Preparing content…

Manufactured Building and Mobile Home Installers

SOC 49-9095 · O*NET 49-9095.00

Manufactured Building and Mobile Home InstallersWages and projections use separate tablesChina occupational wage distribution unavailable
N/AAI tools and human review

Manufactured building and mobile home installers position and set prefabricated units according to site plans. They check parts, supports and interfaces and coordinate handoffs for work handled by other trades.

USD 45,990/yearU.S. median annual wage (May 2025)O*NET OnLine using U.S. Bureau of Labor Statistics data
5.8%U.S. projected employment change (2025–2035)U.S. Bureau of Labor Statistics
About 3,500 jobsU.S. employment (2025)U.S. Bureau of Labor Statistics
About 300 per yearU.S. annual openings (2025–2035)U.S. Bureau of Labor Statistics
No data availableMainland China wage reference

Quick assessment

Who might suit manufactured building and mobile home installation?

The core work of manufactured building and mobile home installers is to move mobile homes or manufactured buildings to owners' sites or parks and install them: check components and requirements against work orders, estimate materials and plan operations, level and secure foundations and units, seal module openings, connect and test water, electrical, gas, and other lines, install and replace doors, windows, hardware, appliances, and interior components, inspect and test operating conditions, address leaks and structural frame damage, and complete cleanup and handover.

The following judgments concern the on-site installation practices of manufactured building and mobile home installers. They do not predict hiring, licensing, qualification, or income outcomes.

Who is more likely to fit Manufactured Building and Mobile Home Installers?

Reference deliverable: A lacks the manual, foundation acceptance, and authorization; ask the responsible person for evidence first and do not begin placement. For B, you can confirm only that 1 of the 4 support labels is illegible; isolate it pending verification. Do not judge suitability or sufficiency from counts; membrane quantities await confirmation from the manual. For C, refer water, electrical, and gas matters separately to appropriately authorized personnel, leaving test values, results, and signatures blank. The procedure draft should say: after documentation and foundation confirmation → authorized team places, secures, and rechecks the unit → seal according to the manual → authorized personnel connect and test → hand over once evidence is complete. Do not claim installation is complete or tests passed. Reflect on whether you can accurately record unknowns and stop at scope boundaries, rather than using paper performance to prove physical capacity or competence.

When should you be cautious about choosing Manufactured Building and Mobile Home Installers?

This is an entirely fictional installation work-order scenario check, not a personality diagnosis, hiring conclusion, or qualification assessment.

How can a small experiment test your fit for Manufactured Building and Mobile Home Installers?

Find “Sheet P: Module delivery and interface handoff” under “Entering the field, qualifications, and career development.”

Career profile

Manufactured building and mobile home installers position and set prefabricated units according to site plans. They check parts, supports and interfaces and coordinate handoffs for work handled by other trades.

Quick career answers

What should I check first about this work?

Check first: installation work orders and site conditions, component and tool lists, foundation and securing plans, water, electrical, gas, and other interface requirements, boundaries of work requiring licensed personnel, and safety and weather conditions.

Subjects:

  1. 01Units and sites, interfaces and components

Inputs:

  1. 01Installation work orders, drawings, and safety conditions
DeliverablesReviewable installation and test records

How can I assess the complete workflow?

End-to-end work: check the work order and site, plan operations, secure foundations and units, seal openings, connect and test lines, install hardware and appliances, inspect and test, and complete cleanup and handover. Do not proceed until securing or line conditions are confirmed, or begin work at height or with hazardous equipment before protective measures are in place.

DimensionPrimary trackComparison track
Complete workflowFrom checking work orders to cleanup and handover
Step oneCheck work orders and site conditions
Step twoEstimate materials and plan operations
Step threeLevel and secure foundations and units
Step fourSeal openings and connect lines
Step fiveInstall hardware and appliances and test
Step sixRepair defects and complete cleanup and handover

Core responsibilities

  1. 01

    Move and set up mobile homes or prefabricated buildings on owners' lots or at mobile home parks.

  2. 02

    Seal open sides of modular units to prepare them for shipment, using polyethylene sheets, nails, and hammers.

  3. 03

    Repair leaks in plumbing or gas lines, using caulking compounds and plastic or copper pipe.

  4. 04

    Connect water hoses to inlet pipes of plumbing systems, and test operation of plumbing fixtures.

What are the qualification boundaries?

In the United States, this occupation is in Job Zone 1-2, with education requirements mostly at high-school level or below and on-the-job training. Check licensing requirements by state for water, electrical, gas, and other line work. Training or certification does not equal practice or special-operation authorization. This page does not judge individual eligibility.

  1. Boundaries

    Verify against jurisdiction, employer, and safety standards

  2. Jurisdiction

    Follow the rules of the country or region

  3. Organization

    Confirm employer and regulatory requirements

  4. Training

    Confirm safety and special-operation training

  5. Responsibility

    Confirmed by licensed personnel and the project lead

  6. Evidence

    Retain reviewable records

Work reality

Key judgments: first identify the applicable home type and installation regime, then check manufacturer instructions, soil / foundation and anchoring plans, permits, and worker authorization. Pause and hand over when site conditions do not match; do not alter structural designs independently. Qualified personnel must confirm line connections and tests under the actual applicable standards.

O*NET structured fields

Research inputs
Research inputs
O*NET 49-9095.00 describes this occupation’s tasks and work context. U.S. wages come from OEWS and projections from BLS Table 1.2.

Work subjects and AI boundaries for manufactured building and mobile home installers Editorial task hypothesis: tools may assist with fictional work orders, component lists, and draft records. Ordinary email, browsers, or spreadsheets are not equivalent to generative AI. Estimates and installation instructions require checking original document versions and site conditions. No occupational adoption rates or job outcomes were obtained; AI output cannot replace anchoring design, line tests, or installation acceptance.

Career direction comparison

Comparison with adjacent occupations

The following compares manufactured building and mobile home installers with adjacent roles by actual work subjects, core deliverables, and licensing boundaries. Qualifications are not interchangeable based on titles.

Comparison with adjacent occupations
Career directionCore work and outputKey differencesBest-fit choice
CarpentersCarpenters make and install wooden structures and components; manufactured building and mobile home installers position and secure whole units and connect systems. Their work subjects and sites differ.Make and install wooden structures and components.Compare if you prefer work on wooden structures.
Construction LaborersConstruction laborers perform general site construction and material handling; manufactured building and mobile home installers focus on installing and commissioning mobile homes and manufactured buildings according to their process and interface requirements.Perform general site construction and material handling.Compare if you prefer general site construction.
Drywall and Ceiling Tile InstallersDrywall and ceiling tile installers work on interior wall and ceiling panels; manufactured building and mobile home installers handle whole-unit sealing and structural frames and do not replace specialized interior work.Install interior wall and ceiling panels.Compare if you prefer interior panel installation.
ElectriciansElectricians handle electrical wiring and compliant connections; manufactured building and mobile home installers connect and test interfaces only within their scope. Energized work and compliant wiring must be performed by licensed electricians.Handle electrical wiring and compliant connections.Compare if you prefer electrical work and obtain licensing.

How to choose

First use reviewable installation records to validate safe work, securing, and interface-testing boundaries, then assess your direction. Do not assign a single ranking based on income or personality.

Next, turn the comparison into a small installation exercise that can be stopped.

AI impact on this career

Boundaries of AI's impact on manufactured building and mobile home installers

Editorial task hypothesis: tools may assist with fictional work orders, component lists, and draft records. Ordinary email, browsers, or spreadsheets are not equivalent to generative AI. Estimates and installation instructions require checking original document versions and site conditions. No occupational adoption rates or job outcomes were obtained; AI output cannot replace anchoring design, line tests, or installation acceptance.

Technical capabilities

Describe only specific steps tools may assist; do not treat demonstrations as organizational adoption.

Adoption conditions

Check data sources, system reliability, and review responsibilities; this page has no occupation-specific adoption rate.

Job outcomes

Without occupational job-outcome research, do not infer layoff timing, staffing changes, or hiring probability.

Task impact matrix

Comparison of AI impact across career tasks
Work areaTaskCurrent changeHuman control point
Work orders and planningCheck work orders, estimate materials, and plan operationsEditorial hypothesis: list or record drafts may receive assistance and must be reviewed against original work orders, instructions, and drawings. Do not infer AI adoption from software skills lists.Check site and component information.
Positioning and sealingSecure units and seal module openingsCannot replace on-site workUse actual on-site structural, securing, interface, and safety conditions as the basis, retaining human judgment and records.
Connection and testingConnect lines and test systemsNo automated decisionsConfirmed by licensed personnel and installers.
Inspection and deliveryInspect operation and complete cleanup and handoverMay assist with organizing recordsConfirmed by installers and the owner.

What judgments does this evidence support?

Occupational sources describe actual tasks and subjects: units and foundations, sealing and hardware, water, electrical, and gas interfaces, work orders, and component lists. Tool capabilities, organizational adoption, and job outcomes are recorded separately; wage or employment data is not used as AI evidence.

O*NET 49-9095.00 Manufactured Building and Mobile Home Installers (Summary)

View source ↗
Subject
Identity and scope of 49-9095.00
Finding
Supports identity and task boundaries
Limitation
US scope for this occupation; excludes Chinese data.

O*NET 49-9095.00 Tasks

View source ↗
Subject
Tasks for 49-9095.00
Finding
Supports task breakdown, not AI adoption rates
Limitation
Does not replace local law or safety standards.

O*NET 49-9095.00 Work Context

View source ↗
Subject
Work context for 49-9095.00
Finding
Supports assessment of environment and pace
Limitation
Does not replace safety and compliance requirements.

Why does impact differ by work direction?

Editorial comparison: information retrieval and records may receive assistance, but adoption depends on document permissions, versions, and review. Text output cannot replace on-site securing, system connections, or acceptance.

Work orders and planning

AI primarily changesMay assist with draft lists; materials and plans must be reviewed against original drawings.

Human responsibility remainsSite and component checks

Inspection and delivery

AI primarily changesMay assist with organizing records but cannot fabricate test results.

Human responsibility remainsOperational confirmation and responsibility

Accountability must remain intact when AI enters professional workflows

Human control points: check work orders and site conditions, judge whether structures and securing meet standards, confirm interfaces and test results, distinguish licensed-work boundaries, implement protection before work at height or with hazardous equipment, and take responsibility for installation quality and safety.

  1. Check inputs

    Confirm work-order, site, and component information.

  2. Limit the task

    Work only within licensing and safety boundaries.

  3. Human review

    Review securing, interfaces, and test results.

  4. Record and escalate

    Promptly pause and report hazards and matters beyond scope.

Professional risks of using AI

Structural and securing failures

May affect safety and use.

Control: Secure according to procedures and recheck foundations.

Water, electrical, and gas interfaces and safety

May cause leaks or injury.

Control: Connect and test within licensing boundaries.

Work at height and hazardous equipment

May cause personal injury.

Control: Implement protection and stop unsafe work.

How should different audiences respond?

New entrants

First perform the original A/B/C paper check; actual securing, interface connections, and testing require training, supervision, and necessary permits.

Current practitioners

Retain installation and test records.

Managers

Establish safety and licensed-work procedures first.

Common questions about AI and career development

Will AI replace manufactured building and mobile home installers?

Task exposure, adoption, and job outcomes measure different things and cannot establish a date for job cuts.

Source: O*NET 49-9095.00 TasksOriginal source ↗

Which stage will automation affect first?

Only task hypotheses are listed; no occupational adoption or sequencing research was obtained. Authorized personnel must handle on-site positioning and securing, interface testing, and acceptance.

Source: O*NET 49-9095.00 TasksOriginal source ↗

Does this page have adoption-rate data?

There is no occupational adoption-rate source, so this page provides no such figures.

Source: O*NET 49-9095.00 Manufactured Building and Mobile Home Installers (Summary)Original source ↗

First conduct an offline exercise with entirely fictional work orders and component lists. Write installation steps, securing and sealing plans, testing points, and escalation boundaries without relying on unverified automated estimates to replace on-site judgment. Use the A/B/C texts above only for paper checks and handover drafts; do not perform actual installation, interface connections, or testing.

Chinese mainland salary reference

Mainland China: wage evidence and industry context

Scope: National Bureau of Statistics 2025 average annual wages for construction units are 92,036 yuan / year for non-private units and 66,275 yuan / year for private units; the nationwide non-private figure is 129,441 yuan / year. Use these as context only when the actual employer belongs to that industry. They do not show that all installers mainly fall in this category, or represent an occupational median or individual business income.

Official statistical scope

Category boundary: the Ministry of Human Resources and Social Security publishes enterprise compensation survey information by occupation / position, which can be used to look up construction installation pay. This page did not obtain an entry matching O*NET 49-9095.00 exactly, so it is not used as a nationwide occupational median. Refer to competent authority publications for specifics.

Nationwide · Construction (non-private)

Only average annual wages are published

Nationwide · Construction (private)

Only average annual wages are published

Exact occupational wages

Insufficient evidence: exact scope not obtained

Scenario-based reference

Exact Chinese occupational wages were not obtained. Construction averages provide only employer context for corresponding units, do not establish this occupation's main industry classification, and exclude individually owned businesses and freelancers.

This scenario illustrates statistical scope only; it is not an individual price quote.
Role scopeReference valueExplanation
Not separately tabulatedHiring depends on the employer and positionNational Bureau of Statistics wage statistics are organized by industry and registration type, not by education levels within this occupation.
Not separately tabulatedHiring depends on the employer and positionNational Bureau of Statistics wage statistics are organized by industry and registration type, not by education levels within this occupation.
Not separately tabulatedHiring depends on the employer and positionNational Bureau of Statistics wage statistics are organized by industry and registration type, not by education levels within this occupation.
Not separately tabulatedHiring depends on the employer and positionNational Bureau of Statistics wage statistics are organized by industry and registration type, not by education levels within this occupation.

Influencing factors

Construction (non-private)

92,036 yuan / year

Construction (private)

66,275 yuan / year

Nationwide total for urban non-private units

129,441 yuan / year

Boundaries for AI and wage judgments

Insufficient evidence: no nationwide occupational median wage, reference period, or statistical scope was obtained for manufactured building and mobile home installers in mainland China. This page displays only an industry proxy labeled as such; neither proxy figures nor US figures fill the gap.

U.S. salary reference

O*NET displays the May 2025 BLS OEWS national wages for U.S. occupation 49-9095.

The May 2025 U.S. national median was USD 45,990 a year and USD 22.11 an hour. The annual 10th, 25th, 50th, 75th and 90th percentiles were USD 27,120, 35,800, 45,990, 51,970, 60,810.

Wage statistical reference: the figures above are US nationwide data for occupation 49-9095.00. The median is not starting pay or individual take-home income, and percentiles are not entry or seniority levels.

Wage statistical reference: the figures above are US nationwide data for occupation 49-9095.00. The median is not starting pay or individual take-home income, and percentiles are not entry or seniority levels.
PercentileAnnual referenceHourly equivalentExplanation
P10$27,120 / year$13.04 / hour2025 US nationwide occupational percentiles, with the two tables listed separately; not seniority or a conversion of individual working hours.
P25$35,800 / year$17.21 / hour2025 US nationwide occupational percentiles, with the two tables listed separately; not seniority or a conversion of individual working hours.
P50 (median)$45,990 / year$22.11 / hour2025 US nationwide occupational percentiles, with the two tables listed separately; not seniority or a conversion of individual working hours.
P75$51,970 / year$24.99 / hour2025 US nationwide occupational percentiles, with the two tables listed separately; not seniority or a conversion of individual working hours.
P90$60,810 / year$29.24 / hour2025 US nationwide occupational percentiles, with the two tables listed separately; not seniority or a conversion of individual working hours.

Wages · Median:$45,990 / year (2025);O*NET 49-9095.00 National Wages (BLS OEWS Display)

Wages · Hourly median:$22.11 / hour (2025);O*NET 49-9095.00 National Wages (BLS OEWS Display)

Wages · 10th percentile:$27,120 / year (2025);O*NET 49-9095.00 National Wages (BLS OEWS Display)

Wages · 90th percentile:$60,810 / year (2025);O*NET 49-9095.00 National Wages (BLS OEWS Display)

Wages · Statistical scope:Manufactured Building and Mobile Home Installers(49-9095.00);O*NET 49-9095.00 National Wages (BLS OEWS Display)

How to interpret these positions: the O*NET national page publishes wage percentiles; the median is not a beginner or senior level. Employment size and above-average growth are occupational statistics and must be interpreted separately from individual opportunities.

Wages

Dollars / year; the BLS 2025 OEWS nationwide median for occupation 49-9095.00. Wage percentiles are also published; individual take-home income is not included.

Employment

Employment count in 2024, not the number of vacancies being recruited for.

Outlook

BLS Table 1.2 (49-9095) shows about 3,500 U.S. jobs in 2025 and projects 3,700 in 2035 (5.8%), with about 300 openings per year including replacements. Counts are rounded independently.

Industry

Listed as Retail Trade and Manufacturing under O*NET / BLS industry scope; does not equal income for all practitioners.

Industry distribution is not wages: current ONet2025 shares of 40% in retail and 18% in manufacturing describe employer settings only. Industry income cannot be inferred from the nationwide occupational median. Occupational wages by industry were not obtained; the precise gap is retained.

Industry distribution is not wages: current ONet2025 shares of 40% in retail and 18% in manufacturing describe employer settings only. Industry income cannot be inferred from the nationwide occupational median. Occupational wages by industry were not obtained; the precise gap is retained.
IndustryIndustry wage evidence for the same occupationHow to interpret
Retail TradeInsufficient evidence: not obtainedThe 40% share in 2025 is employer distribution, not wages.
ManufacturingInsufficient evidence: not obtainedThe 18% share in 2025 is employer distribution, not wages.
Other detailed industriesInsufficient evidence: not obtainedDo not fill industry breakdowns with nationwide wages.
Region × industryInsufficient evidence: not obtainedDo not fill exact wages with employment figures or proxy averages.

BLS Table 1.2 (49-9095) shows about 3,500 U.S. jobs in 2025 and projects 3,700 in 2035 (5.8%), with about 300 openings per year including replacements. Counts are rounded independently.

Qualifications

Education surveys mostly report high school or below; Job Zone training is a group description. US manufactured home installation separately requires checking state / HUD installation licensing and line-work qualifications.

Experience

Check on-site installation, safety, work-order and testing records, and target employer requirements. No comparison of the hiring weights of hands-on ability and certificates was obtained.

Location

Strongly affected by local housing, retail, and manufacturing distribution; do not extrapolate across regions.

Employment outlook and job openings

Fit signals

Fit signals: start with observable work behavior

To assess fit, first consider whether you can stand, bend, kneel, and crouch for long periods outdoors at sites exposed to weather; use tools under safety procedures and protect against work-at-height and hazardous equipment risks; read work orders, drawings, and component lists and plan operations; distinguish work you may perform from work requiring licensed personnel; and accept responsibility for installation quality and safety. Tools such as RIASEC can only propose hypotheses and cannot replace real task experience.

Positive signals: Positive signals: can read work orders, measure, and document work, follow safety and authorization boundaries, and willingly pause when weather, foundation, or interface conditions are unmet. The A/B/C paper exercise checks information verification only; it cannot prove physical tolerance or on-site installation ability.

Reasons for caution: Reasons for caution: difficulty standing or bending for long periods or working at height, unwillingness to follow safety and protection procedures strictly, poor tolerance of outdoor weather or physical demands, or a tendency to rush before securing and interfaces are confirmed.

Trial activity: Trial activity: using entirely fictional work orders and component lists, rehearse installation steps, securing and sealing plans, testing points, and escalation boundaries, and ask someone else to review them against the records. Use the A/B/C texts above only for paper checks and handover drafts; do not perform actual installation, interface connections, or testing.

Do not let one test decide your career

RIASEC

Editorial guidance; no occupation-specific validity study provided

Check with work samples rather than replacing judgment with labels.

The O*NET interest code is RC (Realistic–Conventional), emphasizing outdoor hands-on work and organizing information according to procedures. These labels describe activity preferences only and cannot determine competence or qualifications.

  • Observable tasks
  • Process records

Do not use it this way: Hiring, qualifications, or performance cannot be inferred from this.

Start a career-interest trial

Big Five personality

Editorial guidance; no occupation-specific validity study provided

Check with work samples rather than replacing judgment with labels.

General personality measures such as the Big Five do not provide job evidence for this occupation and can only support self-reflection. Continue checking through actual on-site installation, safe work, and work-order verification experiences.

  • Observable tasks
  • Process records

Do not use it this way: Hiring, qualifications, or performance cannot be inferred from this.

Start a career-interest trial

MBTI

Editorial guidance; no occupation-specific validity study provided

Check with work samples rather than replacing judgment with labels.

Type-based tools such as MBTI and the Enneagram cannot determine competence or qualifications and can only support self-reflection.

  • Observable tasks
  • Process records

Do not use it this way: Hiring, qualifications, or performance cannot be inferred from this.

Start a career-interest trial

Enneagram

Editorial guidance; no occupation-specific validity study provided

Check with work samples rather than replacing judgment with labels.

Continue checking against real tasks, boundaries, and reviewable deliverables.

  • Observable tasks
  • Process records

Do not use it this way: Hiring, qualifications, or performance cannot be inferred from this.

Start a career-interest trial

Cognitive abilities

Editorial guidance; no occupation-specific validity study provided

Check with work samples rather than replacing judgment with labels.

Continue checking against real tasks, boundaries, and reviewable deliverables.

  • Observable tasks
  • Process records

Do not use it this way: Hiring, qualifications, or performance cannot be inferred from this.

Start a career-interest trial

Emotional abilities

Editorial guidance; no occupation-specific validity study provided

Check with work samples rather than replacing judgment with labels.

Continue checking against real tasks, boundaries, and reviewable deliverables.

  • Observable tasks
  • Process records

Do not use it this way: Hiring, qualifications, or performance cannot be inferred from this.

Start a career-interest trial

Which installation and trade direction might suit you best?

Safe work

Fits better when: Can implement protection and recognize hazards according to procedures.

Watch for: Licensing and protection requirements must be checked.

Work orders and planning

Fits better when: Can read work orders and drawings and plan operations.

Watch for: Sites and components must be checked.

Securing and sealing

Fits better when: Can secure units and seal modules.

Watch for: Structures and foundations must be checked.

Line connections

Fits better when: Can connect and test interfaces within scope.

Watch for: Work must remain within licensing boundaries.

Inspection and repair

Fits better when: Can inspect operation and repair defects.

Watch for: Structural safety and scope must be checked.

On-site collaboration

Fits better when: Can communicate and hand over with owners and crews.

Watch for: Responsibilities and scope must be checked.

Career fit questions

Can you strictly follow safety and protection procedures?

Use this page's work sample to check safe practices.

Can you read work orders and drawings and plan operations?

Check steps and components against the work order.

Can you secure units and seal modules?

Assess measurement and hands-on skills.

What would you do with work outside your licensing scope?

Pause and hand it to licensed personnel.

Can you work outdoors and at height?

Assess physical capacity and protective skills.

What would you do if you found an interface or structural abnormality?

Pause first and escalate with records.

How can your work be reviewed?

Use installation and test records to enable review by others.

How can I try this next?

Complete an exercise using entirely fictional work orders and component lists.

Risks and boundaries

Work risks and boundaries for manufactured building and mobile home installers

Handle risks by their triggers, consequences, controls, and escalation boundaries.

ONet tasks support risk scenarios; HUD / eCFR supports the applicable housing and US installation regimes, and OSHA supports fall protection for the relevant work types. Do not extrapolate unverified Chinese or other building rules.

01

Structural and securing failure risks

Typical scenario:Foundations or securing are not completed according to procedures.

Roles most affected:On-site installation roles

Possible consequence:May affect unit safety and use.

How to reduce risk:Check applicable manufacturer installation instructions and approved foundation / anchoring plans. Pause and hand over if site conditions do not match; do not alter support or structural designs independently.

Evidence:24 CFR 3285 Installation Standards

02

Water, electrical, and gas interface and safety risks

Typical scenario:Water, electrical, gas, or other line connections or tests are inadequate.

Roles most affected:Connection and testing roles

Possible consequence:May cause leaks, power loss, or injury.

How to reduce risk:Connect and test within licensing boundaries.

Evidence:O*NET 49-9095.00 Tasks

03

Work-at-height and hazardous equipment risks

Typical scenario:Protection is missing for work at height or with hazardous equipment.

Roles most affected:On-site installation roles

Possible consequence:May cause personal injury.

How to reduce risk:Implement suitable protection and training according to work category and on-site edges, openings, and hazardous equipment. Stop first when conditions are unmet; wearing a harness alone does not permit continuation.

Evidence:OSHA Fall Protection

04

Licensing-boundary and compliance risks

Typical scenario:Applicable installation licensing is unchecked, or specialized electrical, gas, or other work exceeds authorization.

Roles most affected:Connection and testing roles

Possible consequence:May violate safety and practice rules.

How to reduce risk:First distinguish state / HUD manufactured home installation regimes and verify installer licensing. Then separately check line-work qualifications and local permits; they cannot replace one another.

Evidence:HUD Manufactured Home Installation and Housing Information

05

Weather and schedule risks

Typical scenario:Unsafe construction under weather or schedule pressure.

Roles most affected:On-site installation roles

Possible consequence:May affect quality and safety.

How to reduce risk:Adjust plans for weather and pause when conditions are unmet.

Evidence:O*NET 49-9095.00 Work Context

06

Work-order and component information mismatch

Typical scenario:On arrival, the work order, components, or site differs from expectations.

Roles most affected:On-site installation roles

Possible consequence:May cause rework or delivery delays.

How to reduce risk:First check and record discrepancies, then decide whether to continue or escalate.

Evidence:O*NET 49-9095.00 Tasks

Entry pathways

Entry pathways and capability stages

BLS lists a high school diploma or equivalent and short-term on-the-job training as typical preparation. Verify equipment, connection and acceptance responsibilities for each project.

Manufactured building installation

01

Installation assistant

Typical scope:Entry stage: practice work-order and component checks, tool use and safety protection, foundation securing and sealing, and line interface connections and testing under supervision. Learn licensed-work boundaries and retain process records.

Readiness evidence:Paper exercise “Sheet P: Module delivery and interface handoff.” Fictional handoff sheet V2 has a verified module ID and interface record for P1. P2 awaits drawing confirmation and P3’s delivery tag conflicts with the plan. The old sheet marks all three ready for review. Prepare a corrected handoff. In the variant, change only P2 to a confirmed drawing.

Credential boundary:Verify safety and special-operation requirements.

Next moves:Complete both cases and save your first draft. Then open “Paper exercise answer key (open after completing)” in “Frequently asked questions and sources.” Check whether someone can trace the original values, pending items and handoff owner.

02

Manufactured Building and Mobile Home Installers

Typical scope:Position, secure, and connect within applicable installation licensing and system-work authorization, and undergo inspections under the relevant regime.

Readiness evidence:Retain installation and test records.

Credential boundary:Separately check installation licenses, specialist work qualifications, and local requirements; employer hiring alone is insufficient.

Next moves:Moving toward greater responsibility: with experience, workers may handle complex units and whole-site installation, train newcomers, oversee safety and quality standards, or move into installation crew management, construction coordination, and inspection.

03

Senior installer / trainer

Typical scope:Handle complex units and train newcomers.

Readiness evidence:Retain records of complex units and training.

Credential boundary:Verify employer requirements.

Next moves:Add training and quality records.

04

Installation crew lead

Typical scope:Oversee safety standards and schedule coordination.

Readiness evidence:Retain safety and coordination records.

Credential boundary:Verify employer requirements.

Next moves:Add evidence of safety and team management.

Transition into carpentry and interior installation

01

Carpentry / interior installation assistant

Typical scope:Assist with woodwork and interior installation under supervision.

Readiness evidence:Retain records of assisted work.

Credential boundary:Verify safety and employer requirements.

Next moves:Add woodwork and interior installation skills.

02

Carpenter or interior installation technician

Typical scope:Independently perform wooden-component or interior installation work.

Readiness evidence:Retain portfolio and work records.

Credential boundary:Verify employer requirements.

Next moves:Add skills and quality evidence.

03

Senior carpenter or interior installation technician

Typical scope:Handle complex processes and quality checks.

Readiness evidence:Retain records of complex processes.

Credential boundary:Verify employer requirements.

Next moves:Add process and training evidence.

04

Work lead

Typical scope:Coordinate crews and operations.

Readiness evidence:Retain crew and operation records.

Credential boundary:Verify employer requirements.

Next moves:Add evidence of management responsibility.

Transition into licensed special operations

01

Special-operations apprentice

Typical scope:Learn electrical or plumbing fundamentals under licensed personnel's supervision.

Readiness evidence:Retain learning and safety records.

Credential boundary:Verify state or local licensing requirements.

Next moves:Add theoretical training and required instructional hours.

02

Licensed apprentice / assistant

Typical scope:Participate in work within the licensed scope under supervision.

Readiness evidence:Retain supervised-work records.

Credential boundary:Verify licensing and employer requirements.

Next moves:Meet additional examination and practical requirements.

03

Licensed tradesperson

Typical scope:Independently perform electrical or plumbing work within the licensed scope.

Readiness evidence:Retain licensing and work records.

Credential boundary:Verify licensing requirements.

Next moves:Add complex-work and compliance evidence.

04

Licensed work lead

Typical scope:Oversee compliance and safety checks.

Readiness evidence:Retain compliance and safety records.

Credential boundary:Verify licensing requirements.

Next moves:Add compliance and team management evidence.

Capability ladder: what demonstrates readiness?

  1. 01

    Check inputs

    Confirm work orders, sites, components, and safety conditions.

  2. 02

    Process control

    Secure, seal, connect, and test according to procedures.

  3. 03

    Review results

    Produce reviewable installation and test records.

  4. 04

    Expand responsibility

    Expand unit and site responsibilities within authorized scope.

Market signals

Market signals and transition directions

BLS Table 1.2 (49-9095) shows about 3,500 U.S. jobs in 2025 and projects 3,700 in 2035 (5.8%), with about 300 openings per year including replacements. Counts are rounded independently.

Three sources, three different measures

US nationwide

2025–2035

US nationwide · Display scope: Manufactured Building and Mobile Home Installers (49-9095.00)

Cumulative growth of 6%

Employment size and change

BLS Table 1.2 (49-9095) shows about 3,500 U.S. jobs in 2025 and projects 3,700 in 2035 (5.8%), with about 300 openings per year including replacements. Counts are rounded independently.

Does not establish:Occupational statistics cannot guarantee individual employment.

US nationwide

2025–2035

US nationwide · Display scope: Manufactured Building and Mobile Home Installers (49-9095.00)

About 300 openings / year

Average annual job openings

BLS Table 1.2 (49-9095) shows about 3,500 U.S. jobs in 2025 and projects 3,700 in 2035 (5.8%), with about 300 openings per year including replacements. Counts are rounded independently.

Does not establish:Cannot represent an individual's probability of being hired.

US nationwide

2025

US nationwide · Display scope: Manufactured Building and Mobile Home Installers (49-9095.00)

$45,990 / year

Median annual wage

The BLS 2025 OEWS nationwide median, not starting pay or take-home income.

Does not establish:Wage percentiles do not represent seniority or include individual take-home income.

Where can your current capabilities transfer?

These are capability relationships, not automatic promotions or credential waivers.

Carpenters

Evidence to add

Transfers:Transferable capabilities: safety and protection procedures, work-order and drawing interpretation, measurement and securing, line interface connections and testing, tool use and maintenance, outdoor work and work at height, and on-site communication and documentation.

Build next:First target, carpenter: add layout, cutting, and joining of wooden structures / components, drawing dimensions, and carpentry quality control. Measurement and tool experience in unit installation does not automatically establish wooden-structure fabrication ability; verify safety and authorization for the target trade.

View career profile

Construction Laborers

Evidence to add

Transfers:Foundation in site construction and tools.

Build next:Check the target construction type, site preparation, material handling, and safe use of corresponding construction tools. Whole-home installation interface experience cannot replace general construction training for different building types.

View career profile

Drywall and Ceiling Tile Installers

Evidence to add

Transfers:Foundation in site construction and dimensions.

Build next:Add interior panel installation skills.

View career profile

Electricians

Evidence to add

Transfers:Electrical fundamentals and safety awareness.

Build next:Add licensing and compliant wiring skills.

View career profile

Plumbers, Pipefitters, and Steamfitters

Evidence to add

Transfers:Piping fundamentals and safety awareness.

Build next:Add licensing and pressure-piping work skills.

View career profile

Roofers

Evidence to add

Transfers:Foundation in outdoor work and work at height.

Build next:Add roofing and waterproofing techniques.

View career profile

FAQs and boundaries

What are everyday work and working hours like?

On this page, manufactured building and mobile home installers refers to O*NET 49-9095.00: workers who move or install mobile homes and manufactured buildings. Tasks include checking components and requirements against work orders, estimating materials and planning operations, leveling and securing foundations and units, sealing module openings, connecting and testing water, electrical, gas, and other lines, installing doors, windows, hardware, and appliances, inspecting and testing operating conditions, repairing leaks and structural frames, and completing cleanup and handover. Work mainly takes place at owners' sites, parks, and outdoors. This occupation is distinct from carpenters, construction laborers, drywall and ceiling tile installers, electricians, or plumbers.

How does this occupation differ from adjacent occupations?

Carpenters make and install wooden structures; construction laborers perform general site construction; drywall and ceiling tile installers work on interior walls and ceilings; electricians handle electrical wiring; plumbers handle water, drainage, and gas piping. Manufactured building and mobile home installers focus on whole-unit installation and commissioning of mobile homes and manufactured buildings. Compare work subjects, interface requirements, licensing boundaries, and responsibilities to distinguish them.

What signals suggest this occupation may suit me?

Observable signals: following safety procedures, strong hands-on and measurement skills, reading work orders and drawings, sustaining work in outdoor weather, and pausing and escalating uncertainty. O*NET interest code RC describes activity preferences only and cannot determine competence or qualifications.

How will AI affect this occupation?

Tools for work-order scheduling, lists and material estimates, and record organization may assist with planning operations, checking components, and drafting records. People remain responsible for positioning and securing units, sealing, connecting and testing lines, structural repairs, and safe work. This page presents tool uses only as task hypotheses, not evidence of widespread organizational adoption.

Which judgments must remain a human responsibility?

Human responsibilities include checking work orders and site conditions, judging whether structures and securing meet standards, confirming interfaces and test results, distinguishing licensed-work boundaries, implementing protection before work at height or with hazardous equipment, and taking responsibility for installation quality and safety.

Source: FermatMind|This page|This page|Editorial explanation
What wage evidence is available for mainland China?

Insufficient evidence: the National Bureau of Statistics industry wage materials checked for this page did not provide a nationwide occupational median exactly matching this occupation; failure to obtain it does not prove none was published. In 2025, construction paid 92,036 yuan / year in urban non-private units and 66,275 yuan / year in urban private units, while the nationwide total for urban non-private units was 129,441 yuan / year. These industry or overall averages provide broad industry context only. They do not show that this occupation mainly falls in that industry or equal its median or starting pay. The Ministry of Human Resources and Social Security's enterprise compensation survey information is retained as a lookup entry point.

What wage evidence is available for the United States?

The May 2025 U.S. national median was USD 45,990 a year and USD 22.11 an hour. The annual 10th, 25th, 50th, 75th and 90th percentiles were USD 27,120, 35,800, 45,990, 51,970, 60,810.

What are the entry and training pathways?

BLS lists a high school diploma or equivalent and short-term on-the-job training as typical preparation. Verify equipment, connection and acceptance responsibilities for each project. A Hunan project report describes large concrete modules and the need to check transport and lifting space. It illustrates site conditions for one type of modular project.

What are the main risks and control boundaries?

Main risks include structural and securing failures, water, electrical, and gas interfaces and safety, work at height and hazardous equipment, licensing boundaries and compliance, and weather and schedules. Controls include securing and sealing according to procedures, working within licensing boundaries and testing interfaces, implementing protection for work at height and hazardous equipment, and adjusting plans for weather. Check specific rules against employer procedures and applicable regulations.

How should market signals be interpreted?

BLS Table 1.2 (49-9095) shows about 3,500 U.S. jobs in 2025 and projects 3,700 in 2035 (5.8%), with about 300 openings per year including replacements. Counts are rounded independently.

Is this occupation worth exploring further?

If you can perform outdoor and physical work under safety procedures and read work orders and drawings, a low-cost exercise with entirely fictional work orders and component lists is worthwhile. Moving into carpentry, electrical work, or plumbing requires additional corresponding skills and licensing qualifications. Use the A/B/C texts above only for paper checks and handover drafts; do not perform actual installation, interface connections, or testing.

What are the limits of using this page?

Evidence for China, the United States, and individual organizations is presented separately. Conclusions on wages, employment, qualifications / licensing, safety, and AI must not be combined across scopes. The manufactured building and mobile home installers page provides occupational judgment and installation exercise information and does not replace local laws, safety standards, or other professional advice. Any statement of insufficient evidence means only that safely matched data was not established within a bounded search; proxies or memory are not used to fabricate figures.

Paper exercise answer key (open after completing)

Only P1 is ready for review in the original. P1 and P2 are ready in the variant, while P3’s tag remains unresolved. A review handoff does not record completed installation or acceptance.

Sources

FermatMind research workflow

2025-05

O*NET 49-9095.00 National Wages (BLS OEWS Display)

  • O*NET 49-9095.00 Manufactured Building and Mobile Home Installers (Summary)O*NET OnLine, U.S. Department of Labor|United States|O*NET 2026 occupational profile; accessed 2026-09-25|official occupation summary
    View original source:O*NET 49-9095.00 Manufactured Building and Mobile Home Installers (Summary)
    • Provides occupational identity, the official description, interest code, Job Zone, skills, and knowledge for 49-9095.00.
    • Wage and employment data on that page cover this occupation, 49-9095.00.

    Limitations:Applies only to 49-9095.00 and the US market; does not establish a mapping to China.

  • O*NET 49-9095.00 TasksO*NET OnLine, U.S. Department of Labor|United States|O*NET 2026 occupational profile; accessed 2026-09-25|official occupation task list
    View original source:O*NET 49-9095.00 Tasks
    • Provides tasks including moving and installing mobile homes or manufactured buildings, sealing module openings, connecting and testing lines, estimating materials and planning operations, installing and replacing doors, windows, hardware, and appliances, inspecting and testing operating conditions, and repairing leaks and structural frames.
    • Task examples do not mean every position performs every task.

    Limitations:Task examples do not mean every position performs every task; they do not establish a mapping to China.

  • O*NET 49-9095.00 Work ContextO*NET OnLine, U.S. Department of Labor|United States|O*NET 2026 occupational profile; accessed 2026-09-25|official occupation profile
    View original source:O*NET 49-9095.00 Work Context
    • Describes contexts including hazardous equipment exposure, prolonged standing, bending, twisting, kneeling and crouching, outdoor work in all weather, work at height, and workweeks exceeding 40 hours for most respondents.
    • US work context does not replace Chinese law or employer procedures.

    Limitations:US work context does not replace Chinese law or employer procedures.

  • O*NET 49-9095.00 National Wages (BLS OEWS Display)O*NET OnLine using U.S. Bureau of Labor Statistics data|United States|2025-05|O*NET display of BLS OEWS wage data
    View original source:O*NET 49-9095.00 National Wages (BLS OEWS Display)
    • The May 2025 U.S. national median was USD 45,990 a year and USD 22.11 an hour. The annual 10th, 25th, 50th, 75th and 90th percentiles were USD 27,120, 35,800, 45,990, 51,970, 60,810.

    Limitations:National occupational distribution. Local wages and individual offers vary.

  • O*NET 49-9095.00 National Employment TrendsO*NET OnLine using U.S. Bureau of Labor Statistics data|United States|Occupational profile or live lookup|official employment data
    View original source:O*NET 49-9095.00 National Employment Trends
    • The employment projections shown here come from BLS Table 1.2.
    • The employment projections shown here come from BLS Table 1.2.

    Limitations:Projections are not a hiring guarantee; above average does not mean individual opportunities necessarily increase.

  • Industries: 49-9095.00O*NET OnLine, U.S. Department of Labor|United States|O*NET industry data current 2026; accessed 2026-09-25|official industry distribution
    View original source:Industries: 49-9095.00
    • The main industries on that page for 2024 are Retail Trade and Manufacturing.
    • Industry distribution signals employer settings, not projected growth or demand.

    Limitations:Industry distribution signals employer settings, not projected growth or demand.

  • O*NET 49-9095.00 Education and Occupational PreparationO*NET OnLine, U.S. Department of Labor|United States|O*NET 2026 occupational profile; accessed 2026-09-25|official occupation profile
    View original source:O*NET 49-9095.00 Education and Occupational Preparation
    • Among education respondents for this occupation, 59% report less than a high-school diploma, 40% high school or equivalent, and 1% a postsecondary certificate. This is a survey of new-hire education requirements, not evidence of no educational threshold or legal authorization. The general Job Zone 1-2 description typically indicates high school / GED, with exceptions for some occupations; on-the-job training is approximately several days to one year.
    • Education distribution does not establish a mandatory requirement for every employer.

    Limitations:Education distribution does not establish a mandatory requirement for every employer; it does not establish a mapping to China.

  • Licenses & Certifications: 49-9095.00O*NET OnLine, U.S. Department of Labor|United States|current page; accessed 2026-09-25|official license and certification directory
    View original source:Licenses & Certifications: 49-9095.00
    • O*NET provides US state licensing and national certification lookup entry points; licensing requirements for water, electrical, gas, and other line work must be checked by state.
    • Certificates and training do not equal authorization to practice or employer hiring requirements.

    Limitations:Certification and training do not equal a scope of practice or employer hiring; check the applicable jurisdiction.

  • market_signalInternational Labour Organization|Global task research|ILO Working Paper 140, 2025; accessed 2026-09-25|official research report
    View original source:market_signal
    • Assesses occupational exposure to generative AI at the task level for task-level discussion.
    • An exposure index is not an adoption rate, job outcome, or hiring probability.

    Limitations:Task exposure does not equal implemented automation, adoption, or layoffs; individual outcomes are not inferred.

  • Average Annual Wages of Employees in Urban Units in 2025National Bureau of Statistics|Nationwide mainland China scope|2025 wages; published 2026-05-15; accessed 2026-09-25|official industry wage statistics
    View original source:Average Annual Wages of Employees in Urban Units in 2025
    • Provides average annual wages by industry category for urban non-private and private units, including construction, to check the scope of publicly available Chinese wage data.
    • Industry averages are not occupational medians and exclude individually owned businesses and freelancers.

    Limitations:Industry averages are not occupational medians and exclude individually owned businesses and freelancers; no nationwide wage distribution matching the exact occupation was established.

  • Enterprise Compensation Survey Information (2024)Ministry of Human Resources and Social Security|Urban enterprises in mainland China|2024 reference year; published 2025-06; accessed 2026-09-25|official enterprise wage survey
    View original source:Enterprise Compensation Survey Information (2024)
    • The Ministry of Human Resources and Social Security's enterprise compensation survey information provides a pay lookup entry point by occupation / position.
    • Covers urban enterprises, excluding government agencies and public institutions; this page did not obtain an entry matching 49-9095.00 exactly.

    Limitations:Covers urban enterprises, excluding government agencies and public institutions; this page did not obtain an exact occupational match and does not use it as a nationwide median.

  • Tasks on this pageFermatMind|This page|This page|Editorial explanation
    • Tools may help organize records. Verify key information against the original.
    • Tools may help organize records. Verify key information against the original.

    Limitations:This explanation does not measure adoption or work outcomes.

  • HUD Manufactured Home Installation and Housing InformationHUD|United States|Current webpages / regulations, accessed 2026-10-11|official installation or safety guidance
    View original source:HUD Manufactured Home Installation and Housing Information
    • US HUD housing types, state / HUD installation regimes and licensing; not rules for all manufactured buildings.

    Limitations:Check US applicability against the documents; does not establish Chinese qualification mappings or cover all manufactured buildings.

  • 24 CFR 3285 Installation StandardseCFR / HUD|United States|Current webpages / regulations, accessed 2026-10-11|official installation or safety guidance
    View original source:24 CFR 3285 Installation Standards
    • Applies to initial installation of new manufactured homes, manufacturer instructions, and applicable support and anchoring plans; not all repairs to older homes.

    Limitations:Check US applicability against the documents; does not establish Chinese qualification mappings or cover all manufactured buildings.

  • 24 CFR 3286.205 Installation Licensing PrerequisiteseCFR / HUD|United States|Current webpages / regulations, accessed 2026-10-11|official installation or safety guidance
    View original source:24 CFR 3286.205 Installation Licensing Prerequisites
    • Experience / education, training, examination, and other prerequisites for HUD-administered installation program licensing; not uniform nationwide requirements for all building trades.

    Limitations:Check US applicability against the documents; does not establish Chinese qualification mappings or cover all manufactured buildings.

  • OSHA Fall ProtectionOSHA|United States|Current webpages / regulations, accessed 2026-10-11|official installation or safety guidance
    View original source:OSHA Fall Protection
    • Protection depends on work category, unprotected edges and openings, and hazardous equipment; a uniform height threshold or wearing a harness alone cannot be applied.

    Limitations:Check US applicability against the documents; does not establish Chinese qualification mappings or cover all manufactured buildings.

  • 49-9095U.S. Bureau of Labor Statistics|United States|2025–2035
    View original source:49-9095
    • BLS Table 1.2 (49-9095) shows about 3,500 U.S. jobs in 2025 and projects 3,700 in 2035 (5.8%), with about 300 openings per year including replacements. Counts are rounded independently.
    • BLS lists a high school diploma or equivalent and short-term on-the-job training as typical preparation. Verify equipment, connection and acceptance responsibilities for each project.

    Limitations:Employment and openings are rounded independently. Openings include replacements.

  • Named work exampleHunan Housing and Urban-Rural Development Department|Mainland China|2026-07
    View original source:Named work example
    • A Hunan project report describes large concrete modules and the need to check transport and lifting space. It illustrates site conditions for one type of modular project.

    Limitations:This case does not establish national pay, entry requirements or hiring.

  • Paper exerciseFermatMind|This page|This page
    View original source:Paper exercise
    • Inputs and results are fictional.

    Limitations:Checks the paper records only.

  • O*NET® 31.0 Core Task StatementsU.S. Department of Labor, Employment and Training Administration|United States|O*NET 31.0|Primary document
    View original source:O*NET® 31.0 Core Task Statements

    Limitations:Verbatim Core Task Statements excerpted from the O*NET® 31.0 Database, used under CC BY 4.0. U.S. occupational scope.

  • O*NET® database license · CC BY 4.0U.S. Department of Labor, Employment and Training Administration|United States|O*NET 31.0|Primary document
    View original source:O*NET® database license · CC BY 4.0

    Limitations:Verbatim Core Task Statements excerpted from the O*NET® 31.0 Database, used under CC BY 4.0. U.S. occupational scope.

O*NET describes the tasks, OEWS provides wage estimates, and BLS Table 1.2 provides employment projections.

Manufactured Building and Mobile Home Installers: Tasks, Pay and Training | FermatMind