibrators, pneumatic breakers and grinding and cutting machines, measuring tools, levels and formwork and embedded item installation tools, and personal protective equipment.

Hot0 items do not mean the detail page has no software; on-site tools are checked against the task and the configuration.

Paper cases and tasks

Mock sample pack: a self-made plan and section sketch of a concrete slab and kerb (including slope direction and expansion joint positions), a form and elevation inspection sheet, a pour sequence and vibrator point layout sheet, a levelling, finishing, expansion joint and edge step sheet, and a curing arrangement and defect determination and repair record sheet; all materials are self-made and contain no real project or structural data.

Tools: measuring tools and angle and slope conversion tables, instructions (illustrative) for trowels, screeds, vibrators and cutting machines, and a personal protective equipment list; do not connect to any real project management system.

Boundary note: the exercises must not be used for real pouring, cutting or on-site work.

Time plan: one 30-minute form check and elevation and slope verification, plus one 40-minute design of pour sequence, vibrator point layout and process timing, plus one 30-minute design of curing arrangements and defect determination and repair methods.

Using the plan and section sketch, write out the key points of form inspection and the elevation and slope verification process, and give volume and thickness estimates.

Write out the process and timing for the pour sequence, vibrator point layout, levelling, finishing, expansion joints and edges, and mark the three steps most prone to surface or joint position problems and the self-check method for each.

Complete a curing arrangement and defect determination and repair record, and write out the stop-work and escalation path for one instance of abnormal weather or equipment.

Write the design elevation, slope and joint positions clearly first, then make the judgment; leave unverifiable conditions blank and mark them as insufficient evidence.

Give two pour sequences and vibrator layouts for the same slab and compare their quality and safety risks.

Keep records following the principle of design or measurement plus the basis for judgment plus how it was handled, and avoid vague descriptions.

The exercises must not be used for real pouring, cutting or grinding, or on-site work.

Do not package the exercise results as statutory qualification, institutional job authorization, or inspection and stop-work authority.

Portfolio and evidence preparation

Job requirement checklist: process scope (large-area pouring and finishing / kerbs, footpaths and gutters / repair and chipping / terrazzo and decorative surfacing / inspection and testing support), the processes you are allowed to take on independently and whether you operate equipment, the working conditions (outdoors, season, night, heat or cold) and programme, whether crystalline silica and chemical materials are involved and the corresponding training and protection requirements, who provides equipment, tools and protective equipment, and the pay method and how quality and rework responsibility are divided.

Note the source and information date for each item; leave unverifiable items blank and mark them as insufficient evidence rather than filling them with guesses.

List separately education and training, industry certification and apprenticeship experience, statutory qualification and work eligibility (equipment and special operations), job hiring and authorization, authority over inspection, stop-work and acceptance, and contracting and subcontracting business qualification, so that they are not conflated.

Ask a working practitioner to review your formwork, elevation, pouring, finishing and curing exercise material, focusing on elevation, slope and joint positions, pour sequence and consolidation density, surface trowelling timing, curing arrangements, and whether protection and stop-work conditions have been omitted.

Keep the review comments together with the reasons for changes, as evidence of whether you can accept process and safety improvements.

One-page review: state the design elevation, slope and joint positions, the formwork and pouring conditions, the pouring, consolidation and finishing results, the expansion joints, curing and repair situation, the protection and work authorization scope, and the parts that are still uncertain.

Turn improvement items into a trackable list and note the verification method (run the elevation and slope verification again or re-check the curing and protection conditions).

Explain the form and elevation inspection sheets, process and self-check and curing record sheets you use, and how you retain evidence of measurements, curing and repair.

Explain which steps used tool assistance (estimating, rotas and record organization) and which judgments must be made by a person (measuring forms and elevation, finishing timing and appearance, joint positions and slope, and curing and stop-work judgments).

Recruitment, probation and authorization boundaries

StageWhat may be assessedObservation evidenceUsage boundaries
Before applyingCheck the job duties (whether they lean toward large-area pouring and finishing, kerbs, footpaths and gutters, repair and chipping, terrazzo and decorative surfacing, or inspection and testing support), whether you carry responsibility for directing the pour and organizing crews and equipment, the working conditions (outdoors, season, night, heat or cold) and programme, and whether crystalline silica and chemical materials are involved and the corresponding training and protection requirements.Material describing project experience, the processes you can take on and a tool list; be able to explain how you ensure elevation, slope, curing and self-checks are traceable.Do not treat having helped a family member finish a small patch of floor as large-area formed-surface and curing ability; samples are only a reference for ability.
During the interviewScenario question: what would you do if, during form inspection, you found inadequate support and rain was forecast that day, while the programme was very tight.Be able to explain stopping work first and measuring and recording the problem, raising it in writing and requiring it to be dealt with or confirmed first, working under the authorized scope according to the confirmed plan, and how to report to the shift lead and supervisor when uncertain.A simulated answer does not grant formal acceptance or resumption authority, but does not exclude stopping your own work and evacuating in accordance with the law in an emergency endangering personal safety.
Probation periodTake on assisted spreading, cleaning and finishing support under mentoring and authorization, and accept elevation, surface and protection checks.Accurate elevation and slope, surface flatness and trowelling in place, expansion joints and curing executed to specification, protection in place, complete records, and timely escalation of anomalies.Do not operate cutting, vibrating and pneumatic breaker equipment without authorization or enter edge and excavation areas; when formwork, weather, materials or equipment are abnormal, stop work first and report.
Conversion to regular employment assessmentMainly based on elevation and surface quality, safety protection, records and collaboration performance.Can maintain process, protection and record-keeping habits under programme and weather pressure, and can accept review comments and improve immediately.Conversion to regular employment does not automatically grant qualifications for new equipment or special operations or acceptance authority; emergency stop of your own work and evacuation follow statutory rights and cannot wait for additional authorization.

Seven-day progressive experience

  1. 01

    Career boundary reading: read the occupation summary and detailed profile for O*NET 47-2051.00 and write down what this occupation does and does not do, and where the boundaries of equipment operation and inspection and stop-work authority come from.

    Output: a one-page task and authorization boundary comparison table, with the source noted for each item.

  2. 02

    Materials and tools review: compile a list of commonly used tools, equipment, materials and protective equipment.

    Output: a tool, equipment and protection checklist.

  3. 03

    Forms and elevation: using self-made plan and section sketches, complete form inspection and elevation, slope and volume verification.

    Output: a form, elevation and volume verification record.

  4. 04

    Pour plan: write out the pour sequence and vibrator point layout and the levelling, finishing, expansion joint and edge steps and timing.

    Output: a note on pouring, finishing and joint position steps.

  5. 05

    Curing and repair: design a curing arrangement and defect determination and repair record and write out two defect handling scenarios.

    Output: a sample curing and repair record.

  6. 06

    Safety and protection: write out the dust, skin contact, fall, machinery and temporary electrical protection and equipment energy isolation and stop-work path.

    Output: a note on work safety, protection and stopping and escalating.

  7. 07

    Decision review: organize the six-day outputs into a reviewable sample and decide whether to keep investing, pause or switch to an adjacent direction.

    Output: a seven-day judgment record.

Judgment questions after seven days

  • Continue: you can complete all the outputs within seven days and are willing to accept item-by-item checks on forms, elevation, surface quality, safety protection and records.
  • Pause: you can complete the exercises but find it hard to adapt to outdoor all-weather work, long periods of standing and repetitive physical work, or you do not accept the requirement to do dust and skin contact protection and stopping and escalating to the rules.
  • Switch direction: if you would rather do unit masonry, compare brickmasons and blockmasons; if you would rather fabricate and install natural stone, compare stonemasons; if you would rather do wall plastering and finishes, compare plasterers and stucco masons.
  • Verify employment terms: if the target position is large-area pouring and finishing, kerbs, footpaths and gutters, repair and chipping, terrazzo and decorative surfacing, or inspection and testing support, first verify the process scope and equipment operation authorization and the working conditions and pay method and how rework responsibility is divided.
  • Fill in the evidence: organize the seven-day outputs into a portfolio containing formwork, elevation, pouring, finishing, curing and protection samples, for job applications or internal transfers.
  • Cost assessment: put training, industry certification and the necessary equipment and special operations qualifications and refresher training into a written plan.
  • Supplement: if you are still unsure, first give the seven-day outputs to a working practitioner for review, then decide whether to invest in long-term work in the occupation.

Qualification choices

Qualification / statusWho it mainly suitsPractical role in job huntingWhether it is a general hiring thresholdApplication / registration conditionsInvestment levelImportant limitations
Education (checked separately for the target position)Job seekers who want to enter this occupationAffects hiring thresholds and the professional direction of some positions, but does not determine the process scope or equipment you can take on.BLS SOC47-2051 gives a typical entry of no formal educational credential, no related work experience and moderate-term on-the-job training; O*NET Job Zone1—2 is a level-level general preparation description, and 52%/35%/13% are respondents' judgments about the education new hires need, not the educational attainment of incumbents. The certification directory lists 23 items, and the apprenticeship field on the detail page lists 3 approved position titles (including aliases and existing names), which does not mean 3 separate open programmes or that all positions must hold every certification. The specific certification enrollment, fees and maintenance conditions must be checked with the body in each case.O*NET52/35/13 is the judgment about the education new hires need; admission to specific programmes and recruitment requirements are checked separately.Invest according to programme length and tuition.Education does not equal equipment operation or inspection and stop-work authorization or statutory work qualifications.
On-the-job training (hands-on formwork, pouring, finishing and curing)All new hiresDetermines whether you can independently take on form alignment, pour organisation, finishing, forming and curing.The precise BLS typical entry for this occupation is moderate-term on-the-job training; the specific process, safety content and project assessment follow the actual requirements.Common forms are mentoring, shadowing, internal assessment and process reviews.Invest according to time on the job.Training records do not automatically convert into equipment operation or inspection and stop-work authority.
Industry certification and apprenticeship experience (such as the related certifications from the American Concrete Institute International, the International Code Council and NCCER)Incumbents and those who want to improve their professional recognitionAffects professional recognition and competitiveness for some positions.These are industry or professional body certifications and registered apprenticeship: the O*NET occupation page lists 23 certifications in total (including Commercial/Industrial Flatwork Specialist - Surface Treatments, Reinforced Concrete Special Inspector, Concrete Finisher Assessment and Concrete Slab Moisture Testing Technician), and lists 3 position titles approved by the U.S. Department of Labor for registered apprenticeship.The enrollment, examination and maintenance of the 23 specific certifications all differ; this round only checked the directory, not the rules for each. The 3 apprenticeship titles include aliases and are not 3 separate open programmes.Invest according to training, exam and maintenance costs.Industry certification and apprenticeship experience do not equal statutory qualification or institutional job authorization and inspection and stop-work authority.
Equipment operation and special operation qualificationsPeople who operate cutting, vibrating and pneumatic breaker, lifting, machinery and temporary electrical equipmentDetermines whether the related equipment can be operated independently and the corresponding work faces entered.Articles 28/30/55/57—59 of China's Work Safety Law: safety training and special operation qualifications are separate, procedures must be followed and hazards reported; where an emergency directly endangering personal safety is found, the worker has the right to stop their own work or, in accordance with the law, to take emergency measures and then evacuate, without first obtaining institutional stop-work authorization. Overall project stop/resume work and project acceptance are handled separately under the applicable rules and responsibilities. Articles 24/25/27/32/36—37 of the Regulations on the Administration of Construction Project Work Safety set out general and subcontractor responsibility, list special operations, technical briefing, protection and emergency evacuation, and training, and do not describe all cutting and vibrating operations as special operations. For U.S. concrete construction equipment, check 1926.702: hand-guided powered trowels must have a control that cuts off power automatically when the operator releases the handle; for maintenance and servicing that could start unexpectedly and injure someone, all potentially hazardous energy must be locked out and tagged out. Other equipment and cleaning tasks are confirmed under the applicable rules, the manual and the hazardous energy plan, and the industrial 1910 clauses are not applied unconditionally to construction.Training is usually required separately by equipment and work category, and records must be kept.Invest according to training and refresher training.Do not operate without training and authorization; abnormal or incomplete equipment must be stopped and reported.
Dust and chemical material protection trainingPeople who come into contact with crystalline silica, cement and chemical materialsDetermines whether dust can be controlled to procedure and skin and respiratory protection used.For U.S. construction silica dust, check OSHA1926.1153: employers implement engineering/work-practice/respiratory controls according to Table1 for the specific equipment, indoors or outdoors and shift length, or handle it through the paragraph (d) exposure assessment route; wet methods and dust collection are not freely interchangeable, and respiratory protection and medical surveillance have applicable conditions. The O*NET 55% exposure to contaminants is not a silica dust measurement, an accident rate or evidence of compliance.U.S. silica medical surveillance under that clause applies to people required under that clause to use respirators for at least 30 days per year; other exposure and Chinese occupational health requirements are checked separately against the actual task, and not all personnel are uniformly given the same examination.Invest according to training and refresher training and protective consumables.Do not perform the related work without training and issued certified protection; failed protection must be stopped and replaced.
Contracting and subcontracting business qualificationOrganizations that take on specialist concrete, masonry and decorative surfacing workDetermines whether the organization can take on the corresponding specialist work.This is a requirement of the jurisdiction's and industry's business and qualification management system, not an individual qualification.The specific contracting categories and U.S. state and local and Chinese institutional qualification rules were not obtained this round and must be checked against the target business scope; individual training does not replace institutional qualification.Invest according to institutional and compliance costs.An individual position cannot replace the organization's business qualification; business matters are handled according to the requirements of the organization and the competent department.

Qualifications and exercise boundaries

Notes on using recruitment samples

Forms and pouring direction

01

Entry role: concrete work assistant position.

Typical scope:Accountable for accurate forms, elevation and slope.

Readiness evidence:Form and elevation checking exercises, slope conversion exercises and a protection checklist.

Credential boundary:Suggested editorial path: first learn the relevant basic measuring, process and recording; no sample of Chinese education thresholds was obtained, the precise U.S. typical entry requires no formal educational credential, and project recruitment is checked separately.

Next moves:Learn form checking, elevation and slope verification, material handling and assisted spreading under mentoring.

02

Advanced role: concrete pouring position.

Typical scope:Accountable for pour quality, process interfaces and safety organization.

Readiness evidence:Reviewed form and elevation records and pouring, consolidation and embedded item records.

Credential boundary:Has formwork and pouring experience and holds job work authorization.

Next moves:Independently completes form checking and alignment, pour organisation, spreading, consolidation and embedded item installation.

03

Mature role: pouring and equipment organization position.

Typical scope:Accountable for the feasibility of the plan and process quality.

Readiness evidence:Pour plans, process interfaces, equipment organization and mentoring records.

Credential boundary:Has several years of project, process and equipment coordination experience.

Next moves:Takes on pour plans, process interfaces, equipment organization and mentoring new staff.

04

Responsibility role: site management position.

Typical scope:Accountable for construction organization, delivery and work safety as a whole.

Readiness evidence:Construction organization documents and crew, equipment and cost management records.

Credential boundary:Has construction organization, crew, cost and safety management experience.

Next moves:Responsible for construction organization, crews, equipment, cost and safety management.

Surface finishing and forming direction

01

Entry role: finishing assistant position.

Typical scope:Accountable for levelling and trowelling quality and tool maintenance.

Readiness evidence:Finishing and trowelling exercises and a tool and protection checklist.

Credential boundary:Suggested editorial path: first learn the relevant basic measuring, process and recording; no sample of Chinese education thresholds was obtained, the precise U.S. typical entry requires no formal educational credential, and project recruitment is checked separately.

Next moves:Learn to use trowels and screeds and assist with surface levelling and trowelling and tool maintenance under mentoring.

02

Advanced role: finishing and forming position.

Typical scope:Accountable for surface quality, joint positions and timely curing.

Readiness evidence:Reviewed finishing, finish, joint position and curing records.

Credential boundary:Has finishing and forming experience and holds job authorization.

Next moves:Independently completes levelling, finishing, trowelling, the specified finish, expansion joint and edge forming, curing and surface treatment.

03

Mature role: surface craft responsible position.

Typical scope:Accountable for craft standards and surface consistency.

Readiness evidence:Surface craft standards, appearance control and mentoring records.

Credential boundary:Has several years of surface craft and appearance control experience.

Next moves:Takes on surface craft standards, appearance control, mentoring new staff and defect determination.

04

Responsibility role: delivery quality management position.

Typical scope:Accountable for delivery quality, acceptance support and cost as a whole.

Readiness evidence:Delivery quality, acceptance support and cost management records.

Credential boundary:Has quality, acceptance support and cost management experience.

Next moves:Responsible for delivery quality, acceptance support, defect handling, cost and client communication management.

Inspection and repair direction

01

Entry role: repair assistant position.

Typical scope:Accountable for defect records and cleaning and repair support.

Readiness evidence:Defect identification exercises, sample repair records and a protection checklist.

Credential boundary:Suggested editorial path: first learn the relevant basic measuring, process and recording; no sample of Chinese education thresholds was obtained, the precise U.S. typical entry requires no formal educational credential, and project recruitment is checked separately.

Next moves:Learn defect identification, chipping, cleaning, grouting and assisted levelling and record organization under mentoring.

02

Advanced role: repair and quality self-check position.

Typical scope:Accountable for repair quality and traceability.

Readiness evidence:Reviewed defect determination, repair and re-check records.

Credential boundary:Has repair and inspection experience and holds job authorization.

Next moves:Independently completes judging the cause of defects, chipping, cleaning, grouting, levelling, curing and re-checking.

03

Mature role: inspection and repair responsible position.

Typical scope:Accountable for craft standards and record traceability.

Readiness evidence:Repair craft standards, test sampling, record traceability and mentoring records.

Credential boundary:Has several years of repair and testing support experience.

Next moves:Takes on repair craft standards, test sampling, record traceability and mentoring new staff.

04

Responsibility role: quality system management position.

Typical scope:Accountable for delivery quality, compliance and safety as a whole.

Readiness evidence:Quality system, delivery, safety and cost management records.

Credential boundary:Has quality system, delivery and safety management experience.

Next moves:Responsible for the quality system, delivery, safety, cost and team organization.

Capability ladder: what demonstrates readiness?

  1. 01

    Entry: can complete assistant work and on-site support under mentoring

    Can complete material handling and cleaning and assist with spreading and finishing under mentoring and supervision, and identify the safety and stop-work boundaries that require asking for guidance.

  2. 02

    Advanced: can independently take on pouring, finishing and curing

    Can independently complete form checking and elevation and slope alignment, pour organisation and consolidation, levelling, finishing, expansion joints and curing.

  3. 03

    Mature: can take on shift lead and quality and safety organization responsibility

    Can take on process scheduling, quality self-checking, mentoring new staff, safety organization, defect repair and handover.

  4. 04

    Responsibility: construction organization and delivery accountability

    Can be responsible for construction organization, crews, equipment, cost and safety management, and be accountable for delivery and compliance requirements.

Career prospects and related occupation transitions

What are the prospects for cement masons and concrete finishers? Which related occupations can I move to?

Precise BLS SOC47-2051: employment was 204,800 in 2025 and is projected to be 208,100 in 2035, a net increase of 3,300, or 1.6% growth, with about 13,600 openings per year on average over 2025—2035, and the self-employed share was 1.5% in 2025. OOH rounds the growth to 2%; openings include growth and replacement demand such as transfers out and exits, and are not 13600 new additions each year or a dedicated AI projection. The national annual median wage is 57020; the O*NET industry distribution is construction 93%. National Bureau of Statistics 2025 average annual wages for construction: 92,036 CNY for non-private units and 66,275 CNY for private units (pre-tax); this is all-position urban unit industry background, not the national wage, starting pay or upper and lower limits for concrete workers or for this U.S. occupation, and is not converted into an occupational monthly wage. Project cycles, weather and technology deployment must be checked against actual opportunities, and there is no occupational AI job causal projection.

Three sources, three different measures

cm-ep-2025-2035

2025—2035

United States · exact

1.6% (2025—2035)

Employment growth rate (about 13,600 annual openings)

Precise BLS SOC47-2051: employment was 204,800 in 2025 and is projected to be 208,100 in 2035, a net increase of 3,300, or 1.6% growth, with about 13,600 openings per year on average over 2025—2035, and the self-employed share was 1.5% in 2025. OOH rounds the growth to 2%; openings include growth and replacement demand such as transfers out and exits, and are not 13600 new additions each year or a dedicated AI projection.

Does not establish:It is a statistic for the occupational group and does not constitute an employment guarantee for any individual project; demand is affected by infrastructure and building investment cycles and the number of seasonally workable days, and growth and annual openings are different measures, with the volume of openings coming mainly from replacement demand.

cm-wages-2025

May 2025 OEWS (annual and hourly)

United States · exact

Hourly median 27.41 USD and annual median 57,020 USD; hourly 10th to 90th percentile 18.84 to 41.10 USD and annual 10th to 90th percentile 39,190 to 85,480 USD

Wage percentiles and median (annual and hourly)

BLS May 2025 OEWS data; this occupation page does not mark Bright Outlook and lists it as Job Zone 1-2 (SVP below 6.0).

Does not establish:The median is not entry-level pay and does not constitute an individual job offer; percentile figures cannot be treated as a starting-pay promise; this occupation is usually trained mainly through on-the-job mentoring, and training does not guarantee income at this level.

cm-nbs-2025

2025

Chinese mainland · industry_proxy

National Bureau of Statistics 2025 average annual wages for construction: 92,036 CNY for non-private units and 66,275 CNY for private units (pre-tax); this is all-position urban unit industry background, not the national wage, starting pay or upper and lower limits for concrete workers or for this U.S. occupation, and is not converted into an occupational monthly wage. Precise occupational monthly wages were not obtained.

Construction unit average annual wage background and the occupational gap

National Bureau of Statistics 2025 average annual wages for construction: 92,036 CNY for non-private units and 66,275 CNY for private units (pre-tax); this is all-position urban unit industry background, not the national wage, starting pay or upper and lower limits for concrete workers or for this U.S. occupation, and is not converted into an occupational monthly wage.

Does not establish:Industry background is not a substitute for a precise occupational monthly wage or percentile or starting pay, and is not converted and compared.

Where can your current capabilities transfer?

These are capability relationships, not automatic promotions or credential waivers.

Tile and stone setters

Editorial comparison: medium distance: both are in the surfacing stage, and the material and process shift from cast-in-place concrete to unit laying. No quantified distance or transfer success rate was obtained; the target material, process and qualifications are checked separately.

Transfers:What transfers is substrate preparation, surface flatness and finished product protection experience.

Build next:You need to build up tile and stone bonding, jointing and waterproofing processes.

View career profile

Floor layers, except carpet, wood and hard tiles

Editorial comparison: medium distance: both are in flooring work, but the material shifts from cast-in-place concrete to resilient and special surfaces. No quantified distance or transfer success rate was obtained; the target material, process and qualifications are checked separately.

Transfers:What transfers is substrate inspection and surface flatness experience.

Build next:You need to build up resilient and special flooring material installation, adhesive and joint control ability.

View career profile

Carpenters

Editorial comparison: medium distance: both are on the building site, and the work object shifts from formed concrete surfaces to timber framing and fixtures. No quantified distance or transfer success rate was obtained; the target material, process and qualifications are checked separately.

Transfers:What transfers is drawing reading, setting out, dimensions and tool use experience.

Build next:You need to build up timber framing and door, window, floor and fixture installation ability.

View career profile

Construction labourers

Editorial comparison: medium distance; both are on the construction site, and the target work may span more support processes. No quantified distance or success rate was obtained; the specific tasks and qualifications are checked separately.

Transfers:What transfers is on-site collaboration, material identification and safety checking experience.

Build next:You need to build up site preparation, handling, earthworks and specific tool training according to the target position.

View career profile

Reinforcing iron and rebar workers

Editorial comparison: relatively close but at a different process point: both are in concrete structural work, and this occupation organises the pour after reinforcement is accepted. No quantified distance or transfer success rate was obtained; the target material, process and qualifications are checked separately.

Transfers:What transfers is drawing reading, dimensional control and on-site collaboration experience.

Build next:You need to build up reinforcement bar size, spacing, cover and tying and positioning ability.

View career profile

Terrazzo workers and finishers

Editorial comparison: medium distance; both are on the construction site, and the target work may span more support processes. No quantified distance or success rate was obtained; the specific tasks and qualifications are checked separately.

Transfers:What transfers is on-site collaboration, material identification and safety checking experience.

Build next:You need to build up site preparation, handling, earthworks and specific tool training according to the target position.

View career profile

Plasterers and stucco masons

Editorial comparison: relatively close: both are in the surface forming and finishing stage, but the work surface shifts from floors and slabs to walls and ceilings. No quantified distance or transfer success rate was obtained; the target material, process and qualifications are checked separately.

Transfers:What transfers is levelling, trowelling and surface appearance control experience.

Build next:You need to build up wall and ceiling plastering and stucco finishing and levelling ability.

View career profile

Stonemasons

Editorial comparison: medium distance: both work on formed surfaces, and the material shifts from fresh concrete to natural stone. No quantified distance or transfer success rate was obtained; the target material, process and qualifications are checked separately.

Transfers:What transfers is dimensions, joints and on-site collaboration experience.

Build next:You need to build up natural stone fabrication, installation and joint control ability.

View career profile

Frequently asked questions and sources

What do cement masons and concrete finishers do every day?

Cement masons and concrete finishers level and finish surfaces, check slopes and elevations and document issues for the next crew.

What risks should I pay attention to in advance in this job?

The main risks include respiratory and skin exposure to crystalline silica dust and cement and chemical materials, falls from edges, excavations and heights and machinery and vehicle injuries, entanglement and crushing from failure to implement equipment and energy isolation, ergonomic injury from long periods of standing, bending, kneeling, repetitive motions and lifting, exposure from unsuitable or failed personal protective equipment, and quality and safety responsibility risks from confirming formed-surface acceptance and stop-work judgments beyond your authority; controls depend on confirming forms, work faces and safety conditions before work, wet methods, ventilation and protection for dust and chemical materials, fall, excavation, machinery and temporary electrical protection and equipment energy isolation and lockout/tagout, correct selection, inspection and replacement of personal protective equipment, and a clear stop-work and escalation path.

How do I judge whether this job suits me?

The fit signals are being able to complete pouring, levelling, finishing and curing in sequence within the initial set window, being able to check forms, elevation and slope clearly, being able to keep wearing protection outdoors and in dust and noise, and stopping and reporting first when forms are not aligned or the weather or equipment is abnormal; the key is whether you have reviewable form and elevation records, pouring, finishing and curing records, and defect and repair records, rather than only having helped a family member finish a small patch of floor or a piece of site experience.

Which steps will AI and automation change?

Drafting process sequences and rotas, estimating volumes and material quantities, organizing curing and inspection records, and defect lists and progress and hours statistics can all be assisted; measuring forms and elevation, the actual operations of pour organisation, consolidation and finishing, judging control joints, slope and surface quality, and safety protection and stopping and escalating are still checked and owned by authorized personnel.

Which steps must keep human checks?

The actual measurement of form support, sealing, elevation and slope, the actual consistency and initial set of fresh concrete, surface absorption and finishing timing and trowelled appearance, the actual positions of control joints, edges and slope, and curing conditions and repair methods must all be completed and documented by authorized or qualified people.

What qualifications do I need to check to enter this occupation?

You need to check separately the education and training threshold (O*NET lists it as Job Zone 1-2; in the education survey 52% think less than a high school diploma is enough, 35% think a high school diploma or equivalent is needed and 13% think a postsecondary education certificate is needed), industry certification and apprenticeship experience (the occupation page lists 23 certifications and 3 registered apprenticeship positions), statutory qualification and work eligibility (equipment and special operations and so on), and job authorization and equipment operation and stop-work authority; this occupation is usually not a uniformly licensed one, and dust, machinery, temporary electrical work and confined space work in Chinese mainland have separate rules, and neither education nor training automatically grants equipment operation or inspection and stop-work decision authority.

How are the physical and environmental demands of this job?

The O*NET work context shows: 96% continuously or almost continuously handle and control objects and tools by hand, 82% stand continuously or almost continuously, 84% work outdoors exposed to all weather conditions every day, 55% are exposed to contaminants every day (including cement dust and alkaline materials), 63% perform repetitive motions continuously, 48% are exposed to distracting or uncomfortable noise every day, 70% consider precision or accuracy extremely important, 86% wear common protective equipment every day, 59% consider the pace determined by equipment speed extremely important, 63% have very high responsibility for the health and safety of others, 44% consider the consequences of error extremely serious, 52% face time pressure every day and 56% are exposed to hazardous equipment every day.

What are the working hours and working style like?

Mainly outdoor and on-site work, and the need to complete a pour continuously brings crunch periods and irregular hours, with schedules affected by season, weather and programme milestones; the work context shows 52% face time pressure every day, 84% work outdoors exposed to all weather conditions every day, 82% stand continuously or almost continuously, 25% have a lot of freedom in determining tasks and priorities, 62% make decisions every day and 50% say the work is not automated at all; the working style is built around form checking and alignment, pour organisation and spreading and consolidation, levelling, finishing and forming, curing and defect repair, and records and handover.

How do I judge career prospects and transitions?

This occupation page shows 206,700 people employed in 2024, and BLS projects employment growth of 2% over 2024—2034 (Slower than average, 1% to 2%), with projected employment of 210,400 in 2034 and about 14,300 job openings per year (including replacement demand such as separations and retirements); this occupation page does not mark Bright Outlook. Demand is affected by infrastructure, building, municipal and road investment cycles, repair and renovation of existing buildings and pavements, the number of seasonally and weather workable days, and the supply of people with formwork, finishing, curing and repair ability. Slower growth does not mean no opportunities, and annual openings come mainly from replacement demand. Switching to adjacent directions (brickmasons and blockmasons, stonemasons, plasterers and stucco masons, terrazzo workers and finishers, reinforcing iron and rebar workers, construction labourers and others) requires building up the corresponding work qualification and authorization evidence.

Why can't U.S. wage figures and Chinese mainland figures be converted into each other?

U.S. wages are the national BLS May 2025 OEWS framing shown on this occupation page (hourly median 27.41 USD, annual median 57,020 USD, hourly 10th to 90th percentile 18.84 to 41.10 USD, annual 10th to 90th percentile 39,190 to 85,480 USD); for Chinese mainland, this evidence route did not obtain a precise national occupational wage framing for this occupation (currently authoritative public sources only provide industry or broader occupational framings), and this route requires showing the gap rather than using a proxy figure, so this page publishes no Chinese mainland figure; the two framings and periods differ and cannot be compared side by side or converted.

What tools and skills do I need to master?

The technology list on this occupation page (Hot Technologies entry) lists no software skills (the page shows 0 items); the core abilities are knowledge of concrete materials and pouring and finishing processes, form and elevation and slope control, operation of trowels, screeds, power trowels, vibrators and cutting machines, control joint, edge and finish treatment, curing and defect determination and repair, and protection against crystalline silica, dust and chemical materials and on-site safety ability.

What should I pay attention to in work safety and protection?

Use wet methods or dust-collecting machines for cutting, grinding and chipping and keep dust extraction effective; select and correctly wear respiratory protection, goggles, impermeable gloves, long sleeves and leg protection according to the exposure assessment; wash promptly after cement contact and use skin care; set up protection and personal fall arrest systems as required for edge, excavation and height work; keep people separated from machinery and vehicles in operating areas; perform lockout/tagout and energy isolation for equipment servicing and cleaning; provide earthing and residual current protection for temporary electrical work; arrange reasonable rotation and rest and use knee pads and back support aids; when protection is missing or equipment is abnormal, stop first and report.

What are the working environment and collaboration style of cement masons and concrete finishers like?

84% work outdoors exposed to all weather conditions every day, 82% stand continuously or almost continuously, 75% have face-to-face discussions every day, 59% are in contact with others continuously, 66% have very high responsibility for the work results of others and 52% face time pressure every day; you need to communicate with design, supervision, main contractor and project management personnel, tanker drivers and pumping and transport personnel, rebar and formwork and other following trades, and material suppliers, and complete pouring, forming and curing to the design documents and specifications and institutional procedures while keeping evidence.

Sources

FermatMind editorial note: the body text is verified against occupational tasks, wages, projections and construction regulations; tool uses, fit behavior observations, development levels and transfer distance are editorial analysis and were not treated as measured or real recruitment evidence.

Verified against sources on 2026-10-09 this round; O*NET2026, U.S. wages 2025, projections 2025—2035, Hot Lightcast2025, China unit wages 2025, code 2022. The specific Articles cited in the 2021 amended Work Safety Law and the Regulations; NRMCA CIP14 is process guidance, not a mandatory specification. Specific state and local qualifications were not checked.

Sources: O*NET details/industry/Hot Technologies/certification/national wages, precise BLS projections and OOH (group industry wages marked as a proxy), National Bureau of Statistics 2025 construction wages, the 2022 code text for concrete workers, China's Work Safety Law and Construction Safety Regulations, the OSHA construction silica dust and equipment and wet cement guidance, and the NRMCA CIP14 process guidance; ILO is used only for the exposure framework.

  • O*NET-SOC 47-2051.00 detailed profile (tasks and work activities)O*NET OnLine|United States|Page updated 2026; accessed 2026-09-16|Primary document
    View original source:O*NET-SOC 47-2051.00 detailed profile (tasks and work activities)
    • Supports the 26 official O*NET 47-2051.00 tasks and work activities (U.S. framing); the core tasks include checking that forms are correctly constructed (80), setting and aligning forms to the required slope and depth (78), spreading, levelling and finishing concrete (77), monitoring the effect of wind and heat or cold on curing (75) and forming control joints and edges (72); work activities are led by handling and moving objects (83), inspecting equipment, structures or materials (83) and getting information (81).
    • Page updated 2026; accessed 2026-09-16

    Limitations:The task list describes the work of the occupational group and does not mean every position carries out all 26 tasks, nor does it constitute equipment operation qualifications or inspection and stop-work authority or institutional job authorization.

  • O*NET-SOC 47-2051.00 occupation summaryO*NET OnLine|United States|Page updated 2026; accessed 2026-09-16|Primary document
    View original source:O*NET-SOC 47-2051.00 occupation summary
    • Supports the occupational identity, the original official duties, the preparation level (Job Zone 1-2, SVP below 6.0), the fact that Bright Outlook is not marked, the RC interest code and work styles, and the related occupation comparison.
    • Page updated 2026; accessed 2026-09-16

    Limitations:U.S. occupational classification does not directly prove position identity, qualifications and equipment operation arrangements in Chinese mainland; this occupation page does not mark Bright Outlook and lists it as Job Zone 1-2 (SVP below 6.0).

  • O*NET-SOC 47-2051.00 industry distributionO*NET OnLine|United States|Industry distribution framing; accessed 2026-09-16|Primary document
    View original source:O*NET-SOC 47-2051.00 industry distribution
    • Supports the industry distribution: construction 93%, other industries 7%.
    • Industry distribution framing; accessed 2026-09-16

    Limitations:The industry distribution describes statistical categories (construction 93%, other industries 7%) and is not used to infer wages or employment size by industry.

  • O*NET-SOC 47-2051.00 technology list (employer recruitment technology signals)O*NET OnLine|United States|Recruitment technology information comes from Lightcast 2025 U.S. national job postings; accessed 2026-09-16|Primary document
    View original source:O*NET-SOC 47-2051.00 technology list (employer recruitment technology signals)
    • Supports the fact that the technology list on this occupation page lists no software skills (the page shows 0 items); the data source is Lightcast 2025 U.S. national job postings.
    • Recruitment technology information comes from Lightcast 2025 U.S. national job postings; accessed 2026-09-16

    Limitations:This page lists no software skills (the page shows 0 items); the absence of a listing does not mean the occupation needs no tool or equipment ability, nor that the position has been replaced.

  • O*NET-SOC 47-2051.00 Training and Education Information (preparation level and training entry)O*NET OnLine|United States|Page updated 2026; accessed 2026-09-16|Primary document
    View original source:O*NET-SOC 47-2051.00 Training and Education Information (preparation level and training entry)
    • Supports the preparation level (Job Zone 1-2, SVP below 6.0) and the fact that these occupations usually require a high school diploma or equivalent while some may not, used to explain the education and training entry.
    • Page updated 2026; accessed 2026-09-16

    Limitations:This occupation is listed as Job Zone 1-2 (SVP below 6.0) and usually requires a high school diploma or equivalent, though some occupations may not; the educational attainment is an estimate by respondents and does not constitute a recommendation for any program or institution.

  • O*NET-SOC 47-2051.00 Certification Information (professional certification and apprenticeship discovery entry)O*NET OnLine|United States|Page updated 2026; accessed 2026-09-16|Primary document
    View original source:O*NET-SOC 47-2051.00 Certification Information (professional certification and apprenticeship discovery entry)
    • Supports the professional certification and registered apprenticeship discovery entry for this occupation (the page lists 23 certifications and 3 registered apprenticeship position titles in total), used to explain that certification and apprenticeship experience are industry or professional recognition and do not equal statutory qualification or institutional job authorization and inspection and stop-work authority.
    • Page updated 2026; accessed 2026-09-16

    Limitations:This page lists 23 certifications (including Commercial/Industrial Flatwork Specialist - Surface Treatments, Aggregate Base Testing Technician, Shotcrete Nozzleman (Dry-Mix Process) and Concrete Strength Testing Technician from the American Concrete Institute International, Reinforced Concrete Special Inspector from the International Code Council, Concrete Finisher Assessment and Concrete Construction from the National Center for Construction Education and Research, and Concrete Slab Moisture Testing Technician from the International Concrete Repair Institute), and lists 3 position titles approved by the U.S. Department of Labor for registered apprenticeship (Cement Mason and Cement Mason Concrete Finisher, among others); certification and apprenticeship experience are industry or professional recognition and do not equal statutory qualification or institutional job authorization and inspection and stop-work authority.

  • BLS occupational employment and wage statistics (47-2051, May 2025 OEWS)U.S. Bureau of Labor Statistics|United States|May 2025 OEWS; accessed 2026-09-16|Primary document
    View original source:BLS occupational employment and wage statistics (47-2051, May 2025 OEWS)
    • Supports the national hourly median of 27.41 USD and annual median of 57,020 USD for this occupation, and the hourly 10th, 25th, 75th and 90th percentiles of 18.84, 22.60, 32.15 and 41.10 USD and annual 10th, 25th, 75th and 90th percentiles of 39,190, 47,010, 66,870 and 85,480 USD (May 2025 OEWS).
    • May 2025 OEWS; accessed 2026-09-16

    Limitations:This framing gives a national hourly median of 27.41 USD and an annual median of 57,020 USD for this occupation, with hourly 10th, 25th, 75th and 90th percentiles of 18.84, 22.60, 32.15 and 41.10 USD and annual 10th, 25th, 75th and 90th percentiles of 39,190, 47,010, 66,870 and 85,480 USD; percentile figures are not a starting-pay promise.

  • BLS occupational employment and wage projections table (the employment and projection fields shown on this occupation page)U.S. Bureau of Labor Statistics|United States|2024—2034 projection framing; accessed 2026-09-16|Primary document
    View original source:BLS occupational employment and wage projections table (the employment and projection fields shown on this occupation page)
    • Supports the employment and projection framing: 206,700 people employed in 2024, projected growth of 2% over 2024—2034 (Slower than average, 1% to 2%), projected employment of 210,400 in 2034 and about 14,300 job openings per year; this occupation page does not mark Bright Outlook; also used to explain that growth and annual openings are different measures, that the large volume of openings comes mainly from replacement demand, and that demand is affected by infrastructure investment cycles and the number of seasonally workable days.
    • 2024—2034 projection framing; accessed 2026-09-16

    Limitations:This occupation page lists it as Job Zone 1-2 (SVP below 6.0) and does not mark Bright Outlook; the employment and projection use the 2024—2034 framing shown on this page (206,700 people employed in 2024, growth of 2% (Slower than average, 1% to 2%), projected employment of 210,400 in 2034 and about 14,300 openings per year) and are statistics for the occupational group; growth and annual openings are different measures, and the large volume of openings comes mainly from replacement demand.

  • National Bureau of Statistics, Average Annual Wages of Urban Employed Persons (2025)National Bureau of Statistics (People's Republic of China)|Chinese mainland|2025; released 2026|Primary document
    View original source:National Bureau of Statistics, Average Annual Wages of Urban Employed Persons (2025)
    • Supports the fact that Chinese mainland publishes average annual wages of urban employed persons by industry sector and unit type but does not establish a correspondence at the occupational level with this entry; this evidence route records the precise occupational wage as no data that can be used safely and requires showing the gap rather than using a proxy figure, so this page does not transcribe its values and only registers the source and the mapping boundary.
    • 2025; released 2026

    Limitations:This release publishes average annual wages of urban employed persons by industry sector and unit type and does not give a national occupational wage distribution corresponding precisely to Cement Masons and Concrete Finishers (47-2051.00); this evidence route records the precise occupational wage as no data that can be used safely, requires showing the gap rather than using a proxy figure, and this page therefore does not transcribe its values and only registers the source and the mapping boundary.

  • State Administration for Market Regulation (public information on work and industrial safety supervision)State Administration for Market Regulation|Chinese mainland|Institutional public information; accessed 2026-09-16|Primary document
    View original source:State Administration for Market Regulation (public information on work and industrial safety supervision)
    • Supports the scope of the public regulatory entry for work, industrial, equipment and chemical safety, used to explain that protection against crystalline silica, dust and chemical materials and equipment and electrical safety have dedicated regulatory and institutional requirements; it does not replace item-by-item verification, nor does it constitute a compliance determination for any specific institution or individual.
    • Institutional public information; accessed 2026-09-16

    Limitations:This information is only used to explain the scope of the regulatory entry for work, industrial, equipment and chemical safety; it does not replace item-by-item verification, nor does it constitute a compliance determination for any specific institution or individual.

  • shared_official_identity_entryMinistry of Human Resources and Social Security of the People's Republic of China|Chinese mainland|2022 edition; accessed 2026-09-16|Primary document
    View original source:shared_official_identity_entry
    • Supports the shared entry and identity discovery method for Chinese mainland occupational classification, used to explain that this route records the mapping of this occupation in Chinese mainland as broader (broader occupational framing), which must be judged by the position's actual duties and qualifications and institutional authorization.
    • 2022 edition; accessed 2026-09-16

    Limitations:The shared occupational classification entry is for discovery only; its occupational sub-categories have no one-to-one correspondence with cement masons and concrete finishers (this route records the mapping as broader, that is, a broader occupational framing), and judgment must be based on the position's actual duties and qualifications, and it does not establish an occupational wage statistical framing.

  • market_signalInternational Labour Organization|Global|Published 2025-05-20; accessed 2026-09-16|Primary document
    View original source:market_signal
    • Supports the task-level framing for measuring generative AI exposure, and the conclusion boundary that process planning and record processing are more easily assisted, while measuring forms and elevation, pouring, finishing and safety stop-work judgments still depend on the actual work context and human control.
    • Published 2025-05-20; accessed 2026-09-16

    Limitations:The task exposure index does not provide job-count projections for a single occupation, and is not an adoption rate or unemployment rate.

  • FermatMind editorial design and fictional exercisesFermatMind career content editorial team|United States|Compiled 2026-09|editorial_synthesis
    View original source:FermatMind editorial design and fictional exercises
    • Records how the editorial design and fictional exercises on this page were compiled, the principles for noting framings, and how gaps are registered.
    • Compiled 2026-09

    Limitations:An editorial compilation record used to explain the framing and gaps; not a source of fact.

  • O*NET-SOC 47-2051.00 Work Context (Work Context field)O*NET OnLine|United States|Page updated 2026; accessed 2026-09-16|Primary document
    View original source:O*NET-SOC 47-2051.00 Work Context (Work Context field)
    • Supports the percentage distribution of the work context (such as 96% continuously handling and controlling objects and tools by hand, 82% standing continuously or almost continuously, 84% working outdoors exposed to all weather conditions every day, 55% being exposed to contaminants every day, 70% considering precision or accuracy extremely important), used to explain working conditions.
    • Page updated 2026; accessed 2026-09-16

    Limitations:The work context describes the distribution of working conditions across the occupational group and does not represent the specific arrangements of any single position.

  • O*NET national wage percentile page (47-2051.00, annual and hourly percentiles)O*NET / U.S. Bureau of Labor Statistics|United States|May 2025 OEWS; accessed 2026-09-16|Primary document
    View original source:O*NET national wage percentile page (47-2051.00, annual and hourly percentiles)
    • Supports the way of looking up official annual and hourly percentiles under the framing shown on this occupation page, and explains that percentile figures are not a starting-pay promise.
    • May 2025 OEWS; accessed 2026-09-16

    Limitations:This page is the official wage lookup entry; this page does not use it to infer an individual's take-home income, nor as a job offer.

  • O*NET-SOC 47-2051.00 related occupation comparison (adjacent occupation list)O*NET OnLine|United States|Page updated 2026; accessed 2026-09-16|Primary document
    View original source:O*NET-SOC 47-2051.00 related occupation comparison (adjacent occupation list)
    • Supports the official related occupation list and identity boundaries, used to explain the basis for comparing this occupation with adjacent directions (brickmasons and blockmasons, stonemasons, plasterers and stucco masons, terrazzo workers and finishers, reinforcing iron and rebar workers and construction labourers, and others), and to explain that adjacent directions each have their own independent qualification and authorization requirements.
    • Page updated 2026; accessed 2026-09-16

    Limitations:The related occupation list is used to explain identity boundaries and adjacent directions (including brickmasons and blockmasons, stonemasons and reinforcing iron and rebar workers and construction labourers), and does not mean that position titles or work qualifications and inspection and stop-work authority can be exchanged.

  • O*NET-SOC 47-2051.00 custom occupation profile (selectable field range)O*NET OnLine|United States|Page updated 2026; accessed 2026-09-16|Primary document
    View original source:O*NET-SOC 47-2051.00 custom occupation profile (selectable field range)
    • Supports the range of fields selectable in the official custom occupation profile, used to explain that profile fields do not constitute a competence threshold or equipment operation qualifications and inspection and stop-work authority.
    • Page updated 2026; accessed 2026-09-16

    Limitations:The custom profile is used to explain the range of officially selectable fields; it does not set a personal competence threshold, nor does it constitute equipment operation qualifications or inspection and stop-work authority or institutional job authorization.

  • O*NET national wages (BLS2025)O*NET OnLine|United States|2025|Primary document
    View original source:O*NET national wages (BLS2025)
    • Annual wages 39190/47010/57020/66870/85480; hourly wages 18.84/22.60/27.41/32.15/41.10; percentiles are not starting pay.

    Limitations:Annual wages 39190/47010/57020/66870/85480; hourly wages 18.84/22.60/27.41/32.15/41.10; percentiles are not starting pay.

  • Precise BLS SOC47-2051BLS|United States|2025—2035|Primary document
    View original source:Precise BLS SOC47-2051
    • Precise BLS SOC47-2051: employment was 204,800 in 2025 and is projected to be 208,100 in 2035, a net increase of 3,300, or 1.6% growth, with about 13,600 openings per year on average over 2025—2035, and the self-employed share was 1.5% in 2025. OOH rounds the growth to 2%; openings include growth and replacement demand such as transfers out and exits, and are not 13600 new additions each year or a dedicated AI projection. BLS SOC47-2051 gives a typical entry of no formal educational credential, no related work experience and moderate-term on-the-job training; O*NET Job Zone1—2 is a level-level general preparation description, and 52%/35%/13% are respondents' judgments about the education new hires need, not the educational attainment of incumbents. The certification directory lists 23 items, and the apprenticeship field on the detail page lists 3 approved position titles (including aliases and existing names), which does not mean 3 separate open programmes or that all positions must hold every certification. The specific certification enrollment, fees and maintenance conditions must be checked with the body in each case.

    Limitations:Precise BLS SOC47-2051: employment was 204,800 in 2025 and is projected to be 208,100 in 2035, a net increase of 3,300, or 1.6% growth, with about 13,600 openings per year on average over 2025—2035, and the self-employed share was 1.5% in 2025. OOH rounds the growth to 2%; openings include growth and replacement demand such as transfers out and exits, and are not 13600 new additions each year or a dedicated AI projection. BLS SOC47-2051 gives a typical entry of no formal educational credential, no related work experience and moderate-term on-the-job training; O*NET Job Zone1—2 is a level-level general preparation description, and 52%/35%/13% are respondents' judgments about the education new hires need, not the educational attainment of incumbents. The certification directory lists 23 items, and the apprenticeship field on the detail page lists 3 approved position titles (including aliases and existing names), which does not mean 3 separate open programmes or that all positions must hold every certification. The specific certification enrollment, fees and maintenance conditions must be checked with the body in each case.

  • broader_occupation_proxyBLS|United States|2025 wages; 2025—2035 projection|Primary document
    View original source:broader_occupation_proxy
    • The combined group includes brick masonry, stonemasonry, concrete finishing and terrazzo; group industry annual medians of 61110/61030/58870/55690/55560 are not precise for this occupation.

    Limitations:The combined group includes brick masonry, stonemasonry, concrete finishing and terrazzo; group industry annual medians of 61110/61030/58870/55690/55560 are not precise for this occupation.

  • O*NET occupation detailsO*NET OnLine|United States|2026|Primary document
    View original source:O*NET occupation details
    • 26 tasks of which 19 core and 7 supplemental, 4 software categories, RC100/38; 52/35/13 education requirement judgments; 3 apprenticeship titles including aliases.

    Limitations:26 tasks of which 19 core and 7 supplemental, 4 software categories, RC100/38; 52/35/13 education requirement judgments; 3 apprenticeship titles including aliases.

  • O*NET Hot recruitment tableO*NET OnLine|United States|Lightcast2025|Primary document
    View original source:O*NET Hot recruitment table
    • 0 recruitment software items cannot negate the 4 categories on the detail page or imply that no software is used.

    Limitations:0 recruitment software items cannot negate the 4 categories on the detail page or imply that no software is used.

  • O*NET industry distributionO*NET OnLine|United States|2025|Primary document
    View original source:O*NET industry distribution
    • Construction 93% and other 7%; not used to infer industry wages.

    Limitations:Construction 93% and other 7%; not used to infer industry wages.

  • O*NET certification directoryO*NET OnLine|United States|2026-10-09|Primary document
    View original source:O*NET certification directory
    • 23 certifications, whose specific conditions were not checked item by item; apprenticeship titles should be checked on the detail page, not this directory.

    Limitations:23 certifications, whose specific conditions were not checked item by item; apprenticeship titles should be checked on the detail page, not this directory.

  • National Bureau of Statistics construction unit wagesNational Bureau of Statistics|Chinese mainland|2025|Primary document
    View original source:National Bureau of Statistics construction unit wages
    • National Bureau of Statistics 2025 average annual wages for construction: 92,036 CNY for non-private units and 66,275 CNY for private units (pre-tax); this is all-position urban unit industry background, not the national wage, starting pay or upper and lower limits for concrete workers or for this U.S. occupation, and is not converted into an occupational monthly wage.

    Limitations:National Bureau of Statistics 2025 average annual wages for construction: 92,036 CNY for non-private units and 66,275 CNY for private units (pre-tax); this is all-position urban unit industry background, not the national wage, starting pay or upper and lower limits for concrete workers or for this U.S. occupation, and is not converted into an occupational monthly wage.

  • broader_occupation_proxyOfficial public text from China|Chinese mainland|2022 edition, physical page 535|Primary document
    View original source:broader_occupation_proxy
    • The 2022 edition of China's occupational classification code explicitly lists concrete workers as 6-29-01-03 (PDF physical page 535), with tasks covering batching and mixing, pumping and pouring, forming and formwork, curing and repair and equipment maintenance. This overlaps with U.S. 47-2051, but the Chinese scope includes production and conveying, and no complete task-by-task statistical mapping has been established, so the name cannot be used to infer equivalent wages or qualifications.

    Limitations:The 2022 edition of China's occupational classification code explicitly lists concrete workers as 6-29-01-03 (PDF physical page 535), with tasks covering batching and mixing, pumping and pouring, forming and formwork, curing and repair and equipment maintenance. This overlaps with U.S. 47-2051, but the Chinese scope includes production and conveying, and no complete task-by-task statistical mapping has been established, so the name cannot be used to infer equivalent wages or qualifications.

  • Specific Articles of the Work Safety LawOfficial public text from China|Chinese mainland|2021 third amendment|Primary document
    View original source:Specific Articles of the Work Safety Law
    • Articles 28/30/55/57—59 of China's Work Safety Law: safety training and special operation qualifications are separate, procedures must be followed and hazards reported; where an emergency directly endangering personal safety is found, the worker has the right to stop their own work or, in accordance with the law, to take emergency measures and then evacuate, without first obtaining institutional stop-work authorization. Overall project stop/resume work and project acceptance are handled separately under the applicable rules and responsibilities. Articles 24/25/27/32/36—37 of the Regulations on the Administration of Construction Project Work Safety set out general and subcontractor responsibility, list special operations, technical briefing, protection and emergency evacuation, and training, and do not describe all cutting and vibrating operations as special operations.

    Limitations:Articles 28/30/55/57—59 of China's Work Safety Law: safety training and special operation qualifications are separate, procedures must be followed and hazards reported; where an emergency directly endangering personal safety is found, the worker has the right to stop their own work or, in accordance with the law, to take emergency measures and then evacuate, without first obtaining institutional stop-work authorization. Overall project stop/resume work and project acceptance are handled separately under the applicable rules and responsibilities. Articles 24/25/27/32/36—37 of the Regulations on the Administration of Construction Project Work Safety set out general and subcontractor responsibility, list special operations, technical briefing, protection and emergency evacuation, and training, and do not describe all cutting and vibrating operations as special operations.

  • Regulations on the Administration of Construction Project Work SafetyOfficial public text from China|Chinese mainland|Promulgated 2003, effective 2004|Primary document
    View original source:Regulations on the Administration of Construction Project Work Safety
    • 24/25/27/32/36—37 on general and subcontractor responsibility, special operations, briefing, protection and emergency evacuation, and training; not a uniform certification list for all equipment.

    Limitations:24/25/27/32/36—37 on general and subcontractor responsibility, special operations, briefing, protection and emergency evacuation, and training; not a uniform certification list for all equipment.

  • OSHA construction silica dust 1926.1153OSHA|United States|Current clauses verified against sources 2026-10-09|Primary document
    View original source:OSHA construction silica dust 1926.1153
    • For U.S. construction silica dust, check OSHA1926.1153: employers implement engineering/work-practice/respiratory controls according to Table1 for the specific equipment, indoors or outdoors and shift length, or handle it through the paragraph (d) exposure assessment route; wet methods and dust collection are not freely interchangeable, and respiratory protection and medical surveillance have applicable conditions. The O*NET 55% exposure to contaminants is not a silica dust measurement, an accident rate or evidence of compliance.

    Limitations:For U.S. construction silica dust, check OSHA1926.1153: employers implement engineering/work-practice/respiratory controls according to Table1 for the specific equipment, indoors or outdoors and shift length, or handle it through the paragraph (d) exposure assessment route; wet methods and dust collection are not freely interchangeable, and respiratory protection and medical surveillance have applicable conditions. The O*NET 55% exposure to contaminants is not a silica dust measurement, an accident rate or evidence of compliance.

  • OSHA concrete equipment 1926.702OSHA|United States|Current clauses verified against sources 2026-10-09|Primary document
    View original source:OSHA concrete equipment 1926.702
    • For U.S. concrete construction equipment, check 1926.702: hand-guided powered trowels must have a control that cuts off power automatically when the operator releases the handle; for maintenance and servicing that could start unexpectedly and injure someone, all potentially hazardous energy must be locked out and tagged out. Other equipment and cleaning tasks are confirmed under the applicable rules, the manual and the hazardous energy plan, and the industrial 1910 clauses are not applied unconditionally to construction.

    Limitations:For U.S. concrete construction equipment, check 1926.702: hand-guided powered trowels must have a control that cuts off power automatically when the operator releases the handle; for maintenance and servicing that could start unexpectedly and injure someone, all potentially hazardous energy must be locked out and tagged out. Other equipment and cleaning tasks are confirmed under the applicable rules, the manual and the hazardous energy plan, and the industrial 1910 clauses are not applied unconditionally to construction.

  • OSHA wet cement skin guidance 3351OSHA|United States|2008 guidance|Primary document
    View original source:OSHA wet cement skin guidance 3351
    • Wet cement burns and dermatitis; waterproof gloves, boots and knee pads and washing are appropriate, and barrier cream does not replace them; the guidance is not a legal specification for all tasks.

    Limitations:Wet cement burns and dermatitis; waterproof gloves, boots and knee pads and washing are appropriate, and barrier cream does not replace them; the guidance is not a legal specification for all tasks.

  • OSHA construction fall protection 1926.501OSHA|United States|Current clauses verified 2026-10-09|Primary document
    View original source:OSHA construction fall protection 1926.501
    • Verify systems and heights by the work category; under (b)(1) unprotected edges 6 feet and above require guardrails, safety nets or personal fall arrest; other tasks are checked separately, and a safety harness alone is not specified uniformly.

    Limitations:Verify systems and heights by the work category; under (b)(1) unprotected edges 6 feet and above require guardrails, safety nets or personal fall arrest; other tasks are checked separately, and a safety harness alone is not specified uniformly.

  • NRMCA CIP14 construction finishing guidanceNRMCA|United States|2017 edition|Primary document
    View original source:NRMCA CIP14 construction finishing guidance
    • NRMCA CIP14 distinguishes preliminary levelling from later floating/trowelling: the later finishing waits until bleeding has stopped and there is no water sheen on the surface, and the timing is judged from the concrete and the environment; do not compress pouring through curing into one uniform window before initial set and do not speed up finishing by adding water or dry cement. Joints and curing follow the design and the actual process, and technical guidance does not replace statutory specifications or project plans.

    Limitations:NRMCA CIP14 distinguishes preliminary levelling from later floating/trowelling: the later finishing waits until bleeding has stopped and there is no water sheen on the surface, and the timing is judged from the concrete and the environment; do not compress pouring through curing into one uniform window before initial set and do not speed up finishing by adding water or dry cement. Joints and curing follow the design and the actual process, and technical guidance does not replace statutory specifications or project plans.

  • Three representative core tasks of this occupationFermatMind / 费马测试|2026-10-18|Editorial model estimation method
    View original source:Three representative core tasks of this occupation
    • Model impact index for three equally weighted representative core tasks; not a measured share of working time or a job-loss probability. floor((25+0+0)/3+0.5)=8; fermatmind-ai-impact-v1; 2026-10-18.
    • Anchors: 0 negligible; 25 preparation or record assistance; 50 substantial assistance; 75 most information output can be formed by AI with review; 100 almost all of the selected task can be done by AI and independently verified.
    • Forms and elevation|checking form construction and setting and aligning forms to the required slope and depth|form check, alignment and elevation records. — 25/100; weight=1/3; cement-masons-and-concrete-finishers.profile.responsibilities-block.1[0]
    • Pouring and consolidation|signalling tanker drivers and moving the chute, directing the pour and supervising spreading and consolidation|pour, spread and consolidation records. — 0/100; weight=1/3; cement-masons-and-concrete-finishers.profile.responsibilities-block.1[1]
    • Levelling and finishing|levelling and finishing with trowels, screeds and power trowels and producing the specified finish to the design|levelling, finishing and finish records. — 0/100; weight=1/3; cement-masons-and-concrete-finishers.profile.responsibilities-block.1[3]

    Limitations:Editorial ratings use the existing occupational responsibilities and AI task analysis on this page. They are not adoption rates, measured effects, job-disappearance or personal-unemployment probabilities, or official scores from Stanford or another external institution. No measured time weights or future robot deployment are assumed.

  • O*NET® 31.0 Core Task StatementsU.S. Department of Labor, Employment and Training Administration|United States|O*NET 31.0|Primary document
    View original source:O*NET® 31.0 Core Task Statements

    Limitations:Verbatim Core Task Statements excerpted from the O*NET® 31.0 Database, used under CC BY 4.0. U.S. occupational scope.

  • O*NET® database license · CC BY 4.0U.S. Department of Labor, Employment and Training Administration|United States|O*NET 31.0|Primary document
    View original source:O*NET® database license · CC BY 4.0

    Limitations:Verbatim Core Task Statements excerpted from the O*NET® 31.0 Database, used under CC BY 4.0. U.S. occupational scope.

Precise U.S. SOC47-2051 wages and projections are used, and combined masonry workers group wages are not substituted for precise occupational industry wages; Chinese code 6-29-01-03 exists but its scope is broader, and the construction industry average is not occupational income. The statutory right to emergency stop of your own work does not depend on first obtaining institutional authorization; formal acceptance and project resumption are checked separately. Hot0 items are distinguished from the 4 software categories on the detail page.

Cement Masons and Concrete Finishers | FermatMind